My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2510 N Hathaway St - Plan
PBA
>
Building
>
ProjectDox
>
H
>
Hathaway St
>
2510 N Hathaway St
>
2510 N Hathaway St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 1:41:55 PM
Creation date
5/30/2025 8:00:54 AM
Metadata
Fields
Template:
Plan
Permit Number
20176232
101110429
Full Address
2510 N Hathaway St
Document Relationships
101110429 - Permit
(Permit - Plan)
Path:
\Building\Permits\H\Hathaway St\2510 N Hathaway St
20176232 - Permit
(Permit - Plan)
Path:
\Building\Permits\H\Hathaway St\2510 N Hathaway St
Text box
ID:
1
Creator:
Import Agent
Created:
5/30/2025 10:00 AM
Modified:
5/30/2025 8:56 AM
Text:
http://www.prosolar.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Installation steps for both s-curve and flat concrete tile* <br />STEP 1: Select a tile in the area of the roof rafter. STEP 2: Remove the tile by pushing and pulling. <br />It is usually held in place by a small nail. <br />STEP 3: Using an electronic stud finder (recommended), <br />or other means, locate the rafter center. <br />Mark a reference point on the tile above. <br />Step 4: Seal the initial tile nail hole. Using a 3/16” <br />drill bit and drill guide (FJ-Drill), drill pilot hole <br />along the rafter center <br />Step 5: Insert the lag bolt and washer through <br />the TileTrac ® and apply fresh room temperature <br />sealant to the base. <br />Step 6: Using a 1/2" socket, install the lag bolt until <br />seated. Do not overtighten. The sealant should flow <br />outward sealing any holes. <br />Step 7: After bolting the base to the roof, slide the upper carriage <br />into the correct position under the crown of the tile. For Flat tile, <br />slide the upper carriage near the middle of the tile. <br />Step 8: Replace the tile by lining up the snap lines <br />and mark the drill location accordingly. <br />Step 9: Using a 3/8” carbide drill bit and ROTARY HAMMER <br />DRILL in hammer mode, drill through the tile. See online <br />video at www.prosolar.com for details. <br />Step 10: Insert the threaded stud through the tile and <br />tighten with 9/16" wrenches to engage stud with base. Bind <br />two 3/8” nuts (included) using 9/16” wrenches and tighten. <br />Step 11: Unbind nuts and remove from stud. Apply UV rated <br />sealant between stud base and tile and compress with a <br />3/8" washer. Apply UV rated sealant around top of washer. <br />*Not recommended for clay or slate tiles. <br />Step 12: Fasten rail with lower and upper <br />3/8" nuts/washers as shown. <br />Use a Rotary Hammer drill <br />for a 5 second drill time. <br />Tip: <br />Use a cordless impact wrench <br /> Tip: <br />Bind (2) 3/8" nuts and <br />washers to top of stud <br />prior to roof work <br />Drill 3/16" pilot hole. <br />©Professional Solar Products, Inc. June 2008. TileTrac®is a registered trademark and covered under Pat. #5,746,029 <br />2510 N. Hathaway <br />St05/26/22
The URL can be used to link to this page
Your browser does not support the video tag.