My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10195409 - Permit
PBA
>
Building
>
Permits
>
H
>
Hotel Terrace Dr
>
2620 S Hotel Terrace Dr
>
10195409 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2021 8:43:35 AM
Creation date
6/3/2021 8:43:34 AM
Metadata
Fields
Template:
Permit
Permit Number
10195409
Full Address
2620 S Hotel Terrace Dr
Permit ID
238018
Master ID Number
2017-133818
Project Name
Clarion Inn & Suites Breakfast Room TI
Street Number
002620
Street Direction
S
Street Name
Hotel Terrace
Street Suffix
Dr
Building Use Code
Hotel/Motel
Job Types
Tenant Improvement
Permit Type
Building
Applied Date
1/29/2018
Issued Date
6/5/2018
Finalized Date
11/9/2018
Flood Zone
X-0602320278J
Description of Work
Remove interior walls & (3) restrooms to convert guest rooms 112, 114, & 116 into a breakfast area & a utility storage room. Add buffet counter & equipment. B occupancy with occupant load of 42. Max.
Nature of Work
Breakfast Area/Utility Storage Room
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.LA ,,r-! A'r3';' ac;'o{.l <br />Los Angeles Regionol Uniform ,'LARUCPT <br />Code Progrom "'n"".."*-,*.1' <br />STRUCTURAL OBSERVATION REPORT FORM <br />STRUCrURAL OBSERVATION msans lhe visua/ obsaNalion ol the structural syslam, fot gonoral contormance to tho aryroved <br />plans and specificotions, at signilicant construction stagos and at complotiotl ol the structunl systafi. Slructural obso".?alion does <br />not includo or waivo tho rcsponsibility lor lhe inspactions rcquired by Section 108, 1701 or other seclions ol tha coda. <br />Report No. 1 <br />h 30th of JUNEThisrl rncludes all construction work throu 20 1 P No. lofl <br />EOS ELEM€N'3 <br />[: M6l Foundataon <br />{lr57*tt nzt o*t <br />of EPcx'Y <br />bowPt ( <br />lNTo €"xttft^/6 <br />F0o7t /v(" <br />@ zu're6'o11 <br />Stas * poor,i" <br />[J Carsson, Piles, Grad€ <br />86ams <br />ALL WORK WAS PERFORMED ACCORDING TO PLANS <br />Design Concepts - Shiv Talwar <br />a <br />909-510-051 2 <br />Phone NoProiecl Addre8s: <br />2620 HOTEL TERRACE DRIVE, SANTA ANA. CA 92705 <br />Building Peml No Slruclural Obsarvallon perlomed by' <br />Shiv Talwar - Principal Architect <br />Proiessional Lic /Reg No otobsorver <br />c-23417 <br />FOUNOA'ION FRAMES FLOOR <br />I Fooling. Stem Walls Lll Concrete i: Steel Mom€nl Frame D Concrete <br />fJ i/asonry fl Steel Braced Frame fl Steel Deck <br />L-lwood I wood <br />[ 1 aetainrng Foundatrcn <br />Hillside Special Anchors <br />D Masonry Wall Frame <br />[Z others: <br />FPo>U ANt-t+&, <br />NO DEF]CIENCIES FOUND, <br />I DECLARE THAT THE FOLLOWNG STATEiIENTS ARE TiUE TO THE BeST Of MY KNOWLEOGEi <br />1. I A" THE E},IGINEER OR ARCHITECT R€TAINED BY T'IE OWI{ER TO BE IN RESPONSTBLE <br />CHARC€ FORTHESTRUCTURAT OBSERVATION IN ACCORDANCE WITH THE REOUIREMENTS <br />OF IHE CIIY OF LOS A}IGELES. <br />2. I. OR AIIOTHER ENGI}IEER OR ARCBITECT WHO I HAVE DESIGNAIED ABOVE ANO IS UI,IDER <br />L€ CHARGE, HAS PERFORIIiED THE REQUIRED SITE VISITS AT EACH <br />UCTION STAGE TO VERIFY IF THE STRUCTURE IS IN GEI{ERAL <br />PROVED PLAIIS ANO SPECIFICATIONSi <br />S WHICH R€MAIN TO BE CORRECTED HAVE BEEI'I II{DICATED <br />PTAI{CE OF THE STRUCTURAL SYSTEMS AY TXE CITY OF LOS <br />NTIL ALL RVEO DEFICIENCIES ARE CORRECTEO <br />io <br />SIGNAI S'i MP OF STRUCTUNAL OBSER\€R ] <br />ALL NOTEO DEFICI <br />AtsOVEt <br />1, IR€COIIIIMEND THAT <br />ANG€LES AE \IVITHHE <br />tC-f3 11 <br />ty,t0 <br />NOTED DEFICIENCIES with the proposed corresponding correclive actlons with respect lo gonoral conformance <br />with the approvod plans or in the load path; ( A fina! report by the structural obseNor which slates that all obseNed <br />deficiencies have been rcsolved ;s rcgured befaro accoplance ol tho work by the building officials.) <br />OBSERVED PREPARATION AND INSTAL.LMENT OF EPOXY DOWELS INTO EXISTING FOOTING. <br />Phon€ No. o! Observer <br />909-5'10-051 2 <br />ELEtiIENTS/ cONNEcTlox <br />OBSERVATIOI.I LOCATiON <br />flcgncrete Mgment <br />Frame <br />I otners i otners: <br />il othersr <br />a
The URL can be used to link to this page
Your browser does not support the video tag.