Laserfiche WebLink
SOLID COVER 5.0 POST SPACINGS FOR PAHO AND COMMERCIAL COVERS IN 90 MPH WIND AREAE <br />0.042"x3"x8" Box Beam (Detail N30)Double,1.042"x3"x8" Beam (Detail N25)Double (.040"x2"x6.625" Beam (Detail N25) <br />TABLE 5.1 Attached Freestanding or Attached Freestanding or Attached Freestanding or <br />Structure Multispan Units Structure Multispan Units Structure Multispan Units . <br />GROUND TRIB POST POST MAX MAX POST LENGTH MAX MAX POST LENGTH MAX MAO< POST LENGTH GROUND <br />SNOW WIDTH SPACING REQ'D POST MIN FOOTER 8' |10 | 12'POST MIN FOOTER 8 |10 | 12'POST MIN FOOTER 8'1 W 1 17 SNOW <br />LOAD (FT)ON SLAB FOR SPACING POST SIZE CONSTRAINED FOOTER SPACING POST StZE CONSTRAINED FOOTER SPACING POST SIZE CONSTRAINED FOOTER LOAD <br />(PSF)(FT)SLAB (Fn TYPE d d· I 'd' 1 *d"(FT)TYPE ·d·-d- | .d | /£(FT)TYPE ·d·4 | -d- | 4 (PSF) <br />(In) (In)(in) I M (in) (in) I on) I (In)(in) (In)(in) 1 (In) <br />90 MPH EXPOSURE C or 105 4 PH EXPCSURE 8 <br />20 3 11'-10" A 6'-5" A 18 24 25 26 12'-2= C 22 27 29 30 11'4 8 21 26 27 29 60 <br />LIVE 3.5 10'-2-A 5-9- A 18 23 25 26 11-1- 0 23 26 28 30 10'-1- C 22 25 27 28 <br />LOAD 4 8'-11·A 57 A 18 23 24 25 10'-3- C 23 26 28 29 94-C 22 25 26 28 <br />ONLY 4.5 7'-11-A 4'-8- A 18 22 24 25 9'-6- C 23 26 27 29 848- C 23 24 26 27 <br />5 7'-1"A 4'-3" A 19 22 23 25 8'-10- C 24 25 27 28 87 C 23 24 26 27 <br />5.5 6'-5-A 4·-0" A 19 21 23 24 8'-4-C 24 25 26 28 74 C 23 24 25 27 <br />6 5'-11'A 3-8" A 19 21 23 24 7-10- C 24 25 26 28 7-3 C 23 23 25 26 <br />6.5 5'-5"A 3'-5" A 19 21 22 24 7-5- C 24 24 26 27 6'-11 C 24 24 25 26 <br />7 5-1 A 37 A 19 21 22 23 7-1 C 24 24 26 27 6'-r C 24 24 24 26 <br />7.5 4·.9"A 3'-0" A 19 20 22 23 6'-9" C 25 25 25 27 6'-3 C 24 24 24 26 <br />8 4'-5"A 2'-10- A 19 20 22 23 6'-5" C 25 25 25 26 6%0- C 24 24 24 25 <br />8.5 4'-27 A 2'-8- A 19 20 21 23 6'-2 C 25 25 25 26 5'-9- C 24 24 24 25 <br />9 3'-11'A 27 A 19 20 21 23 5·-11· C 25 25 25 26 57 C 25 25 25 25 <br />9.5 3-9-A 2-5- A 19 20 21 22 5'-8- C 25 25 25 26 5-4-C 25 25 25 25 60 <br />10 3-6-A 74" A 19 19 21 22 5-5" C 25 25 25 26 57 C 25 25 25 25 <br />11 37 A 74" A 19 19 21 22 9-0- C 25 25 25 25 4'-10*C 25 25 25 25 <br />90 MPH EXPOSURE B <br />0.042"xy"x8" Box Bean (Detail 1430) <br />TABLE 5.1 Attached Freestanding or <br />Structure Multispan Units <br />TRIB POST POST MAX MAX POST LENGTH <br />WIDTH SPACING REQ'D POST MIN FOOTER 8' |19 | 12 <br />(FT) ON SLAB FOR SPACING POST SIZE CONSTRAINED FOOTER <br />(FT)SlAB (FT)TYPE ·d -d | ." .