My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2231 S Shelton St Unit #2 - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Shelton St
>
2231 S Shelton St Unit# 2
>
2231 S Shelton St Unit #2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 1:41:10 PM
Creation date
5/30/2025 8:00:53 AM
Metadata
Fields
Template:
Plan
Permit Number
101112760
Full Address
2231 S Shelton St Unit# 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ALLSTAR ENGINEERING GROUP JOB NO:23-015 <br />CONSULTING & DESIGN 1-STORY ROOM ADDITION <br />644 NORTH POPLAR ST., SUITE 'B' BY: AB <br />ORANGE, CA 92868 2231 SHELTON ST, UNIT 2 SANTA ANA, CA. 92707 <br />714‐984‐3986 DATE: 3/6/23 <br />allstarengr@gmail.com <br />www.abcivilengineering.com SH:B - 5 <br />FOUNDATION <br />Foundation is Slab on grade with continuous footings. <br />Allowable soil bearing = 1500 psf at continuous footings <br />= 1500 psf at isolated pad footings <br />Uniform Load at Continuous Footing <br />w,max = 488 plf = Roof*10.5+Ext. Wall*8 <br />Width = 0.325 ft = w,max / ASB 12'' wide footing OK <br />Allowable Concentrated Load at Uniform Footin <br />Ftg. Thick =2 ft. <br />P,all = 6000 lbs = ASB x thick x 2 x width(ft) <br />Pad at Front Porch <br />P,max = 859 lbs = Roof*8 <br />A,req = 0.57 ft^2 = 0.76 ft ea side 1'-0'' sq x 18'' dp pad <br />Minimum <br />3/6/2023 9:43 PM 23015 BM_ADD.xls <br />2231 S Shelton St Unit 2 - <br />10111276012/11/2023
The URL can be used to link to this page
Your browser does not support the video tag.