My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2130 E 17th St - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Seventeenth St
>
2130 E Seventeenth St Unit# A
>
2130 E 17th St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 1:40:33 PM
Creation date
5/30/2025 8:00:52 AM
Metadata
Fields
Template:
Plan
Permit Number
101112794
Full Address
2130 E Seventeenth St Unit# A
Document Relationships
101112794 - Permit
(Permit - Plan)
Path:
\Building\Permits\S\Seventeenth St\2130 E Seventeenth St Unit# A
Text box
ID:
1
Creator:
Import Agent
Created:
5/30/2025 10:00 AM
Modified:
5/30/2025 8:26 AM
Text:
http://www.sevansolutions.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OA <br />OAD <br />OAT <br />RAD <br />RA <br />RIB <br />SA <br />SASD <br />SF <br />VFD <br />RAT <br />TYPICAL ABBREVIATIONS <br />CHWR <br />CHWRT <br />CHWS <br />CHWST <br />C02 <br />EF <br />CS <br />DAT <br />HWR <br />HWRT <br />CHWV <br />= CARBON DIOXIDE <br />= CURRENT SENSOR <br />= EXHAUST FAN <br />= CHILLED WATER RETURN <br />= CHILLED WATER RETURN TEMP. <br />= CHILLED WATER SUPPLY <br />= CHILLED WATER SUPPLY TEMP. <br />= CHILLED WATER VALVE <br />= DISCHARGE AIR TEMP. <br />= HOT WATER RETURN <br />= HOT WATER RETURN TEMP. <br />XFR HWST <br />HWV = HOT WATER VALVE <br />= HOT WATER SUPPLY TEMP. <br />WMS HWS = HOT WATER SUPPLY <br />= OUTSIDE AIR <br />= OUTSIDE AIR DAMPER <br />= OUTSIDE AIR TEMP. <br />= RETURN AIR <br />= RETURN AIR DAMPER <br />= RETURN AIR TEMP. <br />= RELAY IN A BOX <br />= SUPPLY AIR <br />= SUPPLY AIR SMOKE DETECTOR <br />= SUPPLY FAN <br />= VARIABLE FREQUENCY DRIVE <br />= WALL MODULE SENSOR <br />= TRANSFORMER <br />3 <br />ZN-T 3 <br />SA <br />3 <br />3 <br />SAC <br />COM <br />1 <br />- <br />+ <br />TO HEAT PUMP <br />BACNET MS/TP BUS <br />REMOTE SENSOR <br />SUPPLY AIR SENSOR <br />COM - <br />W2W1 <br />SAT <br />3 <br />+ <br />1 <br />G C Y1 Y2 <br />E <br />H <br />BACNET MS/TP BUS <br />FROM SBH <br />POWER <br />SF <br />D <br />X <br />FILTER <br />TEC363X <br />R POWER <br />COMPRESSOR 2 <br />POWER <br />COMPRESSOR 1 <br />RA <br />OA <br />ROOF DECK <br />CO <br />M <br />WH <br />T <br />BL <br />K <br />ACI <br />ACI <br />JOHNSON CONTROLS <br />MANUFACTURER <br />1 <br />1 <br />1 <br />QTY <br />T-STAT <br />ZNT <br />SAT <br />TAG <br />TEC3630-00-000 <br />A/CP-R2 <br />A/CP-D-4"-PB <br />PART NUMBER <br />COM <br />24V <br />OAD <br />SAT <br />R SEN <br />B12 <br />B11 <br />NET COM <br />NET - <br />NET + <br />AUX <br />AUX <br />G <br />Y2 <br />Y1 <br />WA OB <br />RH <br />W2 SUP <br />COM <br />OAT <br />R <br />C <br />G <br />Y2 <br />Y1 <br />OB <br />SUP <br />3 24VAC <br />FAN <br />3 24VAC COM <br />COOLING STAGE 2 <br />COOLING STAGE 1 <br />REVERSING VALVE <br />SUPPLEMENTAL HEAT <br />4 <br />3 <br />2 <br />1 THE BLACK WIRE MUST BE HOOKED TO THE "+" ON EACH <br />UNIT AND WHITE WIRE TO THE "-" TERMINAL ON EACH UNIT. <br />CONNECT COMMON AT NOTED PORT FROM 22AWG/3 <br />BACNET COMMUNICATION CABLE. <br />A COMMON WIRE MUST BE HOOKED UP BETWEEN THE <br />THERMOSTAT AND THE HVAC UNIT FOR THERMOSTAT TO <br />FUNCTION PROPERLY. <br />ALL SENSOR WIRES TO BE 18/2 SHIELDED PLENUM RATED <br />CABLE. <br />TOGGLE EOL "END OF LINE" SWITCH ON LAST STAT WITHIN <br />NETWORK. <br />CONTRACTOR NOTES <br />RTU TERMINATIONS <br />18/8 THERMOSTAT CABLE <br />COM <br />BACNET ROOM THERMOSTAT <br />10K TYPE II ROOM TEMP SENSOR <br />10K TYPE II 4" DUCT TEMP SENSOR <br />DESCRIPTION <br />Control Components <br />WHT <br />BLK <br />10 11 <br />3 <br />ZN-T <br />SA <br />3 <br />SAT <br />FROM SBH <br />- + <br />1 <br />W2G Y1 W1 <br />COM <br />BACNET MS/TP BUS <br />3 <br />G <br />F <br />C Y2 R <br />SF <br />11 <br />D <br />X <br />POWER <br />FILTER <br />RA <br />POWER <br />COMPRESSOR 2 <br />10 <br />TEC363X <br />SAC <br />1 <br />TO RTU <br />BACNET MS/TP BUS <br />REMOTE SENSOR <br />SUPPLY AIR SENSOR <br />COM <br />CO <br />M <br />WHT <br />BLK <br />- <br />+ <br />WH <br />T <br />BL <br />K <br />DESCRIPTION <br />ACI <br />ACI <br />JOHNSON CONTROLS <br />Control Components <br />COM <br />BACNET ROOM THERMOSTAT <br />10K TYPE II ROOM TEMP SENSOR <br />10K TYPE II 4" DUCT TEMP SENSOR <br />COM <br />24V <br />OAD <br />SAT <br />R SEN <br />B12 <br />B11 <br />NET COM <br />NET - <br />NET + <br />TEC3630-00-000 <br />A/CP-R2 <br />A/CP-D-4"-PB <br />1 T-STAT <br />1 ZNT <br />1 SAT <br />QTY TAG PART NUMBER <br />AUX <br />AUX <br />G <br />Y2 <br />Y1 <br />WA OB <br />RH <br />W2 SUP <br />COM <br />OAT <br />MANUFACTURER <br />3 <br />3 <br />OA <br />ROOF DECK <br />FAN <br />R <br />C <br />G <br />Y2 <br />Y1 <br />W1 <br />W2 <br />3 <br />3 <br />24VAC <br />24VAC COM <br />4 <br />3 <br />2 <br />1 THE BLACK WIRE MUST BE HOOKED TO THE "+" ON EACH <br />UNIT AND WHITE WIRE TO THE "-" TERMINAL ON EACH UNIT. <br />CONNECT COMMON AT NOTED PORT FROM 22AWG/3 <br />BACNET COMMUNICATION CABLE. <br />A COMMON WIRE MUST BE HOOKED UP BETWEEN THE <br />THERMOSTAT AND THE HVAC UNIT FOR THERMOSTAT TO <br />FUNCTION PROPERLY. <br />ALL SENSOR WIRES TO BE 18/2 SHIELDED PLENUM RATED <br />CABLE. <br />TOGGLE EOL "END OF LINE" SWITCH ON LAST STAT WITHIN <br />NETWORK. <br />CONTRACTOR NOTES <br />RTU TERMINATIONS <br />18/8 THERMOSTAT CABLE <br />COOLING STAGE 2 <br />COOLING STAGE 1 <br />HEATING STAGE 1 <br />HEATING STAGE 2 <br />POWER <br />COMPRESSOR 1 <br />08/04/22 <br />SHEET NUMBER <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />S <br />SH <br />E <br />E <br />T <br /> <br />M <br />A <br />N <br />A <br />G <br />M <br />E <br />N <br />T <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />I <br />N <br />F <br />O <br />R <br />M <br />A <br />T <br />I <br />O <br />N <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />O <br />. <br />: <br />DA <br />T <br />E <br /> <br />I <br />S <br />S <br />U <br />E <br />D <br />: <br />DR <br />A <br />W <br />N <br /> <br />B <br />Y <br />: <br />RE <br />V <br />I <br />E <br />W <br />E <br />D <br /> <br />B <br />Y <br />: <br />SEAL <br />Corporate Office: <br />3025 Highland Parkway | Suite 850 <br />Downers Grove, IL 60515 <br />info@sevansolutions.com <br />www.sevansolutions.com <br />INTEGRITY | RESPECT | TEAMWORK <br />EXCELLENCE | CHARITY <br />DESIGN SOLUTIONS, P.C. <br />27 <br />0 <br />0 <br /> <br />M <br />I <br />L <br />A <br />N <br /> <br />C <br />O <br />U <br />R <br />T <br />, <br /> <br />B <br />I <br />R <br />M <br />I <br />N <br />G <br />H <br />A <br />M <br />, <br /> <br />A <br />L <br /> <br />3 <br />5 <br />2 <br />1 <br />1 <br />CO <br />N <br />T <br />A <br />C <br />T <br /> <br />H <br />I <br />B <br />B <br />E <br />T <br />T <br /> <br />C <br />O <br />N <br />S <br />T <br />R <br />U <br />C <br />T <br />I <br />O <br />N <br /> <br />D <br />E <br />P <br />A <br />R <br />T <br />M <br />E <br />N <br />T <br />@ <br />( <br />2 <br />0 <br />5 <br />) <br /> <br />9 <br />4 <br />2 <br />- <br />4 <br />2 <br />9 <br />2 <br />1 <br />5 <br />4 <br />0 <br />07 <br />/ <br />0 <br />1 <br />/ <br />2 <br />2 <br />GR <br />S <br />NO <br />. <br />DA <br />T <br />E <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />22 <br />0 <br />5 <br />8 <br />0 <br />SE <br /> <br />J <br />O <br />B <br /># <br />: <br />New York Omaha HonoluluMiami Los Angeles Seattle <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />21 <br />3 <br />0 <br /> <br />E <br /> <br />1 <br />7 <br />T <br />H <br /> <br />S <br />T <br />. <br />- <br />- <br />- <br />- <br />- <br />- <br />SCALE: <br />1 <br />M2.0 <br />EMS CONVENTIONAL UNIT THERMOSTAT CONTROL CONNECTION DETAIL <br />NONESCALE: <br />2 <br />M2.0 <br />EMS HEAT PUMP THERMOSTAT CONTROL CONNECTION DETAIL <br />NONE <br />4 <br />SURFACE-MOUNT AND INSTALL JOHNSON CONTROL VERASYS SMART BUILDING HUB <br />(SBH) MODEL LC-SBH200-0 HVAC COMMUNICATION DEVICE ON TELEPHONE <br />BACKBOARD PER DETAIL SHOWN. CONNECT POWER FOR SBH TO RECEPTACLE VIA <br />ACC-PWRKIT-1A24 POWER ADAPTER. SEE DETAIL 3/M2.0. UNIT IS TO BE SUPPLIED BY <br />JAKE MARSHALL SERVICE, INC. <br />JOHNSON CONTROLS (JCI) TEC3630-00-000 THERMOSTAT ON A PANDUIT JB1DAW-A <br />SINGLE GANG BOX. THERMOSTAT TO BE PROVIDED BY JAKE MARSHALL SERVICE, INC. <br />THERMOSTAT SET POINTS SHALL BE 74 COOL/68 HEAT AND LOCKED OUT. SEE <br />CONNECTION DETAILS ON THIS SHEET AND PROGRAMMING DETAILS ON PROVIDED <br />CONTROL DRAWINGS. <br />CONNECT EACH THERMOSTAT, STARTING WITH THE ONE FURTHEST FROM THE SBH, <br />WITH BACNET COMMUNICATION WIRE THAT IS PROVIDED WITH THE BILL OF <br />MATERIALS FROM JAKE MARSHALL SERVICE, INC. DAISY-CHAIN EACH THERMOSTAT TO <br />THE NEXT AND CONNECT TO THE TOP OF THE SBH UNIT AS SHOWN ON DETAIL 5/M2.0. <br />SURFACE MOUNT 2" PANDUIT WIRE DUCT MODEL TE-6311M-1 AND COVER MODEL <br />C2LG6 AS NOTED IN DETAIL 5/M2.0. 