Laserfiche WebLink
McPherson Engineering By: C.C. <br />Date: 8/12/22 <br />Gravity Loads: <br />DEMAND DECREASED BY 12.26% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 5.51% < 10% = OK! <br />Anchorage: <br />DEMAND OF 707.2LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />8/12/2022 4:21 PM <br />7 of 7 <br />©McPherson Engineering <br />2621 S Ramona Dr <br />08/29/22