Laserfiche WebLink
Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box'1988 (M.'19) <br />Santa Ana, C492702 <br />(714) 647.s800 <br />www. santa-an a. org <br />RESIDENTI.AL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-or cBC 201 3 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minlmum 11' x 17" size. lf answerino NO to anv of the ouestions .D lan check shall be re q u ired. <br />Proj ectAddress: 4 LOZW €Ef 1l+[RoN tsoxb <br />Contractor Company Name: <br />Contractor License Number: <br />L <br />992 t7a <br />( <br />K <br />K, <br />d. <br />R <br />( <br />x <br />{x <br />NO Are the following applicable to the proposed pro.iect? <br />U/ill the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />\ /ill the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />U/ill the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />$/ill the PV system be installed with a space of 2" minimum to 10" maximum betlveen <br />the underside of modules and the surface of the roof? <br />Uiill the PV system be installed without using any ballast system or counter-weight <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minjmum 5/16" lag screws be installed with a minimum ot 2-112 ioch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />tr <br />2 tr <br />3 tr <br />4 <br />5 <br />D <br />E <br />6 tr <br />7 <br />tr <br />I tr <br />10 (n <br />I certify under penalty of perjury under the laws of the <br />Print Name:V/l{ LeN?-}. F FRG,tOp s <br />State of California that the above is true: <br />ignatu re <br />Phone Number <br />Email Add ress: <br />(zt4 33or6*2 oate: lQ lul tg <br />Rev 11/lg/2015 <br />RNtT e (),{D oLh <br />tu0turutur <br />,.Nfi,iffi <br />'l