Laserfiche WebLink
NT+ <br />NA,tffi <br />Planning & Building Agency <br />Building Satety Division <br />20 Civic Center Plaza <br />P,O. Box 1988 ([4-19) <br />Santa Ana. CA 92702 <br />(711) 647.5800 <br />www.santa-ana.org <br />. <br />s:iL.0, c5a lltl <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIOENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section belo\/. Acopyof this form shali be attached to each of TU/O sets of plans, of <br />n'rinimum 1 1 ' x '17" size lf answerinq NO to anv of the oues tions. olan check shall be required <br />Contractor Company Name: <br />Contractor License Number: <br />SunPower Corporation. Systems <br />89089s (A, B, C-10, C-46) <br />RESIDENTI.AL <br />PHOTOVOLTAIC <br />CHECKLIST <br />Are the foltowing applicable to th-. proposed project? <br />Ui ill the PV system layout prov de the required threeJoot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof ha'iing only one roofing layer with no <br />overlays? <br />U/ill the PV array be flush mounted to the existing roof so that the plane of the <br />rnodules (panels) are parallel to the plane of the roof? <br />U/ill the PV system weigh maximum 4 pounds per square feet or less? <br />Wlll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will lhe PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />S/ill the anchors be installed with a maxirnum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will lhe minimum 5/16" lag screws be installed with a minjmum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed pro{essional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support informalion.) <br />4 <br />5 <br />2 <br />3 <br />5 <br />tr <br />Ztr <br />Es <br />EE <br />V tr <br />tr <br />tr <br />tr <br />tr8 <br />c <br />,oftr <br />lcertify under penalty of perjury under the laws o( th <br />pr nt Narne: Brooke Vestermark <br />Phone N! rnber <br />California tbit the above is truea.Ave State of <br />Signature <br />Email Address brooke.vestermark@sunpower.com <br />{ <br />{ <br />{ <br />{ <br />{ <br />Rev 1l | 9/?015 <br />Dar- I I /29/ t8 <br />Project Address: