My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2401 N Hathaway St - Plan
PBA
>
Building
>
ProjectDox
>
H
>
Hathaway St
>
2401 N Hathaway St
>
2401 N Hathaway St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 4:53:30 PM
Creation date
5/30/2025 8:00:54 AM
Metadata
Fields
Template:
Plan
Permit Number
20175012
20177169
101108961
Full Address
2401 N Hathaway St
Document Relationships
101108961 - Permit
(Permit - Plan)
Path:
\Building\Permits\H\Hathaway St\2401 N Hathaway St
20175012 - Permit
(Permit - Plan)
Path:
\Building\Permits\H\Hathaway St\2401 N Hathaway St
20177169 - Permit
(Permit - Plan)
Path:
\Building\Permits\H\Hathaway St\2401 N Hathaway St
Text box
ID:
1
Creator:
Import Agent
Created:
5/30/2025 4:47 PM
Modified:
5/30/2025 8:50 AM
Text:
http://www.evengineersnet.com
ID:
2
Creator:
Import Agent
Created:
5/30/2025 4:47 PM
Modified:
5/30/2025 8:50 AM
Text:
http://www.evengineersnet.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
03/09/2023 <br />RE: Structural Certification for Installation of Residential Solar <br /> JAMES MINNIS:2401 N HATHAWAY ST, SANTA ANA, CA 92705 <br />Attn: To Whom It May Concern <br />Design Criteria <br />Code 2022 California Building Code (ASCE 7-16) <br />Risk category II Wind Load (component and Cladding) <br />Roof Dead Load Dr 10 psf V 95 mph <br />PV Dead Load DPV 3 psf Exposure C <br />Roof Live Load Lr 20 psf <br />Ground Snow S 0 psf <br />If you have any questions on the above, please do not hesitate to call. <br />Sincerely, <br />Eugene Munyanziza, P.E.Signed 3/9/2023 <br />EV Engineering, LLC <br />projects@evengineersnet.com <br />http://www.evengineersnet.com <br />Exp: 06/30/2024 <br />This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV <br />system to existing roof framing. From the field observation report, the roof is made of Composition shingle <br />roofing over roof plywood supported by 2X4 Rafters at 24 inches. The slope of the roof was approximated to be <br />20 degrees and the allowable maximum rafter span is 6 feet between supports. <br />After review of the field observation data and based on our structural capacity calculation, the existing roof <br />framing has been determined to be adequate to support the imposed loads without structural upgrades. <br />Contractor shall verify that existing framing is consistent with the described above before install. Should they find <br />any discrepancies, a written approval from SEOR is mandatory before proceeding with install. Capacity <br />calculations were done in accordance with applicable building codes. <br />projects@evengineersnet.com <br />http://www.evengineersnet.com <br />2401 N Hathaway - <br />20177169 (Battery <br />Back-Up)06/12/23
The URL can be used to link to this page
Your browser does not support the video tag.