Laserfiche WebLink
- + - + -+ - + <br />STRING 3 <br /> MODULES - + <br />-+-+-+-+ <br />STRING 2 <br /> MODULES <br />==== <br />ENVOY COMBINER BOX <br />A 2P <br />PV BACKFEED <br />(N) <br />A 2P <br />PV BACKFEED <br />(N) <br />~ <br />= <br />~ <br />= <br />~ <br />= <br />~ <br />== == <br />~ <br />= <br />~ <br />= <br />~ <br />= <br />~ <br />= <br />~ <br />WEATHERPROOF J-BOX/ <br />WIRE TRANSITION POINT <br />NEMA 4X <br />[A] <br />[A] <br />[B] 3/4" EMT Conduit <br />(6) #10 AWG THWN-2 Wire <br />(1) #8 AWG THWN-2 EGC/GEC <br />-+-+-+-+ <br />STRING 1 <br /> MODULES <br />==== <br />~ <br />= <br />~ <br />= <br />~ <br />= <br />~ <br />A 2P <br />PV BACKFEED <br />(N) <br />[A] <br />8 <br />09 <br />20 <br />15 <br />(E) GEC <br />240V From Utility <br />GEC IN AC EQUIPMENT <br />GROUNDING BUS, IRREVERSIBLY <br />SPLICED TO EXISTING GEC OR <br />BONDED DIRECTLY TO EXISTING <br />GROUNDING ELECTRODE <br />CONFIRM ON SITE UFER GROUNDING <br />OR) SHOULD BE TWO SEPARATE <br />GROUND RODS MIN 6'-00" IN BETWEEN <br />(N)50A/2P PV BREAKER <br />- +-+ - + -+ <br />STRING 2 <br /> MODULES <br />== == <br />ENVOY COMBINER BOX <br />A 2P <br />PV BACKFEED <br />(N) <br />A 2P <br />PV BACKFEED <br />(N) <br />~ <br />= <br />~ <br />= <br />~ <br />= <br />~ <br />Wires in free air <br />Q-CABLE <br />(2) #12 AWG THWN-2 Wire & <br />(1) #6 BARE COPPER GEC <br />[A] <br />[B] 3/4" EMT Conduit <br />(4) #10 AWG THWN-2 Wire <br />(1) #8 AWG THWN-2 EGC/GEC <br />- +-+ - + -+ <br />STRING 1 <br /> MODULES <br />== == <br />~ <br />= <br />~ <br />= <br />~ <br />= <br />~ <br />A <br />MONITORING <br />(N) <br />[A] <br />Rooftop Array <br />ENPHASE IQ7PLUS-72-2-US <br />PANASONIC EVP380 <br />(C) <br />MIN. 3/4" EMT <br />(3) THWN-2 #8 OR EQ <br />(1) GEC/EGC THWN-2 #8 <br />60A NON-FUSED <br /> AC DISCONNECT <br />15A <br />10 <br />20 <br />15 <br />Rooftop Array <br />ENPHASE IQ7PLUS-72-2-US <br />PANASONIC EVP380 <br />(E) LOADS <br />(E) LOADS <br />(E) LOADS <br />Rooftop Array <br />ENPHASE IQ7PLUS-72-2-US <br />PANASONIC EVP380 (N) <br />(E)200A MAIN SERVICE PANEL <br />(E)200A MAIN BREAKER <br />(N)50A/2P PV BREAKER TO BE <br />INSTALLED ON THE FARTHEST <br />SLOT OF THE MAIN BREAKER <br />---- <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />3 <br /> <br /> <br />20 <br />0 <br />8 <br /> <br />W <br />E <br />S <br />T <br /> <br />1 <br />0 <br />T <br />H <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />. <br />E5 <br />SHEET NUMBER: <br />DRAWN BY: <br />DATE:7/26/22 <br /> I <br />G <br />N <br />A <br />C <br />I <br />O <br /> <br />P <br />L <br />A <br />S <br />C <br />E <br />N <br />C <br />I <br />A <br />PR <br />O <br />J <br />E <br />C <br />T <br />: <br />Am <br />e <br />r <br />i <br />c <br />a <br />n <br /> <br />A <br />r <br />r <br />a <br />y <br /> <br />S <br />o <br />l <br />a <br />r <br /> 2 <br />0 <br />2 <br />1 <br /> <br />L <br />a <br />s <br /> <br />P <br />o <br />s <br />i <br />t <br />a <br />s <br /> <br />C <br />o <br />u <br />r <br />t <br /> # <br />1 <br />2 <br />9 <br /> <br />L <br />i <br />v <br />e <br />r <br />m <br />o <br />r <br />e <br /> <br />C <br />A <br /> <br />9 <br />4 <br />5 <br />5 <br />1 <br />84 <br />4 <br /> <br />3 <br />4 <br /> <br />S <br />O <br />L <br />A <br />R <br />Li <br />c <br /># <br />9 <br />9 <br />3 <br />4 <br />6 <br />7 <br /> <br />C <br />- <br />1 <br />0 <br /> <br />& <br /> <br />C <br />3 <br />9 <br />ELECTRICAL LINE DIAGRAM <br />(E)200A MAIN SERVICE PANEL <br />(E)200A MAIN BREAKER END FED <br />WILL BE DOWNSIZED TO <br />(N)175A MAIN BREAKER <br />(N)50A/2P PV BREAKER TO BE <br />INSTALLED ON THE FARTHEST SLOT OF <br />THE MAIN BREAKER <br />2008 W 10th St - <br />2017725809/21/22