Laserfiche WebLink
professional TileTrac®SOLAR <br />products Installation Manual <br />Date Modified: 09/12/07 <br />Step 3a: Attaching/ Sealing TileTrac® (Concrete Curve Tile Roof) <br />Mark (with lumber crayon) or account for ALL holes, including small nail holes to ensure roof is <br />properly sealed. Approximate attaching/sealing time: 5 min. per attachment. <br />0 <br />x; STEP 1 h STEP 2 N STEP 3 <br />47 X <br />STEP 1: Select a tile in the area of <br />the roof after referenced by your <br />chalk lines. <br />STEP 2: Remove the tile by push- <br />ingand pullingthe tile, usually held <br />in place by a small nail. <br />STEP 3: using an electronic stdd <br />finder locate the rafter center. <br />Mark a reference point on the tile <br />above. <br />7£3£ Alternate methods of finding rafter center (STEP 3): <br />-< 1) Using a dead-blow hammer, lightly tap perpendicular to the after until a solid sound is heard. Mark this location.2) If attic is accessible, driving a nail upward beside the after may provide an adequate reference point. <br />r. - 2*1 ./0 <br />/X <br />Roofing mastic/sealant <br />must be applied per <br />manufacturer's specifica- <br />tions. Mastic/sealant <br />should be fresh and <br />applied at room tempera- <br />ture, as necessary. <br />= ™ STEP 4 1> STEP 5 <br />STEP 4: Drill several holes (if nec-STEP 5: Insert the lag bolt and <br />essa ry) to locate the exact after washer through the TileTrac® and <br />center. A 3/16" pilot hole drill bit is apply fresh sealant to the base. <br />recommended. <br />Page 4 of 8 <br />4%