My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
123 E. Anahurst Pl - Plan
PBA
>
Building
>
ProjectDox
>
A
>
Anahurst Pl
>
123 E Anahurst Pl
>
123 E. Anahurst Pl - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 8:01:22 AM
Creation date
5/30/2025 8:00:41 AM
Metadata
Fields
Template:
Plan
Permit Number
20177888
101112676
Full Address
123 E Anahurst Pl
Document Relationships
101112676 - Permit
(Permit - Plan)
Path:
\Building\Permits\A\Anahurst Pl\123 E Anahurst Pl
20177888 - Permit
(Permit - Plan)
Path:
\Building\Permits\A\Anahurst Pl\123 E Anahurst Pl
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1081695 <br />CONTRACTOR LICENSE <br />NUMBER <br />AERIAL VIEW GENERAL NOTES <br />PROJECT NOTES: <br />THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE LOCAL <br />ELECTRIC CODE ( ) ARTICLE 690, ALL MANUFACTURERS <br />LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT <br />CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTIONS <br />(AHJ) APPLICABLE CODES. <br />THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED <br />AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION. <br />GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS <br />INTEGRATED WITH THE MICRO INVERTER IN ACCORDANCE WITH <br />690.41(B). <br />ALL PV SYSTEM COMPONENTS, MODULES, UTILITY-INTERACTIVE <br />INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE <br />IDENTIFIED AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS <br />REQUIRED BY 690.4: <br />PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS <br />C FIRE. <br />INVERTERS UL1741 CERTIFIED, IEEE 1547, 929, 519. <br />COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY. <br />MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED <br />TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE <br />CALCULATED ACCORDING TO 690.7. <br />ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, <br />AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A <br />PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED <br />FOR THE APPLICATION PER 690.4 ((D). SHALL BE INSTALLED <br />ACCORDING TO ANY INSTRUCTIONS FROM LISTING OR LABELING <br />110.3. <br />ALL SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE AND <br />AHJ. <br />WORK INCLUDED: <br />PV ROOF ATTACHMENTS <br />PV RACKING SYSTEM INSTALL ATION - EVEREST CROSSRAIL 44-X <br />PV MODULE AND INVERTER INSTALLATION <br />PV EQUIPMENT GROUNDING. <br />PV SYSTEM WIREING TO A ROOF-MOUNTED JUNCTION BOX. <br />PV LOAD CENTERS (IF INCLUDED). <br />PV METERING/MONITORING (IF INCLUDED). <br />PV DISCONNECTS. <br />PV FINAL COMMISSIONING. <br />(E) ELECTRICAL EQUIPMENT RETROFIT FOR PV <br />SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE. <br />PLANSET-1 <br />SITE INFORMATION <br />drawn by: <br />sheet name: <br />REVISION: <br />sheet number: <br />VICTOR LARA <br />123 EAST ANAHURST PLACE <br />SANTA ANA <br />CALIFORNIA <br />92707 <br />9/14/2022 <br />MJ <br />3 <br />COVER SHEET PS-1 <br />TABLE OF CONTENTS: <br />PS-1 - COVER SHEET <br />PS-2 - SITE NOTES <br />PS-3 - SITE PLAN <br />PS-4 -FIRE ACCESS <br />PS-5 - MODULE AREA <br />PS-6 - RACKING DETAIL <br />PS-7 - ELECTRICAL LINE <br />PS-8 - PLACARDS <br />FM-1 FIELD MARKINGS <br />RS-1 - RS-6 - RESOURCE <br />DOCUMENT <br />SCOPE OF WORK: INSTALLATION OF UTILITY INTERACTIVE PHOTOVOLTAIC SYSTEM <br />4.44kW AC PHOTOVOLTAIC SOLAR ARRAY <br />PV MODULES: SILFAB - 370 NX <br />INVERTER(S): SE3800-US <br />ROOF TYPE: Composition Shingle <br />PV MOUNTING HARDWARE: QUICK BOLT (QB2) 17662 (COMP SHINGLE) <br />AHJ:SANTA ANA <br />BUILDING CODE:2019 CBC <br />ELECTRICAL CODE:2019 CEC <br />FIRE CODE:2019 CBC <br />RESIDENTIAL <br />CODE:2019 CRC <br />CONFIDENTIAL - THE INFORMATION <br />HEREIN CONTAINED SHALL NOT BE <br />USED FOR THE BENEFIT OF ANYONE <br />EXCEPT SOLID STATE ELECTRIC LLC, <br />NOR SHALL IT BE DISCLOSED IN <br />WHOLE OR IN PART TO OTHERS <br />OUTSIDE RECIPIENT <br />ORGANIZATIONS, EXCEPT IN <br />CONNECTION WITH THE SALE AND <br />USE OF THE RESPECTIVE <br />EQUIPMENT, WITHOUT THE WRITTEN <br />PERMISSION OF SOLID STATE <br />ELECTRIC LLC. <br />SOLID STATE ELECTRIC <br />LLC <br />7787 EASTGATE RD #100 <br />HENDERSON, NV 89011 <br />USA <br />CEC <br />CEC <br />CEC <br />CEC <br />CEC <br />CEC <br />MODULE QUANTITY: 12 <br />09/19/2022 <br />VSE Project Number: U4879.0061.221 <br />Vector Structural Engineering has reviewed the existing <br />structure with loading from the solar array and screw <br />connections to the existing framing. The design of the <br />racking system, racking connections, and all other <br />structural is by others. Mechanical, architectural, and all <br />other nonstructural aspects of the design are by others. <br />Electrical is by others, unless stamped by Dean Levorsen. <br />BLDG # 101112676 <br />ISSUED: 11/08/2022 <br />ELECT # 20177888 <br />ISSUED: 11/10/2022 <br />123 E. Anahurst Pl <br />11/10/22
The URL can be used to link to this page
Your browser does not support the video tag.