My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2510 N Hathaway St - Plan
PBA
>
Building
>
ProjectDox
>
H
>
Hathaway St
>
2510 N Hathaway St
>
2510 N Hathaway St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 1:41:55 PM
Creation date
5/30/2025 8:00:54 AM
Metadata
Fields
Template:
Plan
Permit Number
20176232
101110429
Full Address
2510 N Hathaway St
Document Relationships
101110429 - Permit
(Permit - Plan)
Path:
\Building\Permits\H\Hathaway St\2510 N Hathaway St
20176232 - Permit
(Permit - Plan)
Path:
\Building\Permits\H\Hathaway St\2510 N Hathaway St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 8 <br /> <br />Date Modified: 09/12/07 <br />Installation steps overview <br />1) System layout & chalk line marking <br />2) Locating roof rafters along chalk lines <br />3a) Sealing/attaching TileTrac® (S-Tile Roof) <br />3b) Sealing/attaching TileTrac ® (Composition Shingle Roof) <br />4) Clean up/Quality Inspection <br />Step 1: System layout & chalk line marking <br />Prior to beginning attachment work, the system <br />roof layout should be defined. <br />A drawing or sketch, prior to roof work, is <br />recommended. <br />Upon finalizing layout, use chalk lines to mark <br />support rail locations. The chalk lines will be <br />used to align TileTrac ® attachment points. <br />Note: All support rails should be placed 48 <br />apart along the module length. The rail dis- <br />tance from the end of the module will vary <br />based on module size. <br />The 48 grid design is based on 12, 16 or 24 on center (o/c) rafter spacing. <br />(12 x 4 = 48, 16 x 3 = 48, 24 x 2 = 48) <br />All product specifications are based on 48 paired support rail spacing. <br />Proper module/rail orientationsingle array sample <br />Rafter Directio <br />n <br /> Supp <br />o <br />r <br />t Rai <br />l Direc <br />t <br />ion <br />Clamps must secure the module on the <br />long end of the frame. The span of the two <br />support rails should be 48. <br />EXAMPLE: (Using a 64 long module) <br />48 64 <br />8 <br />8 <br />TileTrac <br />Installation Manual <br />® <br />Note: When configuring <br />layout account for a 0.6 inter- <br />module clamp space between <br />modules and 2 for each end of <br />the module array for end clamp <br />spacing. <br />Chalk line to reference <br />support rail placement <br />48 typical <br />0.6 Intermodule <br />clamp spacing <br />2.0 End Clamp <br />spacing <br />2510 N. Hathaway <br />St05/26/22
The URL can be used to link to this page
Your browser does not support the video tag.