Laserfiche WebLink
McPherson Engineering By: S.R. <br />Date: 12/10/21 <br />Gravity Loads: <br />DEMAND DECREASED BY 6.58% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 2.95% < 10% = OK! <br />Anchorage: <br />DEMAND OF 674.9LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />10/12/2021 11:39 <br />7 of 8 <br />©McPherson Engineering <br />2127 N Westwood <br />Avenue08/02/22