My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20170814 - Permit
PBA
>
Building
>
Permits
>
R
>
Rene Dr
>
1405 S Rene Dr
>
20170814 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2021 12:56:59 PM
Creation date
6/3/2021 12:56:57 PM
Metadata
Fields
Template:
Permit
Permit Number
20170814
Full Address
1405 S Rene Dr
Permit ID
263295
Master ID Number
2020-157803
Project Name
Miscellaneous Counter1 Permit
Street Number
001405
Street Direction
S
Street Name
Rene
Street Suffix
Dr
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
2/14/2020
Issued Date
2/14/2020
Finalized Date
2/28/2020
Flood Zone
X-0602320257J
Description of Work
Electrical for-Install new roof mounted solar PV system. ALL SOLAR FEES PAID ON 101103148
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PROCESS FOR SMALL-SCALE PV SYSTEMS <br />STANDARD STRINC SYSTEM <br />The information in this guideline is intended to help local jurisdictions and contractors identify when Pv syslem installations <br />are simpfe, needing only a basic review and when an installation is more complex. Ir is likely rhar 50 % -75% of all residenrial <br />systems will comply with these simple criteria. For proJects that fail to meet the simple criteria, resolution steps have been <br />suggested lo provide as a path to permir approval. <br />Required InJonnation for Permit: <br />l. Site plan showing location of ma.1or components on the property. This drawing need not be exacdy to scale, but it <br />should represent relative location of components at site (see supplied example sire plan). PV arrays on dwellings <br />with a 3'perimeter space at ridge and sides may not need separate hre service review <br />2. Electrical diagram showing PV array connguration, wiring system, overcurrent protecrion, inverter, disconnects, <br />required signs, and ac connecrion to building (see supplied srandard elecrrical diagram). <br />3. Specifrcation sheets and installation manuals (if available) for all manufacrured componenrs including, but nor <br />limited to, PV modules, inverter(s), combiner box, disconnecrs, and mounring syscem. <br />Step 1 : Structural Review o[ PV Array Mounting System <br />ls the array to be mounted on a defined, permitted roof structure? Eyes Eno <br />Il No due to non-compliant roof or a ground mount, submit completed worksheet lor the structure WKS t . <br />Roof InJofination: <br />l. Is the roofing type lighrweighr (Yes = composirion, lighrweighr masonry, meral, erc.. )COMP SHINGLE <br />If No, submit completed worksheet Jor rooJ structure WKS 1 (No = heavy masonry, slate, etc . . .) <br />2. Does the roof have a single roof coveringf Eyes Eno <br />If No, submit completed worksheet Jor rooJ structure WKS 1 . <br />5. Provide method and rype of weatherproohng roof penerrarions (e.g. flashing, caulk)Flashing <br />Mounting Systeln Inforrnat ion: <br />1 . Is the mounting srructure an elgineered product designed to mount PV modules with no more than an 18" gap <br />benealh rhe module frames? E yes E r,lo <br />$ No, provide details oJ structural atta.chmcnt certijed by q design professional. <br />2. For manuFactured mounring systems, frll out information on the mounting sys[em below: <br />a. Mounting System Manufacturer EcoFasten Producr Name <br />"n6 <br />Yo4"1g Rock it <br />b. Total Weigh t ot PV Modules 3n6 32115 712.4 lbs <br />c. Toral Number of Attachment Poinrs 22 <br />d. Weight per Atrachmenl Point (b - c)32.4 bs (if greater than 45 lbs. see WKS I ) <br />e Maximum Spacing Between Atnchment Points on a Rail 48 inches {see producr manual for <br />maximum spacing allowed based on maximum design wind speed) <br />t.Total Surface Area of PV Modules (square feeo 246.5 fc <br />Distributed Weight of PV Module on Roof (b + f)2.9 lbs/ftr <br />II distributed w€ight of the PV system is greater than 5 lbste, see WKSI . <br />Step 9: Electrical Review o[ PV System (Calculations lor Electrical Diagram) <br />In order for a PV system to be considered for an expedited permit process, the fotlowing must apply: <br />l. PV modules, utility-inreractive inverters, and combiner boxes are identifred for use in PV systems. <br />2. The PV array is composed of 4 series strings or less per inverter. <br />3. The total invener capacity has a conrinuous ac power output 13,440 Watts or less <br />4. The ac interconnecrion point is on the load side of service disconnecting means (690.64(8)). <br />5. Oneof the skndard electrical diagrams (E 1 . 1 , E I . I a, E I . I b, or E l I c) can be used ro accurarely represenr rhe PV <br />system. Interactive PDF diagrams are available at www.solarabcs.orgi permitting. <br />Fi out the standard electrical diq.gram completely A guide to the electrical diogram is provided to hetp the appticant <br />understand each blank to jll in. l.f the electrical system is more complex than the standard electrical diagratn can elJecttvely <br />communicote, provide an altefiatiye diagrqm with awropriate detail. <br />2 lxPT[)ITEt) PERMIT PRoCEss FoIi. I)V SYSTEM5
The URL can be used to link to this page
Your browser does not support the video tag.