1" CONDUIT IS TO BE SURFACE MOUNTED FROM <br />FINISHED CEILING TO 6'-6" A.F.F. AND CONNECTED TO THE WIRE DUCT PER DETAIL <br />5/M2.0. SOURCE WIRE DUCT LOCALLY. <br />MECHANICAL CONTRACTOR IS TO INSTALL NEW EMS CEILING-MOUNTED <br />TEMPERATURE SENSOR(S) MODEL TSD0 AND CONNECT TO THERMOSTAT(S) VIA WIRE <br />DUCT. SENSOR IS TO BE CEILING-MOUNTED NEAR RETURN AIR GRILLE. SEE <br />MECHANICAL PLAN 1/M1.0 FOR GENERAL LOCATION. VERIFY FINAL LOCATION OF <br />SENSORS WITH HIBBETT SPORTS CONSTRUCTION DEPARTMENT PRIOR TO <br />INSTALLATION. SENSORS ARE TO BE CONNECTED VIA NEW 18/2 SHIELDED STRANDED <br />WIRE. SEE BELOW FOR CONNECTION DETAILS. SENSORS TO BE FROM JAKE MARSHALL <br />SERVICES, INC. <br />RUN NEW 8 CONDUCTOR PLENUM RATED WIRE THERMOSTAT WIRE FROM HVAC UNIT <br />THROUGH CONDUIT AND WIRING DUCT TO CONNECT TO THERMOSTAT FOR SPECIFIED <br />UNIT. SEE BELOW FOR CONNECTION DETAILS. CONTACT JAKE MARHSALL SERVICE, <br />INC. TO TROUBLESHOOT CONNECTIONS AS NEEDED. <br />MECHANICAL CONTRACTOR IS TO INSTALL NEW EMS DUCT SENSOR(S) MODEL <br />TE-6311M-1 WITHIN SUPPLY DUCT PER MANUFACTURER'S RECOMMENDATIONS. <br />CONNECT SENSOR TO HVAC TERMINAL(S) WITHIN EMS PANEL. DUCT SENSORS ARE TO <br />BE CONNECTED VIA NEW 18/2 SHIELDED STRANDED WIRE. SENSORS TO BE FROM <br />JAKE MARSHALL SERVICE, INC. <br />RECEPTACLE LOCATED AT THE TELEPHONE BACKBOARD IS TO BE UTILIZED TO <br />POWER JOHNSON CONTROL VERASYS SMART BUILDING HUB (SBH) MODEL C-SBH200-0. <br />SEE SHEET E1.0, POWER KEYED NOTE 13 FOR ELECTRICAL RECEPTACLE DETAILS AND <br />DETAIL 3/M2.0 FOR SBH DETAILS. <br />END OF LINE "EOL" SWITCH. THIS SWITCH IS TO BE TOGGLED/SWITCHED AT LAST <br />THERMOSTAT/CONTROLLER IN NETWORK. <br />UTILIZE PROVIDED THUMB DRIVE FILES TO CONFIGURE STATS ONCE THE NETWORK <br />AND STATS ARE INSTALLED. CONNECT TO USB PORTS. <br />BACNET ADDRESSING AND COMMISSIONING IS TO TAKE PLACE ONCE SYSTEM IS <br />INSTALLED AND FILES ARE UPLOADED. COMMISSIONING MENU WILL ALLOW TECH TO <br />TEST ALL SYSTEM FUNCTIONS. <br />THE SMART BUILDING HUB IS THE BASE CONTROLLER FOR THE VERASYS BUILDING <br />AUTOMATION SYSTEM AND PROVIDES WIRED AND WIRELESS CONNECTIONS AND <br />PLUG AND PLAY CONFIGURATION TO THERMOSTATS. THE SMART BUILDING HUB <br />CONNECTS TO AN ETHERNET NETWORK AND BE ACCESSED ON OR OFF SITE. <br />THE SMART BUILDING HUB IS TO BE PERMANENTLY ATTACHED WITH SCREWS TO THE <br />TELEPHONE BACKBOARD PER DETAILS ON THIS SHEET AND PLUGGED INTO THE <br />SYSTEM BUS TO ALLOW ACCESS TO THE FACILITY. <br />JCI VERASYS BUILDING CONTROL SYSTEM <br />SCALE: <br />3 <br />M2.0 <br />DETAIL LEGEND <br />NONE9 <br />11 <br />10 <br />6 <br />8 <br />7 <br />5 <br />INSTRUCTIONS PROVIDED IN THE CONTROLS INSTALLATION PACKAGE SUPERSEDE THESE DOCUMENTS. THEY