Laserfiche WebLink
McPherson Engineering By: M.M. <br />Date: 8/4/22 <br />Gravity Loads: <br />DEMAND DECREASED BY 9.75% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 4.09% < 10% = OK! <br />Anchorage: <br />DEMAND OF 354.1LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />8/4/2022 3:53 PM <br />7 of 7 <br />©McPherson Engineering <br />1018 N Mirasol St <br />08/29/22