Laserfiche WebLink
141 <br />AN <br />planning & Mullaing Agency <br />Permits & Plan Check Section <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714)647-5800 <br />www.santa-ana.org <br />COM <br />ORANGE COUNTY FIRE AUTHORITY <br />Plan Submittal Criteria for COMMERCIAL projects, MULTIFAMILY <br />RESIDENTIAL projects and RESIDENTIAL TRACT developments <br />INSTRUCTIONS: Fill in the project/business address and provide a brief description of the scope of work and type of business <br />operation that will take place. Answer questions 1 tbrough 8, read and initial item 9, then complete and sign the certification section. If <br />you answer "YES" to any part of question 1 through 8, submit the type of plan indicated in italics to the OCFA (see www.ocfa. org for <br />submittal information and locations). In some cases, other plan types not indicated herein may also be necessary depending on specific <br />conditions or operations. If you need help completing this form or have questions regarding requirements for review, please contact the <br />OCFA at 714-573-6108 or visit us at 1 Fire Authority Road in Irvine for assistance. <br />Address (street number & name, suite, city): *€'LO 3 6, 69-18*-0 <br />Project Scope/Business Description: Ex-Or 1- 679-€LAI->0-1-7 44.-/ --r--5> 7,7-- 15·M 96'Z--'6h«G·<1 4-•39'L ».a=)-£© Pc_A= l 2110/ 71 / <br />YES NO L L <br />1. [ [ Construction of a new building, a new story, or increase the footprint of an existing building? Changes toT- roadways, curbs, or drive aisles? Addition, relocation, or modification of fire hydrants or fences/gates?Fire <br />Master Plan (PR145) <br />2. [ ['Installation/modification/repair of underground piping, backflow preventers, or fire department connectionsserving private fire hydrant/sprinkler/standpipe systems?Underground Plan.· (PR470, PR475) <br />3. [ 83 Drinking/dining/recreation/religious functions or other gatherings in a room >750 sq.ft. or >49 people?7- Healthcare or outpatient services for >5 people who may be unable to immediately evacuate without <br />assistance? 24-hour care or supervision? Incarceration or restraint? Hotel, apartment, or residential facility with <br />3+ units and 4+ stories, or podium/wrap construction? Congregate housing/dormitories with 4+ stories and 17+ <br />people? High-rise structure (55+ feet to highest occupied floor level)?Architectural Plan (PR200-PR285) <br />4. Installation/modification of locks delaying or preventing occupants from leaving a space or requiring use of a <br />card, button, or similar action to open a door in the direction of exit travel?Architectural, Sprinkler, and/or Alarm <br />Plan depending on the occupancy and type of device installed (PR200-PR280, PR420-PR425, PR500-PR520)5.0Installation/modification/use of spray booths; dust collection; dry cleaning; industrial ovens/drying equipment; <br />industrial/commercial refrigeration systems; compressed gasses; tanks for cryogenic or flammable/combustible <br />liquids; vapor recovery; smoke control; battery back-up/charging systems (>50 gal. electrolyte, >1,000 lb. lithium <br />ion); welding/brazing/soldering, open flame torches, cutting/grinding; or other similar operations?Special <br />Equipment Plan (PR315, PR340-PR382) <br />6· Clfl Storage/use/research with flammable/combustible liquids or other chemicals?Motor vehicle/aircraft <br />maintenance/repair? Cabinetry/woodworking/finishing facility? Chem Class & floor plan (full architectural plan <br />if H occupancy); Special Equipment Plans may be necessary. (PR31 5-PR360, PR232-PR240) <br />Storage or merchandizing areas in excess of 500 sq. ft. where items are located higher than 12' (6' for high- <br />hazard commodities, plastic, rubber, foam, etc.)?High-piled Storage Plan (PR330) <br />8. [) [3rcooking under a Type I commercial hood; installation or modification of a fire extinguishing system located in a>" commercial cooking hood?Hood & Duet Extinguishing System, not just the hood mechanical plan. (PR335) <br />Iriitial that you have read and understand the following statement: <br />9. *Sprinkler/Alarm Requirements: Consult California Building and Fire Codes and local ordinances (see the local <br />ordinance for buildings constructed prior to Jan. 1, 1946) to determine sprinkler or alarm system requirements; if a <br />- system is required, plans shall be submitted to OCFA. Existing buildings undergoing remodel must be evaluated by a <br />licensed contractor to determine if modificat*Lit needed; if so, the licensed contractor shall submit plans for approval <br />prior to making modifications. (Initial here: 1/ 7 ) <br />Building Department: u all ofthe questions have been answered accurately as "NO" and the project does not otherwise require OCFA <br />review of sprinkler or alarm plans*, then you may accept this signed form as a written release that OCFA review is not required. <br />Should you still require that the applicant have plans approved by the OCFA please initial here or attach an OCFA referral <br />form and have the applicant submit the form along with the appropriate plans an <br />I certify under penalty of perjury under the laws of the State of Califo <br />Print name:H.,2-+4=.45 »-4872-0 '- 142' signature: <br />Phone Number:( --1.lk) 2.!il -1 4 Date: <br />2-28-2013 ese