Laserfiche WebLink
McPherson Engineering By: C.C. <br />Date: 6/9/22 <br />Gravity Loads: <br />DEMAND DECREASED BY 14.42% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 6.56% < 10% = OK! <br />Anchorage: <br />DEMAND OF 358.7LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />6/9/2022 5:01 PM <br />7 of 7 <br />©McPherson Engineering <br />2121 S Oak St <br />07/20/22