Laserfiche WebLink
Solar Photovoltaic System <br />BENJAMIN FERENC <br />2634 OAKMONT AVE <br />SANTA ANA, CA 92705 <br />(626)367-3951 <br />ALL EQUIPMENT SHALL BE PROPERLY GROUNDED AND BONDED IN ACCORDANCE WITH ARTICLE 250. <br />ALL CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE OVERCURRENT DEVICES LOCATED <br />SO AS TO PROVIDE OVERCURRENT PROTECTION FROM ALL SOURCES 690.9 (A) <br />1. PV ARRAYS ARE PER SINGLE LINE. <br />2. PV ARRAY WIRING TO JUNCTION IS #10 AWG PV WIRE W/ FIELD INSTALLED MC CONNECTORS TO INTERFACE W/ MODULES. <br />3. CONTINUOUS PV WIRE FROM ARRAY TO INVERTER VIA CONDUIT. USE HEYCO CORD GRIPS TO TRANSITION FROM CONDUIT. <br />4. PV POWER SOURCE DISCONNECT (INTEGRATED) RATED AT 6 0 AMPS, 600Vdc, NEMA 3R RAINPROOF. <br />5. USE UFER GROUND ELECTRODE SYSTEM FROM INVERTER TO EXISTING MAIN SERVICE GROUND ELECTRODE PER N.E.C. <br />250.58. <br />6. WHEN REQUIRED, GROUND ELECTRODE CONDUCTOR FROM INVERTER TO GROUND ELECTRODE TO BE MINIMUM <br />PROTECTION OF BARE ARMOR SHEATHED CABLE FOR ALL CONDUCTOR SIZES. <br />7. ALL GROUND CONNECTED TO MAIN SERVICE GROUND IN MAIN SERVICE PANEL. <br />8. CONNECTORS SHALL BE MC-4. <br />9. INVERTER SHALL BE PER ATTACHED CUT SHEET. <br />10. AC DISCONNECT SHALL BE PER SINGLE LINE. <br />11. EQUIPMENT GROUNDING CONDUCTORS ON AC AND DC SIDE SIZED ACCORDING TO NEC 690. <br />12. POLE OF PV ARRAY REFERENCED TO GROUND AT THE INVERTER IN SINGLE LINE. <br />13. ALL CONDUCTORS SHALL BE 600V, 90C STANDARD COPPER. ALL CONDUCTORS IN CONDUIT SHALL BE THWN-2. <br />14. MAXIMUM DC VOLTAGE DROP SHALL BE 1.5% <br />15. ALL CONDUCTORS SHALL BE IN CONDUIT UNLESS OTHERWISE NOTED. <br />16. ALL WORK TO COMPLY WITH 2019 CALIFORNIA ELECTRIC CODE, 2019 CALIFORNIA BUILDING CODE <br />17. NOT USED. <br />18. EXACT CONDUIT RUN LOCATIONS SUBJECT TO CHANGE. <br />19. 3.0 PSF MAX (.5 PSF FROM RACKING, 2.5 PSF FROM MODULES) DEAD LOAD CONTRIBUTED FROM SOLAR ARRAY. <br />20. CONDUCTORS ON ROOF ARE TO BE 0.875" OFF OF THE ROOF SURFACE. <br />21. GEC TO BE CONNECTED TO EXISTING UFER. iF UFER IS NOT PRESENT THEN A NEW GROUND ROD WILL BE ADDED FOR <br />GROUNDNG PURPOSES. <br />22. PV WIRES UTILIZED IN SYSTEM ARE UL-4703 COMPLIANT. <br />23. ON RESIDENTIAL ROOF INSTALLATIONS ALL RACKING AND MODULES ARE UL2703 COMPLIANT <br />RACKING & MODULES ARE GROUNDED VIA A CONTINUOUS #6AWG COPPER CONDUCTOR CONNECTED W/ <br />IRONRIDGE INTEGRATED GROUNDING. <br />E1.1 <br />DATE: <br />ELECTRICAL NOTES, <br />LOAD CALCS <br />ELECTRICAL NOTES <br />4/27/2022 <br />GROUNDING: <br />IRONRIDGE INTEGRADED <br />CLAMP <br />MODEL: UFO <br />UL LISTED #2703 <br />"PV SYSTEM TO BE IRREVERSIBLY CONNECTED TO UFER, IF UFER IS NOT PRESENT IT IS THE RESPONSIBILITY OF THE <br />CONTRACTOR TO BRING GROUNDING UP TO CODE." <br />NEW GEN ENERGY <br />CORPORATION <br />P.O. Box 143, Placentia, <br />CA 92871-0143 <br />Phone: (909) 215-5291 <br />CSLB Lic# 949365 (C-10) <br />X:_____________________ <br />_ <br />2634 N Oakmont <br />Ave05/24/22