Laserfiche WebLink
EXPEDITED PERMIT PRoCESS FOR SMALL-SCALE PV SYSTEMS <br />STANDARD STRING SYSTEM <br />The information in this guideline is intended to help local jurisdictions and conractors identify when PV system installations <br />are simple, needing only a basic review and when an insrallation is more complex. It is likely that 50% -75% of all residential <br />sysrems will comply with rhese simple criteria. For projects that fail to meet the simple criteria, resolution sreps have been <br />suggested to provide as a path to permit approval. <br />Required lflJofination for Petmit: <br />L Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it <br />should represent relative locarion of components at site (see supplied example site plan). PV arrays on dwellings <br />wirh a 3'perimeter space at ridge and sides may not need separate frre service review. <br />2. Electrical diagram showing PV array conhguration, wiring system, overcurrent protection, invertet disconnects, <br />required signs, and ac conneclion to building (see supplied standard electrical diagram). <br />3. Specification sheets and installation manuals (if available) for all manulactured componenls including, but not <br />limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. <br />Step 1 : Structural Review o[ PV Array lVlounting System <br />Is the array to be mounted on a defined, permitted roof structure? Ey"t EI,.lo <br />IJ No due to non-compliqnt rooJ or a ground mount, submit completed worhsheet for the structure wKSl. <br />RooJ Information: <br />I . Is rhe roohng rype lighrweight (Yes = composition, lightweight masonry, metal, etc...)COMP SHINGLE <br />f No, submit completed worksheet for rool structure WNSI (No = heavy masonry, slate, etc...) <br />2. Does the roof have a single rooF coveringt Eyes Eno <br />I.l No, submit completed worksheet jor roof structure wKSl . <br />f. Provide method and type of weatherproofing roof penerrarions (e.9. flashing, caulk)FLASHING Y CAULK <br />M o unting Sy s tem ltlfor mation : <br />l. ls the mounting slructure an <br />beneath the module frames? <br />en <br />Yes !No <br />IJ No, prottide detatls of structural attachment cettifed by a design prokssional. <br />2. For manulactured mounting systems, fill oul inlormaLion on the mounting system below <br />a. Mounting syslem Manufacrurer 3Y$I9lllProduct Name and lModel#CLASSIC COIUPOSITION [,4OUNT <br />bs <br />ineered product designed to mount PV modules with no more than an 18' gap <br />b Total weig <br />c. Total Numb er of Atrachment Points 2o <br />d. weight per Artachment Point (b : c) <br />e. Maximum Spacing <br />ht of PV Modules un6 n2115 892 <br />44.6 bs (iI greater lhan 45 lbs. see WKS] ) <br />Between Attachment Points on a Rail 72 inches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />lbsi frl <br />If distributed weight ol the Pv system is greater than 5 lbstt'z, see WRSI . <br />Step 2: Electrical Review o[ PV System (Calculations lor Electrical Diagram) <br />In order for a PV system to be considered for an expedited permit process, the following must aPpty: <br />l. PV modules, utility-interactive inverters, and combiner boxes are idenrified for use in PV systems. <br />2. The PV array is composed of 4 series srrings or less per inverter. <br />3. The total inverrer capacity has a continuous ac power outpuL 13,440 watts or less <br />4. The ac inrerconnection point is on rhe load side of service disconnecting means (690.64(8)). <br />5. One of the standard electrical diagrams (E l. I , E I . I a, E I . 1 b, or E I I c) can be used to accurately represent the PV <br />system. lnteractive PDF diagrams are available at www.solarabcs.org/permitting. <br />Fill out the stqndsrd electrical diagram completely. A guide to the electrical diagram is provided to hetp the applicant <br />understand each blank tofll in. A the electrical system is more complex than the standsrd electical diagram can elfectively <br />communicate. provide an alternative diagram with appropriate detqil. <br />2 ExPEDITED PERMIT PRoCESS FoR PV SYsTEMs <br />r.Total Surface Area of PV Modules (square feet) <br />Disrribured Weight of PV Module on Roof (b + 0 <br />986 <br />0.90