Laserfiche WebLink
6' 6'6' <br />N <br />SCALE: 3/16" = 1'-0" <br />PV SYSTEM MOUNTING DETAILS <br />EXISTING COMP SHINGLE ROOF <br />EVEREST SPLICE FOOT XL FOR <br />COMP SHINGLE @ 72" O.C. MAX <br />PROPOSED EVEREST <br />CROSSRAIL RACKING <br />PROPOSED SOLAREVER SE-166*83-455M-144 <br />(455W) PV SOLAR MODULES <br />EXISTING 2 "X 4" ROOF <br />TRUSSES @ 24"O.C. <br />SHEET <br />CONTRACTOR <br />SOLGEN CONSTRUCTION LLC. <br />1508 E WASHINGTON AVE, <br /> SANTA ANA, <br />CA 92701 <br /> APN:40027206 <br /> DATE:8/22/2022 <br />GUILLEN <br />RESIDENCE <br />License#: C-10 1053344 <br />ADDRESS: 2072 N MAIN ST, <br />FL2, LOGAN <br />UT 84341-1993 <br /> CSLB#: 1053344 <br />DESIGNER: ODJ <br />CORE ENERGY GROUP. <br />PV-2 <br />(E) SERVICE DROP <br />Roof Azimuth: 180° <br />Roof Tilt: 20° <br />Roof Section 1 <br />8/22/2022 <br />1508 E Washington <br />Ave - 2017830312/30/22