CONTAIN THE <br />LATEST INFORMATION CONCERNING THE CORRECT INSTALLATION AND COMMISSIONING OF THIS SYSTEM. <br />G.C. SHALL CONTACT JAKE MARSHALL SERVICE AND SETUP TIME TO COMMISSION SYSTEM (AS NOTED IN EMS INFO SECTION ON <br />THIS SHEET) PRIOR TO TURNOVER. ANY SERVICE CALLS OR ADDITIONAL COST INCURRED DUE TO NOT FOLLOWING THESE <br />CONTROL DRAWINGS AND COMMISSIONING PROCEDURE WILL BE THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR <br />AND/OR GENERAL CONTRACTOR. <br />HIBBETT GENERAL CONTRACTOR SHALL NOT BE PAID FINAL 10% OF CONTRACT AMOUNT UNTIL COMMISSIONING PROCEDURE <br />AND CHECK-OFF BY JAKE MARSHALL SERVICE HAS BEEN COMPLETED. <br />ENERGY MANAGEMENT SYSTEM PROVIDED BY JAKE MARSHALL SERVICE, INC. <br />COMMUNICATE HVAC EQUIPMENT INFORMATION TO JAKE MARSHALL SERVICE, INC. DURING INSTALL OF SYSTEM. THERMOSTATS <br />USED WITHIN SYSTEM FOR HIBBETT SPORTS HAVE SPECIFIC SETTINGS (74° A/C & 68° HEAT). VERIFY THAT HIBBETT'S SETTINGS <br />ARE PRESET ON STATS INSTALLED. FAILURE TO DO SO WILL RESULT IN RE-INSTALLATION AT RESPONSIBLE PARTY'S EXPENSE. <br />VERIFY THERMOSTATS ARE COMPATIBLE WITH EXISTING HVAC UNITS; OTHERWISE, INSTALL INTERFACE EQUIPMENT AS <br />NECESSARY. <br />SUPPORT CONTACT: DREW DANIEL WITH JAKE MARSHALL SERVICE, INC. @ OFFICE (423) 266-7200 <br />EMAIL: DDANIEL@JMSERVICE.COM <br />TECHNICAL SUPPORT CONTACT: NICK WORKMAN WITH JAKE MARSHALL SERVICE, INC. @ OFFICE: (423) 266-7200 <br />EMAIL: NWORKMAN@JMSERVICE.COM <br />* AFTER INSTALLATION IS COMPLETE, G.C. MUST CONTACT THE TECHNICAL SUPPORT NUMBER ABOVE TO CONFIRM CONTROLS <br />OPERATION. PLEASE SCHEDULE AT LEAST 24 HOURS IN ADVANCE. ASSISTANCE WILL BE AVAILABLE MONDAY - FRIDAY, 8AM TO <br />4PM, EASTERN TIME UNLESS OTHERWISE SCHEDULED. <br />CONTACT JAKE MARSHALL SERVICE, INC. FOR QUESTIONS ON ALL CONTROL DEVICES AND EQUIPMENT. NO EXCEPTIONS <br />ALLOWED. <br />SUPPORT CONTACT: DREW DANIEL WITH JAKE MARSHALL SERVICE, INC. @ OFFICE (423) 266-7200 <br />EMAIL: DDANIEL@JMSERVICE.COM <br />TECHNICAL SUPPORT CONTACT: NICK WORKMAN WITH JAKE MARSHALL SERVICE, INC. @ OFFICE: (423) 266-7200 <br />EMAIL: NWORKMAN@JMSERVICE.COM <br />* AFTER INSTALLATION IS COMPLETE, G.C. MUST CONTACT THE TECHNICAL SUPPORT NUMBER ABOVE TO CONFIRM CONTROLS <br />OPERATION. PLEASE SCHEDULE AT LEAST 24 HOURS IN ADVANCE. ASSISTANCE WILL BE AVAILABLE MONDAY - FRIDAY, 8AM TO <br />4PM, EASTERN TIME UNLESS OTHERWISE SCHEDULED. <br />JAKE MARSHALL SERVICE, INC. <br />HVAC CONTROL NOTES <br />3 <br />2 <br />1 <br />HIBBETT EMS CONTROL DRAWINGS AND COMMISSIONING: <br />HIBBETT ENERGY MANAGEMENT SYSTEM (EMS) INFO: <br />HV <br />A <br />C <br />CO <br />N <br />T <br />R <br />O <br />L <br /> <br />D <br />E <br />T <br />A <br />I <br />L <br />S <br />M2.0 <br />PM <br />P <br />2130 E 17th St - <br />10111279406/07/23
The URL can be used to link to this page
Your browser does not support the video tag.