Text box
ID:
1
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: POLE BASE DETAIL
ID:
2
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: DUCT
ID:
3
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: BRANCH CIRCUIT
ID:
4
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: GRADE
ID:
5
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: 1 # 6 (G) IN 1/2" TO
ID:
6
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: GROUND ROD
ID:
7
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: 8'-0" 5/8" COPPER
ID:
8
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: GROUND ROD
ID:
9
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: 30"
ID:
10
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: BASE COVER
ID:
11
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: HAND HOLE
ID:
12
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: POLE
ID:
13
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: POLE BASE GROUNDING DETAIL
ID:
14
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: BOND #6 AWG GROUNDING CONDUCTOR TO POLE, BOND BRANCH CIRCUIT GROUNDING CONDUCTOR TO SAME BOND LUGS. BOND #6 AWG TO REBAR IN POLE BASE.
ID:
15
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: SM
ID:
16
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: GENERAL NOTES & SCHEDULES
ID:
17
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: SHEET NO.
ID:
18
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: 07/13/2020
ID:
19
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: %%USCOPE OF WORK:
ID:
20
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: REPLACE EXISTING H.I.D., FLUORESCENT, COMPACT FLUORESCENT & INCANDESCENT LIGHTING WITH NEW L.E.D. FIXTURES. INPUT WATTAGE FOR NEW L.E.D. FIXTURES WILL NOT EXCEED THE WATTAGE OF THE EXISTING FIXTURES THAT THEY ARE REPLACING. WHERE NEW FIXTURES ARE BEING ADDED TO AN EXISTING CIRCUIT, THE TOTAL WATTAGE FOR THE EXISTING CIRCUIT WILL NOT EXCEED CURRENT VALUE SINCE ALL EXISTING FIXTURES ON THE CIRCUIT WILL BE REPLACED WITH NEW L.E.D. FIXTURES OF LOWER VALUE.
ID:
21
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE FOLLOWING CODES AND ALL ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE FOLLOWING CODES AND ALL OTHER STATE AND LOCAL CODES AND ORDINANCES: 1.1. 2019 CBC/2015 IBC 2019 CBC/2015 IBC 1.2. 2019 CFC/2015 IFC 2019 CFC/2015 IFC 1.3. 2019 CEC/2014 NEC 2019 CEC/2014 NEC 1.4. 2019 CMC/2015 UMC 2019 CMC/2015 UMC 1.5. 2019 CPC/2015 UPC 2019 CPC/2015 UPC 1.6. 2019 GREEN BUILDING STANDARDS CODE 2019 GREEN BUILDING STANDARDS CODE 1.7. 2019 CALIFORNIA ENERGY CODE 2019 CALIFORNIA ENERGY CODE 2. CONTRACTOR SHALL COORDINATE WITH THE EQUIPMENT PROVIDED BY OTHERS TRADES CONTRACTOR SHALL COORDINATE WITH THE EQUIPMENT PROVIDED BY OTHERS TRADES PRIOR TO THE INSTALLATION OF ANY WORK TO ASSURE THAT THE CONDUIT, FEEDERS, BREAKERS, ETC. MATCH THE NAMEPLATE DATA FOR EQUIPMENT BEING FURNISHED FOR THIS PROJECT. WHERE A CONFLICT EXISTS BETWEEN NAMEPLATE DATA AND SIZES SHOWN ON THE ELECTRICAL DRAWINGS, CONTRACTOR SHALL NOTIFY THE ENGINEER FOR RESOLUTION PRIOR TO ANY INSTALLATION. 3. CONTRACTOR SHALL COORDINATE THE SIZES OF ALL ELECTRICAL EQUIPMENT BEING CONTRACTOR SHALL COORDINATE THE SIZES OF ALL ELECTRICAL EQUIPMENT BEING PROVIDED PRIOR TO ANY INSTALLATION AND LAYOUT EQUIPMENT TO SCALE TO ASSURE THAT EQUIPMENT AS SHOWN ON DRAWINGS WILL FIT IN DESIGNATED SPACES. 4. CONTRACTOR TO SUPPLY T24 CERTIFICATION LETTER AT COMPLETION OF CONSTRUCTION.CONTRACTOR TO SUPPLY T24 CERTIFICATION LETTER AT COMPLETION OF CONSTRUCTION.
ID:
22
Creator:
Import Agent
Created:
5/30/2025 4:42 PM
Modified:
5/30/2025 9:06 AM
Text:
AutoCAD SHX Text: %%UGENERAL NOTES: