Laserfiche WebLink
I HEREBY CERTIFY THAT THE WORK PROPOSED TO BE DONE ON <br />THESE PLANS IS IN CONFORMANCE WITH ALL CODES AND <br />ORDINANCES OF THE AHJ OF CITY OF SANTA ANA AND FURTHER, IF <br />OMISSIONS OR ERRORS ARE DISCOVERED, I UNDERSTAND THAT THE <br />WORK PERFORMED WILL BE REQUIRED TO COMPLY WITH THE CODES <br />AND ORDINANCES OF THE AHJ OF CITY OF SANTA ANA PRIOR TO <br />FINAL BUILDING INSPECTION. <br /> SIGNATURE DATE STATE LICENSE NO. <br />PROJECT LOCATION: <br />FLUIDIC SYSTEMS PV <br />2655 S. ORANGE AVENUE <br />SANTA ANA, CA 92707 <br />NO. DATE DESCRIPTION STRUC. <br />1 <br />CONTRACTOR <br />SOLAR ENERGY BUILDERS <br />65 ENTERPRISE 3RD FLR <br />ALISO VIEJO, CA 92656 <br />CSLB #378817 / B <br />(714)269-6995 <br />6/9/2022 INITIAL PLAN SET -- <br />ELECT. <br />A.L. <br />ARCH D (24" X 36") PRINT PAPER SIZE <br />DESCRIPTION: <br />SYSTEM INFO: <br />#378817 / B6/21/2022 <br />PV 4 <br />GROUNDING <br />RAIL TO RAIL <br />BONDING #6 BARE <br />COPPER WIRE <br />INV <br />(IF USED) <br />MSP <br />CONTINUOUS <br />GROUND PER SLD <br />JBOX <br />GROUND <br />BUSHINGS <br />REQ. <br />MODULE <br />RAIL <br />SOLAR <br />METER <br />(IF REQ) <br />(A) <br />(1)BOND STRIP GROUNDS RAIL TO <br />RAIL SPLICES - STAR WASHERS USED <br />TO BOND RAIL TO BONDING STRIP <br />(2)SPLICE BAR, SELF-TAP SCREWS <br />JOIN RAILS. BONDING STRIPS USED <br />ON RAILS WITH GROUND LUGS. <br />(1) (2) <br />(3) <br />IF SPLICE BAR HAS INTEGRATED <br />GROUND, BONDING STRIP IS <br />NOT NECESSARY. <br />(3)WHERE NEITHER BONDING STRIP, INTEGRATED <br />GROUNDING SPLICE BAR, OR INTEGRATED <br />GROUNDING MIDCLAMP ARE USED, UL 2703 <br />APPROVED GROUND LUG WITH #6 BARE COPPER <br />SHALL BE USED TO GROUND SPLICED RAILS. <br />USE METHOD (3) IF (1) AND (2) NOT APPROVED <br />(1) <br />(C)RAIL SPLICE GROUNDING <br />(C) <br />#6 BARE <br />COPPER <br />RAIL <br />1 <br />RAIL <br />2 <br />EITHER METHOD 1-3 PER MANUFACTURERS INSTALL INSTRUCTIONS <br />CONDUIT <br />COMPRESSION <br />FITTING <br />LOCK NUT <br />GROUNDING <br />BUSHING <br />WITH LAY-IN LUG <br />ENCLOSURE <br />CONTINUOUS <br />GROUND <br />STRIP <br />INSULATION <br />CONDUIT GROUNDING DETAIL <br />EQUIPMENT GROUND <br />BUSHINGS REQ. FOR <br />SYSTEMS OVER 250V <br />MODULE TO RAIL GROUNDING <br />GROUNDING GBL-4DBT OR -4SS UL APPROVED GROUND LUG <br />TO BE INSTALLED PER INSTRUCTIONS TO MODULES. #6 BARE - <br />COPPER WIRE TO BE USED TO GROUND MODULES TO <br />MODULES TO RAIL PER INSTALL INSTRUCTIONS. <br />OR <br />(B)(A) <br />MODULE TO RAIL GROUNDING <br />APPROVED UL2703 COMPLAINT BURNDY WEEB CLIPS MAY BE <br />USED WHEN LOCAL JURISDICTION APPROVES. <br />WHEN WEEB CLIPS ARE NOT APPROVED, METHOD B SHALL <br />BE USED. <br />WEEB <br />CLIP <br />(B)MODULE TO RAIL <br />BONDING #6 BARE <br />COPPER WIRE <br />2655 S Orange <br />Ave - 101111463 & <br />2017695708/17/22