Laserfiche WebLink
JB <br />PVLC <br />MP <br />ACD <br />JPH <br />G-3 <br />SHEET NUMBER: <br />DRAWN BY: <br />DATE: <br />REV: <br />5/24/22 <br />6/30/22 <br />PROJECT: <br />2030 N TUSTIN AVE. <br />2030 N TUSTIN AVE., <br />SANTA ANA, CA 92705 <br />LICENSE HOLDER'S <br />SIGNATURE <br />CONTRACTOR: <br />SUNKO SOLAR <br />1540 6TH ST. #304 <br />SANTA MONICA, CA 90401 <br />(415) 866-0676 <br />CSLB # 1021907 <br /> C-46 <br />ROOF PLAN & EQUIPMENT LOCATIONS <br />SCALE: 1/8" = 1'-0" <br />FIRE ACCESS POINT FOR <br />ACCESS LADDER PER CFC <br />605.11.1.1 <br />(40) (N) SOLAR MODULES PAIRED WITH <br />(40) (N) MICROINVERTERS TO BE <br />MOUNTED UNDER ARRAY <br />PITCH: 18° <br />AZIMUTH: 270° <br />TOTAL AREA OF ARRAY: <br />845 SQ. FT. OVER 1ST STORY <br />COMPOSITION SHINGLE ROOF <br />MP <br />SERVICE POINT & <br />UTILITY METERING <br />CONDUIT RUN <br />JB JUNCTION BOX <br />4' FIRE ACCESS PATHWAY <br />ROOF VENTS, OBSTRUCTIONS <br />CONDUIT TO BE RUN ON CONDUIT <br />BLOCKS MIN. 1" ABOVE ROOF SURFACE, <br />CLOSE TO RIDGE LINES, AND UNDER <br />EAVES, AND/OR IN ATTIC; WIRING <br />METHODS SHALL NOT BE INSTALLED <br />WITHIN 18" OF THE ROOF DECKING OR <br />SHEATHING EXCEPT WHERE DIRECTLY <br />BELOW THE ROOF SURFACE COVERED <br />BY PV MODULES. CIRCUITS SHALL BE <br />RUN PERPENDICULAR TO THE ROOF <br />PENETRATION POINT TO SUPPORTS A <br />MINIMUM OF 18" BELOW THE ROOF <br />DECKING PER CEC 690.31(E)(1); DC <br />CONDUIT TO BE LABELED AT MAX 10' <br />INTERVALS <br />CONDUIT RUNS ARE APPROXIMATE AND <br />ARE TO BE DETERMINED IN THE FIELD BY <br />THE INSTALLERS <br />FIRE ACCESS POINT FOR ACCESS <br />LADDER PER CFC 605.11.1.1 <br />EQUIPMENT LEGEND <br />PVLC <br />ACD <br />DEDICATED PV LOAD CENTER <br />AC DISCONNECT <br />AC SUBPANELSUB <br />WHERE EXPOSED, CONDUIT, WIRING <br />SYSTEMS, AND RACEWAYS FOR <br />PHOTOVOLTAIC CIRCUITS SHALL BE <br />LOCATED AS CLOSE AS POSSIBLE TO THE <br />RIDGE OR HIP OR VALLEY AND FROM THE <br />HIP OR VALLEY AS DIRECTLY AS POSSIBLE <br />TO AN OUTSIDE WALL TO REDUCE TRIP <br />HAZARDS AND MAXIMIZE VENTILATION <br />OPPORTUNITIES. CONDUIT RUNS BETWEEN <br />SUB ARRAYS AND TO DC COMBINER BOXES <br />SHALL BE INSTALLED IN A MANNER THAT <br />MINIMIZES THE TOTAL AMOUNT OF CONDUIT <br />ON THE ROOF BY TAKING THE SHORTEST <br />PATH FROM THE ARRAY TO THE DC <br />COMBINER BOX. THE DC COMBINER BOXES <br />SHALL BE LOCATED SUCH THAT CONDUIT <br />RUNS ARE MINIMIZED IN THE PATHWAYS <br />BETWEEN ARRAYS. DC WIRING SHALL BE <br />INSTALLED IN METALLIC CONDUIT OR <br />RACEWAYS WHEN LOCATED WITHIN <br />ENCLOSED SPACES IN A BUILDING. CONDUIT <br />SHALL RUN ALONG THE BOTTOM OF LOAD <br />BEARING MEMBERS. <br />ALL EXPOSED CONDUIT MUST BE <br />PAINTED TO MATCH COLOR OF THE <br />BUILDING <br />DO NOT COVER MECHANICAL AND <br />PLUMBING VENTS AT ROOF WITH <br />SOLAR PV PANELS <br />ELEVATION OF PV PANELS <br />DOES NOT EXCEED THE HIGHEST <br />POINT OF THE ROOF RIDGE; <br />SEE S-1 FOR DETAIL <br />NO OPERABLE WINDOWS ABOVE <br />ROOF PLANES WHERE MODULES ARE <br />LOCATED <br />18 <br />° <br />18 <br />° <br />4'-0" ACCESS <br />PATHWAY, TYP <br />3'-0"FLAT <br />ROOF <br />(N) PV LOAD CENTER TO BE INSTALLED ON <br />EXTERIOR WALL, ACCESSIBLE ON THE FLAT ROOF <br />(E) ROOF <br />ACCESS <br />HATCH, TYP <br />(N) PV AC DISCONNECT (INSIDE ELECTRICAL ROOM, GROUND LEVEL) <br />(E) 400A SERVICE ENTRANCE AND MAIN SWITCHGEAR (INSIDE ELECTRICAL ROOM, GROUND LEVEL) <br />(E) ELECTRICAL ROOM (1ST STORY, GROUND LEVEL) HAS <br />ROOF ACCESS LADDER LEADING TO (E) ROOF ACCESS HATCH <br />UNIT <br />A <br />UNIT <br />B <br />2030 N Tustin Ave <br />- 101111576 & <br />2017705901/10/23