Laserfiche WebLink
E BLACK&VEATCH <br />October 23, 2018 <br />City of Santa Ana <br />Planning and Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Sanra Ana, CA 92702 <br />(7 t4) 647 -5800 <br />Project Description:Advanced Microgrid Solutions Battery Energy Storage <br />l85l East First Street, Santa Ana, CA 92705. <br />Santa Ana City lnspector: <br />The proposed S-foot wide sidewalk is to be constructed adjacent to the parking garage and above the <br />parking garage foundation- The sidewalk will not be connected to the footing. The proposed concrete <br />pad is also to be constructed parallel to the parking garage footing and will not be connected to the <br />footing. <br />Please contact Gary Sommerfeld in our Kansas City office ifyou have any questions or comments. <br />Bla.k & Veatch <br />6800 W. 115th Street, Suite 2292 <br />Overland Park, Kansas 66211 <br />Gary Sommerfeld, P.E.,G.E. <br />6800 W. I l5rt Street, Suite 2292 <br />Overland Parlq KS 6621 I <br />913-458-9319 <br />SommerfeldG@BV.com 'to/23/20ta <br />* <br />c <br />CA <br />OF <br />s o <br />1C8 566 <br />BLACK & VEATCH CoRPoRATIoN . 6800 W 1 15s St. . Ovedand Pa, KS 6621 1