My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
309 1%2 N Eastside Ave - Plan
PBA
>
Building
>
ProjectDox
>
E
>
Eastside Ave
>
309 1/2 N Eastside Ave
>
309 1%2 N Eastside Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 1:42:28 PM
Creation date
5/30/2025 8:00:55 AM
Metadata
Fields
Template:
Plan
Permit Number
20175980
101110182
Full Address
309 1/2 N Eastside Ave
Text box
ID:
1
Creator:
Import Agent
Created:
5/30/2025 10:01 AM
Modified:
5/30/2025 9:09 AM
Text:
http://www.evengineersnet.com
ID:
2
Creator:
Import Agent
Created:
5/30/2025 10:01 AM
Modified:
5/30/2025 9:09 AM
Text:
http://www.evengineersnet.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4/7/2022 <br />RE: Structural Certification for Installation of Residential Solar <br />Code 2019 California Building Code (ASCE 7-16) <br />Risk category II Wind Load (component and Cladding) <br />Roof Dead Load Dr 10 psf V 95 mph <br />PV Dead Load DPV 3 psf Exposure C <br />Roof Live Load Lr 20 psf <br />Ground Snow S 0 psf <br />If you have any questions on the above, please do not hesitate to call. <br />Sincerely, <br />Eugene Munyanziza, P.E. <br />EV Engineering, LLC <br />projects@evengineersnet.com <br />http://www.evengineersnet.com <br />Exp: 06/30/2022 <br /> SERGIO ROMERO:309 1/2 EASTSIDE AVENUE, SANTA ANA, CA 92701 <br />Attn: To Whom It May Concern <br />This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the <br />PV system to existing roof framing. From the field observation report, the roof is made of Composition shingle <br />roofing over roof plywood supported by 2X4 Rafters at 16 inches. The slope of the roof was approximated to be <br />14 degrees and the allowable maximum rafter span is 6 feet between supports. <br />After review of the field observation data and based on our structural capacity calculation, the existing roof <br />framing has been determined to be adequate to support the imposed loads without structural upgrades. <br />Contractor shall verify that existing framing is consistent with the described above before install. Should they <br />find any discrepancies, a written approval from SEOR is mandatory before proceeding with install. Capacity <br />calculations were done in accordance with applicable building codes. <br />Design Criteria <br />projects@evengineersnet.com <br />http://www.evengineersnet.com <br />309 1%2 N <br />Eastside Avenue08/23/22
The URL can be used to link to this page
Your browser does not support the video tag.