My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10177791_2102 N. TUSTIN - Plan
PBA
>
Building
>
Plans
>
T
>
Tustin Ave
>
2102 N Tustin Ave
>
10177791_2102 N. TUSTIN - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2026 3:33:39 AM
Creation date
10/25/2020 5:13:30 PM
Metadata
Fields
Template:
Plan
Permit Number
10177791
Full Address
2102 N Tustin Ave
Street Number
2102
Street Direction
N
Street Name
Tustin
Street Suffix
Ave
Fully Linked
True
Document Relationships
10177791 - Permit
(Permit - Plan)
Path:
\Building\Permits\T\Tustin Ave\2102 N Tustin Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CERTIFICATE OF COMPLIANCE (Part 3 of 3)ENV-1 C <br />AND FIELD INSPECTION ENERGY CHECKLIST <br />Project Name Date <br />Catalina Commercial Center 3/27/2013 <br />Required Acceptance Tests <br />Designer: <br />This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope <br />Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that <br />require an acceptance test. If all the site-built fenestration of a certain type requires a test, list the different fenestration <br />products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices <br />- Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible <br />party to budget for the scope of work appropriately. <br />Enforcement Agency: <br />Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new <br />fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. <br />The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the <br />boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the <br />enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance <br />information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled <br />out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different <br />fenestration product line must be provided to the owner of the building for their records. <br />Test Description <br />Fenestration Products Name or ID <br />Requiring Testing or Verification <br />STARPHIRE SOLARBAN 60 (2) Bronze <br />ENV-2A Test Performed By: <br />Area of like Building Envelope <br />Products Acceptance Test <br />1,687 0. <br />EnergyPro 5.1 by EnergySoft User Number: 6055 RunCode: 2013-02-27T09:46:35 ID: CO7429 Page 8 of 14
The URL can be used to link to this page
Your browser does not support the video tag.