My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3314 S Lowell St - Plan
PBA
>
Building
>
ProjectDox
>
L
>
Lowell St
>
3314 S Lowell St
>
3314 S Lowell St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 4:53:33 PM
Creation date
5/30/2025 8:00:55 AM
Metadata
Fields
Template:
Plan
Permit Number
20176783
20177757
101111215
Full Address
3314 S Lowell St
Document Relationships
101111215 - Permit
(Permit - Plan)
Path:
\Building\Permits\L\Lowell St\3314 S Lowell St
20176783 - Permit
(Permit - Plan)
Path:
\Building\Permits\L\Lowell St\3314 S Lowell St
20177757 - Permit
(Permit - Plan)
Path:
\Building\Permits\L\Lowell St\3314 S Lowell St
Text box
ID:
1
Creator:
Import Agent
Created:
5/30/2025 4:41 PM
Modified:
5/30/2025 9:13 AM
Text:
http://www.loydwmartin.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Structural Calculations for a Roof Mounted Solar Photovoltaic System for: <br />Dave Hardy Residence <br />3314 S. Lowell St., <br />Santa Ana, CA 92707 <br />Applicable Codes: <br />2019 California Building Code, 2019 California Electric Code, <br />2019 California Mechanical Code, American Society of Civil Engineers <br />Standard ASCE 7-16 Minimum Design Loads for Buildings and Other <br />Structures, American Wood Council 2018 National Design Specification <br />for Wood Construction, Local Municipal Code, and all other codes which <br />are adopted by reference or enacted by law. <br />Assumed Design Parameters: <br />The existing structure has been built under a building permit and is in its <br />original condition. The existing roof structure is capable of its code <br />required live load and the ability of the roof structure to support live loads <br />has not been substantially reduced by the age of the structure, termites or <br />mold, or unauthorized modifications to the existing structure. Solar Energy <br />Contractor shall make an inspection of the existing roof framing system <br />prior to installation of the roof mounted solar energy system to verify that <br />the existing roof is capable of supporting minimum roof live loads. <br />Assumed Design Parameters: <br />All 2x members are grade Douglas Fir #2 or better <br />All 4X members are grade Douglas Fir #1 or better <br />All Roof Connectors are Simpson Strong-Tie or Equal <br />All Concrete Foundations are f'c = 2500 psi or stronger <br />Original Structure was built to the Type-V Wood Framed Standards <br />of the Applicable Building Code at the time of Construction. <br />Sht # 1 of 7 <br />2021-166 Solar Journey Teresa Barajas Residence Date: January 15, 2021 <br /> 9924 Universal Boulevard #224- 406 Orlando, FL 32819 Tel:1.310.464.1804 <br /> Email: loydwmartin@gmail.com www.loydwmartin.com <br />Loyd W. Martin Professional Engineer, Inc. <br />2021-2692 Better Earth Rodrigo Zuniga Residence Date: July 13, 2021 <br />Exp. 3-31-19 <br />No. C58724 <br />NITRAMW.DYO <br />REGISTEREDPROFESSIONALENGINEER <br />C <br />V <br />L <br />FOETATS <br />ALIFORNIAICIL <br />-23 <br />2022-2407 Ilum Solar Dave Hardy Residence Date: June 7, 2022 <br />3314 S. Lowell St <br />07/29/22
The URL can be used to link to this page
Your browser does not support the video tag.