My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1911 1%2 N. Spurgeon Street - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Spurgeon St
>
1911 1/2 N Spurgeon St
>
1911 1%2 N. Spurgeon Street - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 1:39:14 PM
Creation date
5/30/2025 8:00:50 AM
Metadata
Fields
Template:
Plan
Permit Number
20175011
101108960
Full Address
1911 1/2 N Spurgeon St
Document Relationships
101108960 - Permit
(Permit - Plan)
Path:
\Building\Permits\S\Spurgeon St\1911 1/2 N Spurgeon St
20175011 - Permit
(Permit - Plan)
Path:
\Building\Permits\S\Spurgeon St\1911 1/2 N Spurgeon St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PV ARRAY LAYOUT PLAN1 <br />SCALE: 1/8" = 1'-0" <br />MOUNTING NOTES: <br />1.PANELS MOUNTED IN ALUMINUM RACKING <br />2.PV ARRAY MOUNTS TO ROOF STRUCTURE 5 16"x3.5" STAINLESS LAG BOLT EMBEDDED 2- 1 2" <br />INTO RAFTERS <br />3.PV PANELS ARE ANCHORED NOT MORE THAN 72" <br />4.WEIGHT OF PV MODULES AND ASSEMBLY LEE THAN 4 LBS PER SQUARE FOOT (SEE <br />ATTACHED SPEC SHEET) <br />5.ALL INSTALLATIONS MUST COMPLY WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. <br />PARCEL #003-153-03 <br />SINGLE FAMILY <br />RESIDENTIAL <br />SOLAR MODULES MUST BE GROUNDED AND BONDED <br />ACCORDING TO THEIR APPROVED LISTING AND INSTALLATION <br />INSTRUCTIONS. ALTERNATIVE METHODS WILL NOT BE APPROVED. <br />INTERACTIVE GRID TIGHT SYSTEM: <br />ALL PV MODULES, EQUIPMENT AND WIRING MATERIAL SHALL BE PROTECTED FROM ANY <br />PHYSICAL DAMAGE. <br />ARRAY CONDUIT & WIRING ARRANGEMENT: <br />1.FREE-AIR / 3 4" CONDUIT SLEEVE ** (2) #10 AWG; R, W <br />2.TO DC DISCONNECT 3 4" CONDUIT (3) #10 AWG; (1) R, (1) W (1) #6 GND ** SLEEVE <br />PROVIDES PROTECTION FROM PHYSICAL DAMAGE PER NEC 300.13 & 300.15 <br />PHOTOVOLTAIC PANEL SHALL BE INSTALLED <br />WITH A MINIMUM 3" CLEARANCE FROM THE <br />ROOF SURFACE TO PANEL <br />SINGLE FAMILY DWELLING ONE STORY <br />SHINGLES ROOF WITH 18° SLOPE <br />DO NOT COVER (MECHANICAL AND <br />PLUMBING VENTS THROUGH THE ROOF <br />WITH THE COLLECTOR.) <br />ROOF MOUNTED <br />SOLAR SYSTEM <br />ALL CONDUIT SHALL BE <br />EXTERNALLY MOUNTED <br />FIRE SPRINKLERS: YES <br />CO <br />N <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br />: <br /> <br />G <br />R <br />E <br />E <br />N <br /> <br />H <br />I <br />L <br />L <br />71 <br />0 <br />8 <br /> <br />D <br />E <br /> <br />S <br />O <br />T <br />O <br /> <br />A <br />V <br />E <br />. <br /> <br />U <br />N <br />I <br />T <br /> <br /># <br />1 <br />0 <br />1 <br />C <br />CA <br />N <br />O <br />G <br />A <br /> <br />P <br />A <br />R <br />K <br />, <br /> <br />C <br />A <br /> <br />9 <br />1 <br />3 <br />0 <br />3 <br />PH <br />: <br />( <br />3 <br />1 <br />0 <br />) <br />6 <br />6 <br />7 <br />- <br />1 <br />1 <br />5 <br />4 <br />CA <br /> <br />L <br />I <br />C <br />E <br />N <br />S <br />E <br />: <br /> <br />9 <br />3 <br />8 <br />6 <br />8 <br />2 <br /> <br />( <br />C <br />L <br />A <br />S <br />S <br /> <br />B <br />, <br /> <br />C <br />- <br />4 <br />6 <br />) <br />DR <br />A <br />W <br />N <br /> <br />B <br />Y <br />: <br /> <br />S <br />S <br />ALL ELECTRICAL WORK SHALL BE DESIGNED PER 2019 LOS ANGELES COUNTY ELECTRICAL <br />CODE, 2019 CALIFORNIA ELECTRICAL CODE, AND 2017 NATIONAL ELECTRICAL CODE. <br />ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A CITY OF LOS ANGELES RECOGNIZED <br />ELECTRICAL TESTING LABORATORY OR APPROVED BY THE DEPARTMENT.LA CITY ELECTRICAL <br />CODE 93.0402 <br />CONTRACTOR <br />LICENSE <br />SIGNATURE: <br />RA <br />F <br />A <br />E <br />L <br /> <br />F <br />A <br />R <br />I <br />A <br />S <br />1 <br />9 <br />1 <br />1 <br /> <br />1 <br />2 N <br />. <br /> <br />S <br />P <br />U <br />R <br />G <br />E <br />O <br />N <br /> <br />S <br />T <br />. <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />6 <br />PH <br />: <br /> <br />( <br />7 <br />1 <br />4 <br />) <br /> <br />5 <br />8 <br />5 <br />- <br />2 <br />8 <br />0 <br />5 <br />SHEET <br />NUMBER: <br />SHEET <br />NAME: <br />1 <br /> <br />O <br />F <br /> <br />8 <br />PV <br /> <br />L <br />A <br />Y <br />O <br />U <br />T <br />DATE: <br />1 <br />2 <br />. <br />0 <br />3 <br />. <br />2 <br />1 <br />3 4" EMT (2)#10 <br />(1)#8 FROM J-BOX <br />TO DC DISCONNECT <br />"EXTERNALLY <br />MOUNTED" <br />1 STRING OF 6 <br />3 4" EMT WEATHERTIGHT <br />CONDUIT THWN-2 (3)#8 <br />(1)#8 FROM INVERTER TO <br />DC DISCONNECT TO MAIN <br />PANEL <br />3 1 2" X 516" LUG BOLT <br />EMBEDED 2" 1 <br />2" INTO <br />RAFTER <br />PV PANELS ARE <br />ANCHORED NOT MORE <br />THAN 72" <br />1 <br />9 <br />1 <br />1 <br /> <br />1 <br />2 N <br />. <br /> <br />S <br />P <br />U <br />R <br />G <br />E <br />O <br />N <br /> <br />S <br />T <br />. <br />A MINIMUM OF 3' IS REQUIRED BETWEEN THE EDGE OF THE <br />SYSTEM, THE SIDE EDGE OF THE ROOF AND ROOF PEAK. <br />6 QCELL 340WATT SOLAR PANELS (2,04)KW <br />ANNUAL PRODUCTION SYSTEM 2,899kWh <br />6 ENPHASE IQ7-60-2-US MICRO INVERTER <br />TO BE INSTALLED IN 1 STRING OF 6 <br />6 QCELL 340W MODULES <br />6 ENPHASE IQ7-60-2-US MICRO <br />INVERTER RANCH CIRCUIT = 20A <br />2 GANG <br />METER <br />A C <br />LOAD CENTER 125AMP <br />NON MAIN AT ADU <br />AZIMUTH <br />270° <br />N <br />E <br />S <br />W <br />MAIN HOUSE <br />D <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />ADU <br />1911 1 2 <br />A <br />C <br />D <br />EXISTING 100AMP SUB <br />PANEL WITH 100AMP <br />BREAKER <br />3' <br />3'-6" <br />30A AC DISCONNECT <br />NEMA R3 <br /> B <br />B <br />1911 1%2 N. <br />Spurgeon Street01/05/22
The URL can be used to link to this page
Your browser does not support the video tag.