Laserfiche WebLink
McPherson Engineering By: M.M. <br />Date: 6/29/22 <br />Gravity Loads: <br />DEMAND DECREASED BY 13.49% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 2.1% < 10% = OK! <br />Anchorage: <br />DEMAND OF 390.6LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />6/29/2022 2:42 PM <br />7 of 7 <br />©McPherson Engineering <br />1208 S Ross St <br />07/20/22