Laserfiche WebLink
Expedited Permit Process for PV Systems1 <br />Expedited Permit Process for PV Systems <br />Standard String System <br />The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permit Pro- <br />cess provides a means to differentiate systems that can be permitted quickly and easily <br />due to their similarity with the majority of small-scale PV systems. Those systems with <br />unique characteristics may be handled with small additions to this Expedited Permit <br />Process or may require much more information, depending on the uniqueness of the <br />installation. <br />The following pages contain forms for the Standard String System to use with the Expe- <br />dited Permit Process. The Micro-Inverter, AC Module, and Supply-Side Connection forms <br />are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- <br />tions that have adopted the Expedited Permit Process for PV Systems, these forms can <br />be filled out electronically and submitted in either printed form and via email. An elec- <br />tronic format is used so that the supplied information is standardized and legible for the <br />local jurisdiction. <br />2235 S. Park Drive <br />03/14/22