Laserfiche WebLink
I HEREBY CERTIFY THAT THE WORK PROPOSED TO BE DONE ON <br />THESE PLANS IS IN CONFORMANCE WITH ALL CODES AND <br />ORDINANCES OF THE AHJ OF CITY OF SANTA ANA AND FURTHER, IF <br />OMISSIONS OR ERRORS ARE DISCOVERED, I UNDERSTAND THAT THE <br />WORK PERFORMED WILL BE REQUIRED TO COMPLY WITH THE CODES <br />AND ORDINANCES OF THE AHJ OF CITY OF SANTA ANA PRIOR TO <br />FINAL BUILDING INSPECTION. <br /> SIGNATURE DATE STATE LICENSE NO. <br />PROJECT LOCATION: <br />FLUIDIC SYSTEMS PV <br />2655 S. ORANGE AVENUE <br />SANTA ANA, CA 92707 <br />NO. DATE DESCRIPTION STRUC. <br />CONTRACTOR <br />SOLAR ENERGY BUILDERS <br />65 ENTERPRISE 3RD FLR <br />ALISO VIEJO, CA 92656 <br />CSLB #378817 / B <br />(714)269-6995 <br />6/9/2022 INITIAL PLAN SET -- <br />ELECT. <br />A.L. <br />ARCH D (24" X 36") PRINT PAPER SIZE <br />DESCRIPTION: <br />SYSTEM INFO: <br />#378817 / B6/21/2022 <br />DRAWING INDEX <br />FLUIDIC SYSTEMS PV <br />2655 S. ORANGE AVENUE <br />SANTA ANA, CA 92707 <br />SYSTEM INFORMATION <br />SCOPE OF WORK <br />VICINITY MAP <br />CITY APPROVAL STAMPS <br />0 <br />TITLE PAGE <br />PARCEL MAP <br />PHOTOVOLTAIC GENERAL NOTES <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />· <br />· <br />· <br />· <br />· <br />· <br />· <br />” <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />ABBREVIATIONS <br />PROJECT DESCRIPTION <br />SITE SPECIFICATIONS <br />2 <br />1 <br />2 <br />3 <br />1 <br />540 <br />2 <br />***REVISED*** <br />Revisions to 101111818/20177231 <br />issued on 8/17/22. Approved by M. <br />Smith. <br />Revision issued on 9/28/22 <br />2655 S Orange Ave - <br />Revision 101111818 <br />& 2017723110/18/22