My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
121 E Anahurst Pl - Plan
PBA
>
Building
>
ProjectDox
>
A
>
Anahurst Pl
>
121 E Anahurst Pl
>
121 E Anahurst Pl - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 8:01:20 AM
Creation date
5/30/2025 8:00:30 AM
Metadata
Fields
Template:
Plan
Permit Number
20177943
101112740
Full Address
121 E Anahurst Pl
Document Relationships
101112740 - Permit
(Permit - Plan)
Path:
\Building\Permits\A\Anahurst Pl\121 E Anahurst Pl
20177943 - Permit
(Permit - Plan)
Path:
\Building\Permits\A\Anahurst Pl\121 E Anahurst Pl
Text box
ID:
1
Creator:
Import Agent
Created:
5/30/2025 8:00 AM
Modified:
5/30/2025 7:57 AM
Text:
http://www.vectorse.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VSE Project Number: U4879.0062.221 <br />Hector Gonzalez Residence <br />10/18/2022 <br />The solar array will be flush-mounted (no more than 10" above the roof surface) and parallel to the roof surface. Thus, we <br />conclude that any additional wind loading on the structure related to the addition of the proposed solar array is negligible. <br />The attached calculations verify the capacity of the connections of the solar array to the existing roof against wind (uplift), <br />the governing load case. Regarding seismic loads, we conclude that any additional forces will be small. Conservatively <br />neglecting the weight of existing wall materials, the installation of the solar panels represents an increase in the total weight <br />(and resulting seismic load) of 2.1%. Increases in lateral forces less than 10% are considered acceptable. Thus the existing <br />lateral force resisting system is permitted to remain unaltered. <br />Limitations <br />Installation of the solar panels must be performed in accordance with manufacturer recommendations. All work performed <br />must be in accordance with accepted industry-wide methods and applicable safety standards. The contractor must notify <br />Vector Structural Engineering, LLC should any damage, deterioration or discrepancies between the as-built condition of the <br />structure and the condition described in this letter be found. The use of solar panel support span tables provided by others is <br />allowed only where the building type, site conditions, site-specific design parameters, and solar panel configuration match <br />the description of the span tables. The design of the solar panels, solar racking (mounts, rails, etc.) and electrical engineering <br />is the responsibility of others. Waterproofing around the roof penetrations is the responsibility of others. Vector Structural <br />Engineering assumes no responsibility for improper installation of the solar array. Vector Structural Engineering shall be <br />notified of any changes from the approved layout prior to installation. <br />VECTOR STRUCTURAL ENGINEERING, LLC <br />10/18/2022 <br />_______________________________________________________ <br />Russell Emery, P.E. <br />CA License: C73566 - Expires: 12/31/2022 <br />Project Engineer <br />Enclosures <br />RNE/bep <br />10/18/2022 <br />651 W. Galena Park Blvd., Ste. 101 / Draper, UT 84020 / T (801) 990-1775 / F (801) 990-1776 / www.vectorse.com <br />121 E Anahurst Pl <br />11/15/22
The URL can be used to link to this page
Your browser does not support the video tag.