€ <br />(in) (In) 1 On) 1 (in) <br />90 MPH EXPOSURE 8 <br />3 4'-10" A 4'-1- A 14 20 21 22 <br />3.5 4'-2"A 3'-r A 14 19 21 22 <br />4 3'-7-A 3-2- A 14 19 20 22 <br />4.5 3'-2"A 7-11 A 14 19 20 21 <br />5 2'-11" A 2'-r A 14 18 20 21 <br />5.5 2-r A 2-5" A 14 18 19 21 <br />6 2'-5» A 2'-3" A 14 18 19 20 <br />6.5 27 A 2·-1" A 14 18 19 20 <br />7 2'-1" A 1'-11"A 14 17 19 20 <br />7.5 1'-11"A 1'-10" A 14 17 19 20 <br />8 1'-9" A 1'-8" A 14 17 18 20 <br />8.5 1'-8" A 1'-7- A 14 17 18 20 <br />90 MPH EXPOSUFE C or 105 N PH EXP)SURE 8 <br />3 4-10- A 4-1" A 15 22 23 24 <br />3.5 4'-2"A 37 A 16 21 23 24 <br />4 37 A 3-2" A 16 21 22 23 <br />4.5 3'-2 A 2'41 A 16 20 22 23 <br />Double 0.042"x3"x8" Beam (Detail N25) <br />Attached Freestanding or <br />Structure Multispan Units <br />MAX MAX POST LENGTH <br />POST MIN FOOTER 8' | 10' | 12 <br />SPACING POST SIZE CONSTRAINED FOOTEF <br />(FT)TYPE V Y Y d <br />M (In) (In) I (in) <br />87 C 17 23 24 26 <br />7-9" C 18 22 24 25 <br />74" C 18 22 23 25 <br />6'-6"C 18 22 23 24 <br />6-0' C 18 21 23 24 <br />57 C 19 21 22 24 <br />5%3" C 19 21 22 23 <br />4'dll C 19 20 22 23 <br />4'-7" C 19 20 22 23 <br />4%4" C 19 20 21 23 <br />4'-2" C 19 20 21 22 <br />3%11"C 19 20 21 22 <br />8·-r C 20 25 27 28 <br />7-90 C 20 24 26 27 <br />7·-1"C 20 24 26 27 <br />6'-6" 0 20 24 25 27 <br />Double ).040"x2"£615" Beam (Detail N25 <br />Attached Freestanding or <br />Structure Multispan Units <br />MAX MAX POST LENGTH <br />POST MIN FOOTER 8' |19 | 12 <br />SPACING POST SIZE CONSTRAINED FOOTER <br />(FT)TYPE '1· 'd· -d- | 'd" <br />on) (in)MIM <br />7'-11" C 17 <br />7-T'C 17 <br />6·-7" C 18 <br />6'-1 C 18 <br />5-8- C 18 <br />5'-3" C 18 <br />5'-0" C 18 <br />4'-8" C 19 <br />4'-5" C 19 <br />4'-2" C 19 <br />4'-0" C 19 <br />3'-10" C 19 <br />T-11"C 19 <br />7'-2" C 19 <br />67 0 20 <br />6'-1"C 20 <br />25 3 11'4· , A 74" A 16 22 23 25 13'-0" <br />3.5 9'-8"A 67 A 17 21 23 24 11'-10" <br />4 8'-6 A 5-8- A 17 21 22 24 10'-11" <br />4.5 T€A 5-2- A 17 21 22 23 100-2- <br />5 6-9 A 4'-9- A 17 20 22 23 9'T <br />5.5 6/A 4·-4- A 17 20 21 23 9'4 <br />6 5'-8-A 4'-1" A 17 20 21 22 8'-6- <br />6.5 5'-2-A 3'-9· A 17 19 21 22 8-0- <br />7 4'-10-A 3, A 17 19 21 22 1-8 <br />7.5 4'-6"A 3'-4" A 17 19 20 22 Ta- <br />8 4'-3"A 3-2- A 17 19 20 21 7-0- <br />8.5 4'4 A 3'-0" A 17 19 20 21 6'-8- <br />9 3-9-A 2'-10' A 17 19 20 21 6'-5 <br />9.5 37 A 7-8- A 18 18 20 21 6-2 <br />90 MPH EXPOSURE C or 105 & PH EXPCSURE B <br />25 3 11'4 A 6-2" A 18 23 25 26 11-9 <br />3.5 9 -8-A 5'-6" A 18 23 24 26 10'-9' <br />4 8.-6.