My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2030 W. Ninth Street - Plan
PBA
>
Building
>
ProjectDox
>
N
>
Ninth St
>
2030 W Ninth St
>
2030 W. Ninth Street - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 1:40:12 PM
Creation date
5/30/2025 8:00:51 AM
Metadata
Fields
Template:
Plan
Permit Number
20175398
101109540
Full Address
2030 W Ninth St
Document Relationships
101109540 - Permit
(Permit - Plan)
Path:
\Building\Permits\N\Ninth St\2030 W Ninth St
20175398 - Permit
(Permit - Plan)
Path:
\Building\Permits\N\Ninth St\2030 W Ninth St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Certificate: 70131735 <br />Project: 80050628 <br />Master Contract: 266909 <br />Date Issued: 2020-09-29 <br /> <br />DQD 507 Rev. 2019-04-30 © 2018 CSA Group. All rights reserved. Page 2 <br />Solarmount <br />The system listed is designed to provide bonding/grounding, and mechanical stability for photovoltaic modules. <br />The system is secured to the roof with the L-Foot components through the roofing material to building structure. <br />Modules are secured to the racking system with stainless steel or aluminum mid clamps and Aluminum end <br />clamps. The modules are bonded to the racking system with the stainless steel bonding mid clamps with piercing <br />points. The system is grounded with 10 AWG copper wire to bonding/grounding lugs. Fire ratings of Class A <br />with Type 1, 2, 3, or 10 for steep slope. Tested at 5 interstitial gap which allows installation at any stand -off <br />height. <br />The grounding of the system is intended to comply with the latest edition of the National Electrical Code, to <br />include NEC 250 & 690. Local codes compliance is required, in addition to national codes. All <br />grounding/bonding connections are to be torqued in accordance with the Installation Manual and the settings used <br />during the certification testing for the current edition of the project report. <br />The system may employ optimizers/micro-inverters and used for grounding when installed per installation <br />instructions. <br />UL 2703 Mechanical Load ratings: <br />Downward Design Load (lb/ft²) 75.2 <br />Upward Design Load (lb/ft²) 33.4 <br />Down-Slope Load (lb/ft²) 5.0 <br />Test Loads: <br />Downward Load (lb/ft²)112.8 <br />Upward Load (lb/ft²)50.13 <br />Down-Slope Load (lb/ft²)7.5 <br />Unirac Large Array <br />ULA is a ground mount system using the SolarMount (SM) platform for the bonding and grounding of PV <br />modules. ULA aluminum components merge with SM rails and installer-supplied steel pipe. The SM rail system <br />is secured to the horizontal Pipe using the Rail Bracket components. The Rear and Front cap secures the <br />horizontal Pipe to the vertical Pipe. The Front cap is also used to secure the Cross brace. A Slider is attached to <br />the vertical Pipe to secure the Cross brace. The SM rails, caps, slider, rail brackets, and cross braces materials are <br />6105-T5 aluminum extrusion. Fasteners materials are 304 stainless steel. Horizontal and vertical pipe materials <br />meet the minimum requirements of ASTM A53 for galvanized steel pipe in 2 and 3 diameter. <br />The mechanical load ratings from the SM test data will be applied to the ULA model. <br />Fire Testing is not applicable due to being a ground mount system. <br />Certificate: 70131735 <br />Project: 80050628 <br />Master Contract: 266909 <br />Date Issued: 2020-09-29 <br />DQD 507 Rev. 2019-04-30 © 2018 CSA Group. All rights reserved. Page 3 <br />Conditions of Acceptability: <br />Installation is subject to acceptance of the local inspection authorities having jurisdiction. The certification of <br />these products relates only to the methods of installation, bonding, and grounding as outlined in the Installation <br />Manual for each product. <br />APPLICABLE REQUIREMENTS <br />UL 2703-1st Edition - Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground <br />Lugs for Use with Flat-Plate Photovoltaic Modules and Panels. <br />LTR AE-001-2012 - List of Technical Requirements for Photovoltaic Module and Panel racking Systems <br />MARKINGS <br />The manufacturer is required to apply the following markings: <br />x Products shall be marked with the markings specified by the particular product standard. <br />x Products certified for Canada shall have all Caution and Warning markings in both English and French. <br />Additional bilingual markings not covered by the product standard(s) may be required by the Authorities Having <br />Jurisdiction. It is the responsibility of the manufacturer to provide and apply these additional markings, where <br />applicable, in accordance with the requirements of those authorities. <br />The products listed are eligible to bear the CSA Mark shown with adjacent indicators 'C' and 'US' for Canada and <br />US (indicating that products have been manufactured to the requirements of both Canadian and U.S. Standards) or <br />with adjacent indicator 'US' for US only or without either indicator for Canada only. <br />The following markings appear on the rail by adhesive label: <br />1. Submitters name and/or CSA Master Contract number 266909; <br />2. Model designation; <br />3. Manufacturing date; <br />4. System fire class rating/designation of information location in Installation Manual; <br />5. Design load rating/designation of information location in Installation Manual; <br />The following markings appear on the Mid clamp by stamping: <br />1. Submitters name and/or CSA Master Contract number 266909; <br />2. CSA mark <br />3. Mil ID for factory location <br />2030 W. Ninth <br />Street02/23/22
The URL can be used to link to this page
Your browser does not support the video tag.