My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1006 S Austin St - Plan
PBA
>
Building
>
ProjectDox
>
A
>
Austin St
>
1006 S Austin St
>
1006 S Austin St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 8:01:24 AM
Creation date
5/30/2025 8:00:26 AM
Metadata
Fields
Template:
Plan
Permit Number
20176806
20178023
101111238
Full Address
1006 S Austin St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FLASHLOC is the ultimate attachment for composition shingle and rolled comp roofs. The all-in-one mount installs <br />fast — no kneeling on hot roofs to install flashing, no prying or cutting shingles, no pulling nails. Simply drive the <br />lag bolt and inject sealant into the base. FLASHLOC’s patented TRIPLE SEAL technology preserves the roof and <br />protects the penetration with a permanent pressure seal. Kitted with lag bolts, sealant, and hardware for maximum <br />convenience. Don’t just divert water, LOC it out! <br />PROTECT THE ROOF <br />Install a high-strength waterproof attachment <br />without lifting, prying or damaging shingles. <br />FLASH LOC <br />LOC OUT WATER <br />With an outer shield 1 contour-conforming gasket 2 <br />and pressurized sealant chamber 3 the Triple-Loc Seal <br />delivers a 100% waterproof connection. <br />Cut Away View <br />HIGH-SPEED INSTALL <br />Simply drive lag bolt and inject sealant into the port 4 <br />to create a permanent pressure seal. <br />Cut Away View <br />FASTER INSTALLATION. 25-YEAR WARRANTY. <br />FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 <br />3 <br />2 <br />4 <br />1 <br />FASTER INSTALLATION. 25-YEAR WARRANTY. <br />FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 <br />1.75” <br />STEP 1: SECURE <br />Place FLASHLOC over pilot hole with lag on down-slope side. Align indicator marks on sides of <br />mount with chalk line. Pass included lag bolt and sealing washer through FLASHLOC into pilot <br />hole. Drive lag bolt until mount is held firmly in place. <br />NOTE: The EPDM in the sealing washer will expand beyond the edge of the metal washer when <br />proper torque is applied. <br />PRE-INSTALL <br />Snap chalk lines for attachment rows. On shingle roofs, snap lines 1-3/4” below upslope edge <br />of shingle course. Locate rafters and mark attachment locations. <br />At each location, drill a 7/32” pilot hole. Clean roof surface of dirt, debris, snow, and ice, <br />then fill pilot hole with sealant. <br />NOTE: Space mounts per racking system install specifications. When down pressure is ≥34 psf, <br />span may not exceed 2 ft. <br />STEP 2: SEAL <br />Insert tip of UNIRAC provided sealant into port. Inject until sealant exits both vents. <br />Continue array installation, attaching rails to mounts with provided T-bolts. <br />NOTE: When FLASHLOC is installed over gap between shingle or tabs or vertical joints, <br />fill gap/joint with sealant between mount and upslope edge of shingle course. <br />Use only provided sealant. <br />FLASH LOC <br />INSTALLATION GUIDE <br />1006 S Austin St <br />11/29/22
The URL can be used to link to this page
Your browser does not support the video tag.