-, A 4011' A 18 22 24 25 9'-11- <br />4.5 7-6".i A 4'€ A 18 22 23 25 9-2- <br />5 67 A 4'-1" A 18 22 23 24 87 <br />5.5 5/A 3-9" A 18 21 23 24 84- <br />6 5%8-A 3-6- A 18 21 22 24 7-7- <br />6.5 5'-2 A 3-3- A 18 21 22 24 T.T <br />7 4410-A 3-1- A 19 20 22 23 6-10- <br />7.5 4'-6" A 2'+11- A 19 20 22 23 6-6 <br />8 4-3 A 2-9" A 1920 21 23 6-2 <br />8.5 40"A 2'-7- ·A 19 20 21 23 5-11' <br />9 3-90 A 2'-5" A 19 20 21 22 548" <br />9.5 3-7-A 74" A 19 19 21 22 5-5 <br />10 3'-4-A 2'-3- A 19 19 21 22 5·-r <br />GENERAL INSTRUCnONS FOR THESE TABLES <br />1. CHOOSE FREESTANDING OR ATTACHED STRUCTURE <br />2. CHOOSE PROJECTION, WIDTH AND OVERHANG OF UNIT <br />3. DETERMINE WIND AND LIVE OR SNOW LOAD OF STRUCTURE SITE <br />(PATIO UNITS USE 10 PSF MIN, COMMERCIAL UNITS <br />USE 20PSF MIN) <br />4. CHOOSE A PANEL FROM SECTION 4.0 THAT HAS <br />ADEQUATE CLEARSPAN FOR YOUR NEEDS. <br />5. DETERMINE TRIBUTARY WIDTH FROM TABLE 5.2 OR <br />CALCULATE FROM TRIBUTARY DIAGRAM ONSC02 PAGE 2 OF 2 <br />6. CHOOSE A HEADER FROM TABLE 5.1 THAT HAS ADEQUATE <br />POST SPACING. <br />7. USE THE APPROPRIATE FOOTER SIZE SHOWN IN TABLE 5.1 <br />ICC ESR 1398 (2009 IBC) 10/11/2011 <br />22 23 25 <br />21 23 24 <br />21 22 24 <br />21 22 23 <br />20 22 23 <br />20 22 23 <br />20 21 23 <br />20 21 22 <br />19 21 22 <br />19 21 22 <br />19 20 22 <br />19 20 22 <br />24 25 27 <br />23 25 26 <br />23 24 26 <br />23 24 25 <br />22 24 25 <br />22 23 25 <br />22 23 25 <br />21 23 24 <br />21.23 24 <br />99-OVESS/04/1 <br />8.. 9 <br />E P 6/ <br />C 20 25 27 28 1109' 8 19 24 25 27 5 2'-11" A 27 A 16 20 21 23 6-0" 0 21 23 25 26 548" C 20 <br />C 20 25 26 28 109 8 20 23 25 26 5.5 A 2'-5 A 16 20 21 22 5'-7" 0 21 23 24 26 5'-3" C 20 <br />C 21 24 26 27 9-11- C 20 23 24 26 6 295" A 7-3 A 16 19 21 22 5'-3" D 21 23 24 25 54» C 21 <br />C 21 24 25 27 9-4 C 21 23 24 25 6.5 2-T A 2'-1 A 16 19 21 22 4-11" D 21 22 24 25 4'-8- C 21 <br />C 21 24 25 26 8-9 C 21 22 24 25 7 201"A 1-11- A 16 19 20 22 4-7- D 21 22 24 25 4'-5 C 21 <br />C 22 23 25 26 87 C 21 22 23 25 <br />C 22 23 24 26 7-10- C 21 22 23 24 OVER-TABLE 5.2 TRIBUTARY WIDTHS FOR SINGLE SPAN ATTACHED STRUCTURES <br />C 22 23 24 25 T€ C 22 22 23 24 HANG PROJECTION OF SINGLE SPAN STUCTURES (FT) <br />C 22 22 24 25 T-1"C 22 22 23 24 (FT) 6'7 8 9 10 11'12+ 13' 14' 15' 16'17 18'19' 20'21'22' <br />C 22 22 24 25 6-9" C 22 22 23 24 0'3' 3.5'4' 4.5'5, 5.5 6' 6.5 T 7.5'8' 8.5' 9'9.5' 10' 10.5'11' <br />C 23 23 23 25 6'-6- C 22 22 22 24 1 3.5 4 4.5 5 5.5 6'6.5'T 7.5 8' 8.5' 9 9.5' 10' 10.5 11'11.5' <br />C 23 23 23 24 67 C 22 22 22 23 2 nla Ila nia 5.5 0 6.5, T 7.5' 8'8.5'9' 9.5 10'10.5'11'11.5' 12 <br />C 23 23 23 24 67 C 22 22 22 23 3 Wa nla nia rda nia Wa rda 8'8.5'9' 9.5 10 10.5 11'11.5' 12' 12.5' <br />C 23 23 23 24 5-9- C 23 23 23 23 4'Wa .la nia rda nia nia rda nia Wa rda n/a 10.5'11'11.5'17 12.5' 13'i <br />C 22 27 28 30 10%8· 8 21 25 