My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2319 N Flower St - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Flower St
>
2319 N Flower St
>
2319 N Flower St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 1:41:11 PM
Creation date
5/30/2025 8:00:53 AM
Metadata
Fields
Template:
Plan
Permit Number
20176065
101110288
Full Address
2319 N Flower St
Document Relationships
101110288 - Permit
(Permit - Plan)
Path:
\Building\Permits\F\Flower St\2319 N Flower St
20176065 - Permit
(Permit - Plan)
Path:
\Building\Permits\F\Flower St\2319 N Flower St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FASTER INSTALLATION. 25-YEAR WARRANTY. <br />FLASH KIT PRO IS THE COMPLETE FLASHING AND ATTACHMENT SOLUTION FOR COMPOSITION ROOFS. <br />FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 <br />PRE-INSTALL <br />• Locate roof rafters and snap chalk lines to mark the installation <br />point for each roof attachment. <br />• Drill a 7/32” pilot hole at each roof attachment. Fill each pilot hole <br />with sealant. <br />STEP 1 INSTALL FLASHKIT PRO FLASHING <br />• Add a U-shaped bead of roof sealant to the underside of the flashing <br />with the open side of the U pointing down the roof slope. Slide <br />the aluminum flashing underneath the row of shingles directly up <br />slope from the pilot hole as shown. Align the indicator marks on the <br />lower end of the flashing with the chalk lines on the roof to center <br />the raised hole in the flashing over the pilot hole in the roof. When <br />installed correctly, the flashing will extend under the two courses of <br />shingles above the pilot hole. <br />STEP 2 INSTALL L-FOOT <br />• Fasten L-foot and Flashing into place by passing the included lag <br />bolt and pre-installed stainless steel-backed EPDM washer through <br />the L-foot EPDM grommet, and the raised hole in the flashing, into <br />the pilot hole in the roof rafter. <br />• Drive the lag bolt down until the L-foot is held firmly in place. It is <br />normal for the EPDM on the underside of the stainless steel backed <br />EPDM washer to compress and expand beyond the outside edge of <br />the steel washer when the proper torque is applied. <br />TIP: <br />• Use caution to avoid over-torqueing the lag bolt if using an impact driver. <br />• Repeat Steps 1 and 2 at each roof attachment point. <br />STEP 3 ATTACH L-FOOT TO RAIL <br />• Insert the included 3/8"-16 T-bolts into the lower slot on the Rail <br />(sold separately), spacing the bolts to match the spacing between <br />the roof attachments. <br />• Position the Rail against the L-Foot and insert the threaded end of <br />the T-Bolt through the continuous slot in the L-Foot. Apply anti-seize <br />to bolt threads to prevent galling of the T-bolt and included 3/8” <br />serrated flange nut. Place the 3/8” flange nut on the T-bolt and <br />finger tighten. Repeat STEP 3 until all L-Feet are secured to the Rail <br />with a T-bolt. Adjust the level and height of the Rail and torque each <br />bolt to 30ft-lbs. <br />INSTALL FLASHKIT PRO FLASHING <br />STEP 1 STEP 2 STEP 3 <br />INSTALL L-FOOT ATTACH L-FOOT TO RAIL <br />FLASHKIT PRO <br /> INSTALLATION GUIDE <br />2319 N Flower <br />05/17/22
The URL can be used to link to this page
Your browser does not support the video tag.