Laserfiche WebLink
SINGLE FAMILY RESIDENCE <br />OCCUPANCY: R-3, U <br />CONSTRUCTION TYPE: VB <br />WIND SPEED: 130 MPH <br />EXPOSURE CATEGORY: C <br />MIN STANDOFF HEIGHT OF: 6" <br />CONDUIT:3/4" <br />FIRE SPRINKLER: NO <br />LAT & LONG. : 33.7314, -117.8843 <br />SNOW LOAD: N/A <br />SYSTEM FIRE RATING CLASS A WHEN <br />TYPE I OR II PV MODULE USED PER <br />R902.3 OR R904.4 <br />ROOF AREA: 1400 SQ.FT. <br />PV ARRAY AREA: 353 SQ.FT. <br />1 STORY ROOF: <br />1 LAYER COMPOSITION SHINGLE <br />DESIGN CRITERIASITE INFORMATION <br />SCOPE OF WORK <br />(18) LONGI SOLAR <br />LR4-60HPB-350M PV MODULES <br />(18) ENPHASE IQ7-60-2-US <br />(240V) [S|1] MICROINVERTERS <br />(1) AC COMBINER/SUB PANEL <br />(E) 125A MAIN SERVICE PANEL <br />MSP <br />JB <br />IQC ACD <br />SUB 71 <br />0 <br />0 <br /> <br />W <br /> <br />F <br />l <br />o <br />r <br />i <br />d <br />a <br /> <br />A <br />v <br />e <br />n <br />u <br />e <br />He <br />m <br />e <br />t <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />5 <br />4 <br />5 <br />CU <br />R <br />R <br />E <br />N <br />T <br /> <br />H <br />O <br />M <br />E <br />CS <br />L <br />B <br />- <br />C <br />4 <br />6 <br />, <br /> <br />C <br />- <br />1 <br />0 <br />, <br /> <br />B <br /> <br /># <br /> <br />1 <br />0 <br />4 <br />5 <br />0 <br />1 <br />6 <br />MC <br />P <br />H <br />E <br />R <br />S <br />O <br />N <br /> <br />E <br />N <br />G <br />I <br />N <br />E <br />E <br />R <br />I <br />N <br />G <br />Ju <br />r <br />u <br />p <br />a <br /> <br />V <br />a <br />l <br />l <br />e <br />y <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />5 <br />0 <br />9 <br />(9 <br />0 <br />9 <br />) <br /> <br />5 <br />6 <br />6 <br />- <br />0 <br />0 <br />6 <br />6 <br />so <br />l <br />a <br />r <br />@ <br />m <br />c <br />p <br />e <br />. <br />g <br />r <br />o <br />u <br />p <br />De <br />s <br />i <br />g <br />n <br />e <br />d <br /> <br />b <br />y <br />92 <br />4 <br />0 <br /> <br />L <br />i <br />m <br />o <br />n <br />i <br />t <br />e <br /> <br />A <br />v <br />e <br />CH <br />R <br />I <br />S <br /> <br />R <br />O <br />M <br />A <br />N <br />DA <br />T <br />E <br />: <br /> <br />09 <br />/ <br />3 <br />0 <br />/ <br />2 <br />0 <br />2 <br />2 <br /> <br /> <br /> <br /> <br /> <br />PL <br />O <br />T <br />T <br />E <br />D <br />: <br /> <br />9/ <br />3 <br />0 <br />/ <br />2 <br />0 <br />2 <br />2 <br />DE <br />S <br />I <br />G <br />N <br />E <br />R <br />: <br /> <br /> X <br />. <br />X <br />. <br /> <br /> A <br />H <br />J <br />: <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />6. <br />3 <br />0 <br />0 <br /> k <br />W <br />p <br />D <br />C <br /> <br />/ <br /> <br />5. <br />7 <br />0 <br />6 <br /> k <br />W <br />p <br />A <br />C <br />PH <br />O <br />T <br />O <br />V <br />O <br />L <br />T <br />A <br />I <br />C <br /> <br />S <br />Y <br />S <br />T <br />E <br />M <br /> <br />P <br />L <br />A <br />N <br />MA <br />R <br />I <br />A <br /> <br />S <br />A <br />N <br />C <br />H <br />E <br />Z <br />12 <br />3 <br />4 <br /> <br />M <br />A <br />G <br />N <br />O <br />L <br />I <br />A <br /> <br />A <br />V <br />E <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />(7 <br />1 <br />4 <br />) <br /> <br />3 <br />4 <br />5 <br />- <br />0 <br />6 <br />8 <br />9 <br />AP <br />N <br />: <br /> <br />1 <br />3 <br />0 <br />2 <br />1 <br />1 <br />8 <br />SOLAR PHOTOVOLTAIC SYSTEM NOTES <br />1. ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK <br />SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES: <br />2019 CA BUILDING CODE, PART 2 <br />2019 CA RESIDENTIAL CODE PART, 2.5 <br />2019 CA MECHANICAL CODE, PART 4 <br />2019 CA ELECTRICAL CODE, PART 3 <br />2019 CA PLUMBING CODE, PART 5 <br />2019 CA EXISTING BUILDING CODE, PART 10 <br />2019 CA GREEN BUILDING STANDARDS CODE, PART 11 <br />2019 CA REFERENCE STANDARDS CODE, PART 12 <br />2019 CA FIRE CODE <br />2. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST <br />OUTLETS, VENTILATION'S INTAKE AIR OPENINGS SHALL NOT <br />BE COVERED BY THE SOLAR PHOTOVOLTAIC SYSTEM. <br />3. ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A <br />RECOGNIZED ELECTRICAL TESTING LABORATORY AND <br />INSTALLED PER THE LISTING REQUIREMENTS AND THE <br />MANUFACTURER'S INSTRUCTIONS. [NEC 690.4(D)] <br />4. ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, <br />INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND <br />SWITCHES. <br />5. PAINT PV CONDUIT TO MATCH THE DWELLING EXTERIOR. <br />6. CONTACT THE SERVICING UTILITY BEFORE POWERING ON <br />THE PHOTOVOLTAIC SYSTEM <br />INDEX OF SHEETS RM <br />PV1 TITLE SHEET - SITE PLAN & NOTES <br />PV2 ROOF PLAN <br />PV3 STRUCTURAL DETAILS <br />PV4 SINGLE LINE DIAGRAM (S.L.D.) <br />PV5 SIGNAGE <br />PV6 INSTALLER OPTIMIZER/ <br />MICROINVERTER MAP <br />VICINITY MAP <br />NOT TO SCALE <br />TITLE SHEET- <br />SITE PLAN & <br />NOTES <br />PV1SCALE: 1"=15' <br />12 <br />3 <br />4 <br /> <br />M <br />A <br />G <br />N <br />O <br />L <br />I <br />A <br /> <br />A <br />V <br />E <br />(E) CONC. DWY. <br />PR <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />L <br />I <br />N <br />E <br />PROPERTY LINE <br />(E) SHED <br />(N) 30A AC DISCONNECT VISIBLE <br />BLADE, LOCKABLE TYPE <br />(N) ROOF MOUNTED <br />PV SOLAR MODULES <br />(E) MAIN METER <br />(N) IQ COMBINER <br />(N) EMT RAN 1" ABOVE ROOF <br />SURFACE, UNDER EAVE <br />WHENEVER POSSIBLE AND ALONG <br />THE ROOF ONLY WHEN NEEDED <br />(E) FENCE <br />(E) FENCE <br />(E) SUB PANEL <br />(E) MAIN RESIDENCE <br />This item has been digitally signed <br />and sealed on Oct 18, 2022 <br />STRUCTURAL ONLY <br />BLDG #101112849 ISS. 11/23/22 <br />ELEC #20178017 ISS. 11/23/22 <br />The scope of the plans is for the installation of the solar <br />photovoltaic system only and the approval is subject to <br />compliance with all applicable city and state codes and <br />regulations regarding construction. The approval of the <br />plans does not constitute any certification of the accuracy, <br />completeness, or building permit status of the existing <br />buildings and structures as shown. <br />1234 S Magnolia <br />Ave11/23/22