27 28 TABLE 5.3 Post Requirements TABLE 5.4 Post Requirements for B <br />Footing Height Code Detail# 1 <br />C 22 26 28 29 9-9.C 22 25 26 28 for Attached Single Span Structures Freestanding Structures or Multispan Attached Structures <br />C 23 26 27 29 94- C 22 24 26 27 Post DeSCription Max POST Detail Post Description Maximum Max POST 1- <br />C 23 25 27 28 8'-5-C 22 24 26 29 Hgt Code <br />C 23 25 27 28 7-11- C 23 24 25 27 Twin 0.062™1.5"<1.5- Scroll 9' A AC 0.041"x3"xy Steel Clover d= 20" 9'B N11, Atft <br />C 24 25 26 28 T-5-C 23 24 25 26 0.042"*3"x8" Aluminum Post 11'B 1430 0.041»xyxy Steel Clover d= 21" 8'B Nll, <br />C 24 24, 26 27 7·-0- C 23 23 25 26 0.024"Post with Sideplates 12'B N16.[K 3/16"x3"xy Steel Square d= 28"12'C N17, <br />C 24 24 26 27 6'-8- C 23 23 25 26 Clover 0.030™3-x3- Alum 11'B Nll.AH 3/16"x3"x3" Steel Square d= 28" 8'D N17, <br />C 24 24 25 27 6'-4-C 24 24 24 26 Clover 0.040-x3-xy Alum 12'B Nll,AH 1/4""xyx3" Steel Square d= 28"12'D N17, Ae/ <br />C 24 24 25 27 6·-1· C 24 24 24 25 Colonial 0.062" Extruded 12'C AE 3/16-x4"*4" Steel Square d= 28"12'E N17, AG <br />C 24 24 25 26 5-10- C 24 24 24 25 0.041 "x3"x3" Steel Glover 12'D Nll.AH 1/2"x4-x4" Steel Square d= 37"12'D N17, AG <br />C 25 25 25 26 5·-7" C 24 24 24 25 0.041'x3"x3" Steel Clover 8'E Nll,AH 1/2"x4-x4" Steel Square d= 31" 15' D N17, AG <br />C 25 25 25 26 5·4· C 24 24 24 25 3/16"x30<3" Steel Square 15'H N17, AG C 25 25 25 26 5'-2- C 24 24 24 25 1/4"xh3" Steel Square 15'I N 17, AG <br />C 25 25 25 25 5·-0- C 24 24 24 25 3/16"x£-x4" Steel Square 15'J N17, AG <br />1/2 x4 x44- Steel Square 15'K N17, AG <br />8. FOR SINGLE SPAN ATTACHED UNIT USE THE POST SHOWN IN <br />TABLE 5.1 AND 5.3 UPGRADE THE POST IF THE HEIGHT IS NOT SUFFICIENT Amerimax Building Products <br />FREESTANDING AND MULTISPAN UNITS USE TABLE 5.4 5208 Tennyson Parkway <br />9. FIND THE O/C SPACING OR # OF FASTENERS FOR ATTACHING TO WALL FROM TABLE 7.5 OR TABLE 7.7 Plano, Texas 75024 <br />10. USE THE APPROPRIATE DETAILS (Nl-N35 or A-BM)Carl Putnam, P. E. <br />FOR PATIO St-ABS FOLLOW 1 -6 FROM ABOVE THEN 3441 Ivylink Place <br />SLAB 7. DETERMINE MAXIMUM POST SPACING ON SLAB FROM TABLE 5.1 Lynchburg, VA 24503 <br />SLAB 8. USE THE SMALLER OF THE POST SPACING ON SLAB OR HEADER POST SPACING cariputnam@comcast.net SLAB 9. FOLLOW 9-10 FROM ABOVE <br />SLAB 10. FOR TWO POST STRUCTURES USE TABLE 7.1 ON SHEET M3 FOR SLAB REQUIREMENTS INSTEAD OF THESE TABLES <br />Page 21 of 60 <br />NOV 5 2012 <br />OFESS/ON <br />Q 0#L r < 44 9 f-Co,- <br />20 0 <br />9/?ed <br />¢ ONA U ·S' S <br />·Dires 4/3012 <br />OCT <br />eG\NEER. <br />Epl 1 0 <br />CI <br />r Ivt <br />\1