Laserfiche WebLink
RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 cBC 2013 <br />Solar Photovoltaic (PV) Checktist for Detached SINGLE FAMILy RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO s ets of plans, of <br />minimum 11" x 17" size. lf answerin NO lo anv of the ouestion s. Dlan check shall be re qu ired. <br />Project Address:5407 W. BALLAST AVE, SANTA ANA, CA 92704 <br />Contractor Company Name:SOUTHWEST SUN SOLAR, INC <br />contractor License Number: 1004667 <br />YES NO Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Wll the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mounted to the existing root so that lhe plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Wll the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counler-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on lhe plans? <br />Will the minimum 5/16, lag screws be installed with a minimum of 2-il2 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />1E D <br />2 Etr <br />Ettr <br />tstrEu <br />Etr <br />EID <br />4 <br />6 <br />7 <br />8 trtr <br />I Etr <br />10 tstr <br />licensed professional engineer? (including project specific site plan, pV la yout, <br />anchorage spacing, anchorage details and manufacturels pV support tion.) <br />I certify under penalty of perjury under the laws of the State of California he above is true: <br />print Name: TRANG CONG PHAIV <br />Phone Number: 714 582 3909 <br />Signature: <br />Date: <br />Emait Address: PERIV lT@SOUTHWESTSUNSOLAR.COw <br />Rev:811712015 <br />t9 <br />,**SNTA <br />NA,'ffiffi <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box '1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647.5800 <br />www.santa-ana.org