My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2510 N Hathaway St - Plan
PBA
>
Building
>
ProjectDox
>
H
>
Hathaway St
>
2510 N Hathaway St
>
2510 N Hathaway St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 1:41:55 PM
Creation date
5/30/2025 8:00:54 AM
Metadata
Fields
Template:
Plan
Permit Number
20176232
101110429
Full Address
2510 N Hathaway St
Document Relationships
101110429 - Permit
(Permit - Plan)
Path:
\Building\Permits\H\Hathaway St\2510 N Hathaway St
20176232 - Permit
(Permit - Plan)
Path:
\Building\Permits\H\Hathaway St\2510 N Hathaway St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 6 of 8 <br /> <br />STEP 11: Apply UV rated sealant <br />around the threaded shaft and com- <br />press with a 3/8 washer included in <br />the kit. The 3/8 box-end wrench can <br />be used for this. <br />STEP 12: Apply UV rated sealant <br />around the top of the washer to com- <br />plete the waterproof tile seal. Now <br />the tile is completely waterproof. <br />Step 3b: Attaching / Sealing TileTrac® (Composition Roof) <br />STEP 2: Drill a 3/16 pilot hole to <br />depth of the lag bolt. <br />STEP 3: Apply a generous amount <br />of fresh sealant (polyurethane <br />based, such as Sikaflex 1-a recom- <br />mended) to the base. <br />Roofing mastic/sealant must be ap- <br />plied per manufacturers specifica- <br />tions. Mastic/sealant should be fresh <br />and applied at room temperature, as <br />necessary. <br />Date Modified: 09/12/07 <br />TileTrac <br />Installation Manual <br />® <br />Use of a 1/4 carbide tipped drill bit for breaking <br />through the rough composition shingle surface <br />only (not for pilot hole) will avoid premature pilot <br />hole drill bit wear. The use of two drillsone for <br />breaking through surface, one for pilot hole drill- <br />ingto decrease drill time is recommended. <br />STEP 11 STEP 12 <br />STEP 1 STEP 2 STEP 3 <br />STEP 1: Using a precision stud <br />finder, locate the absolute center of <br />the rafter. Mark with a crayon/chalk. <br />See section 3a Install Tip for additional <br />methods for locating rafters. <br />2510 N. Hathaway <br />St05/26/22
The URL can be used to link to this page
Your browser does not support the video tag.