My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3702 S Alder St - Plan
PBA
>
Building
>
ProjectDox
>
A
>
Alder St
>
3702 S Alder St
>
3702 S Alder St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 1:43:23 PM
Creation date
5/30/2025 8:00:55 AM
Metadata
Fields
Template:
Plan
Permit Number
20174689
101108485
Full Address
3702 S Alder St
Document Relationships
101108485 - Permit
(Permit - Plan)
Path:
\Building\Permits\A\Alder St\3702 S Alder St
20174689 - Permit
(Permit - Plan)
Path:
\Building\Permits\A\Alder St\3702 S Alder St
Text box
ID:
1
Creator:
Import Agent
Created:
5/30/2025 10:01 AM
Modified:
5/30/2025 9:17 AM
Text:
http://www.vectorse.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VSE Project Number: U2880.1484.211 <br />Praxedis, Candido Prisca Residence <br />10/25/2021 <br />The solar arraywill be flush-mounted (no more than 10" above the roof surface) and parallel to the roof surface. Thus, we <br />conclude that anyadditional wind loadingon the structure related to the addition of the proposed solar arrayis negligible. <br />The attached calculations verifythe capacityof the connections of the solar arrayto the existingroof against wind (uplift), <br />the governing load case. Regarding seismic loads, we conclude that any additional forces will be small. Conservatively <br />neglectingthe weight of existingwall materials, the installation of the solar panels represents an increase in the total weight <br />(and resulting seismic load) of 4.3%. Because the increase in lateral forces is less than 10%, this addition meets the <br />requirements of the exception in Section 503.4 of the 2019 CEBC. Thus the existing lateral force resisting system is <br />permitted to remain unaltered. <br />Limitations <br />Installation of the solar panels must be performed in accordance with manufacturer recommendations. All workperformed <br />must be in accordance with accepted industry-wide methods and applicable safety standards. The contractor must notify <br />Vector Structural Engineering, LLC should anydamage, deterioration or discrepancies between the as-built condition of the <br />structure and the condition described in this letter be found. Connections to existingroof framingmust be staggered, except <br />at arrayends, so as not to overload anyexistingstructural member. The use of solar panel support span tables provided by <br />others is allowed onlywhere the buildingtype, site conditions, site-specific design parameters, and solar panel configuration <br />match the description of the span tables. The design of the solar panel racking(mounts, rails, etc.) and electrical engineering <br />is the responsibilityof others. Waterproofingaround the roof penetrations is the responsibilityof others. Vector Structural <br />Engineering assumes no responsibility for improper installation of the solar array. <br />VECTOR STRUCTURAL ENGINEERING, LLC <br />10/25/2021 <br />_______________________________________________________ <br />Jacob Proctor, P.E. <br />CA License: 70567 - Expires: 06/30/2023 <br />Project Engineer <br />Enclosures <br />JSP/amo <br />10/25/2021 <br />651 W. Galena Park Blvd., Ste. 101 / Draper, UT 84020 / T (801) 990-1775 / F (801) 990-1776 / www.vectorse.com <br />3702 S Alder St <br />11/05/21
The URL can be used to link to this page
Your browser does not support the video tag.