Laserfiche WebLink
0 <br />PV SYSTEM <br />AS INDICATED <br />SEPTEMBER 30, 2021 <br />NAM NGUYEN <br />4410 CELESTE ST, <br />SANTA ANA, CA 92703 <br />CONTRACTOR <br />True Power Solar <br />Address: <br />201 Clark Ave <br />Pomona, CA 91767 <br />Phone Number: <br />(714)676-8888 <br />Lic type: C-46 <br />Lic# 970591 <br />Drawn By : Narek A. <br />COVER PAGE <br />1. ALL ELECTRICAL MATERIALS SHALL BE NEW AND LISTED BY RECOGNIZED ELECTRICAL TESTING LABORATORY CUSTOM MADE EQUIPMENT SHALL HAVE <br />COMPLETE TEST DATA SUBMITTED BY THE MANUFACTURER ATTESTING TO ITS SAFETY <br />2. OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED <br />3. ALL METALLIC EQUIPMENT SHALL BE GROUNDED <br />4. ALL SPECIFIC WIRING IS BASED ON THE USE OF COPPER. <br />5.CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS PRIOR TO INSTALLATION AND SHALL COORDINATE ALL INSPECTIONS, TESTING <br />COMMISSIONING AND ACCEPTANCE WITH THE CLIENT, UTILITY CO. AND CITY INSPECTORS AS NEEDED. <br />6.THE ELECTRICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF SERVICE POINTS AND SERVICE SIZES WITH THE SERVING UTILITY COMPANY <br />AND COMPLY WITH ALL UTILITY COMPANIES REQUIREMENTS. IF THE SOLAR BACK FED BREAKER IS OVER THE BUSS SIZE 20% LIMIT, CONTRACTOR SHALL <br />INCLUDE THE COST TO REPLACE MAIN BREAKER OR ENLARGE MAIN CAPACITY. <br />7. DRAWINGS ARE DIAGRAMMATIC ONLY, ROUTING OF RACEWAYS SHALL BE OPTION OF THE CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE <br />COORDINATED WITH OTHER TRADES. <br />8. IF THE ROOF MATERIAL OR ROOF STRUCTURE NOT ADEQUATE FOR PV INSTALLATION, CALL ENGINEER PRIOR TO INSTALL. THE CONTRACTOR IS <br />RESPONSIBLE TO VERIFY THAT THE ROOF IS CAPABLE OF WITHSTANDING THE EXTRA WEIGHT. <br />9. IF THE DISTANCES FOR CABLE RUNS ARE DIFFERENT THAN SHOWN, THE CONTRACTOR SHALL NOTIFY THE ELECTRICAL ENGINEER TO VALIDATE THE <br />WIRE SIZE. FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS APPROPRIATE. <br />10. WHENEVER A DISCREPANCY IN QUALITY OF EQUIPMENT ARISES ON THE DRAWING OR SPECIFICATIONS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />PROVIDING AND INSTALLING ALL MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN THE <br />SPECIFICATIONS TO ENSURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM REQUIRED BY THE ARCHITECT/ENGINEERS. <br />11. ALL BROCHURES, OPERATION MANUALS, CATALOGS, SHOP DRAWINGS, ETC. SHALL BE HANDED OVER TO OWNER'S REPRESENTATIVE AT THE <br />COMPLETION OF WORK <br />OWNER <br />SCOPE <br />PROJECT <br />ADDRESS <br />PROJECT DATA GENERAL NOTES VICINITY MAP <br />SHEET INDEX <br />0 COVER PAGE <br />PHOTOVOLTAIC NOTES <br />SATELLITE VIEW <br />BUILDING <br />INFORMATION: <br />SINGLE LINE DIAGRAM <br />CODE REQUIRED SIGNAGE <br />3 <br />4 <br />ATTACHMENT LAYOUT5 <br />6 <br />7 <br />INVERTER DATA SHEET <br />D1 MODULE DATA SHEET <br />RACKING DATA SHEET <br />RACKING CERTIFICATE <br />ATTACHMENT DATA SHEET <br />ELECTRICAL <br />INFORMATION <br />MAIN SERVICE PANEL <br />BUSBAR RATING <br />MAIN SERVICE <br />BREAKER RATING <br />ROOF PLAN <br />MODULE MAP <br />RACKING <br />INFORMATION <br />Main Service Panel <br />Solar Module <br />Micro Inverter / <br />Optimizer <br />EMT / FMT / PVC <br />/ RMC type conduit/ <br />Romex NM Cable/ <br />FNMT (Fluid non-metalic tube) <br />36'' SetbackInverter <br />Utility Meter <br />Production Meter <br />PV Load Center <br />IQ Combiner Box <br />Junction Box <br />Sunpower PV Supervisor <br />18'' Setback <br />EV Outlet <br />CONSTRUCTION TYPE: V-B <br />ROOF <br />TYPE <br />AHJ <br />APN <br />LOT AREA <br />LIVING AREA <br />MSP <br />UM <br />PM <br />INV <br />PV <br />PVS6 <br />IQ <br />J/B <br />EV <br />NAM NGUYEN <br />46 HANWHA 430W <br />Q.PEAK DUO L-G8 430 <br />46 ENPHASE <br />IQ7PLUS-72-2-US <br />4410 CELESTE ST, <br />SANTA ANA, CA 92703 <br />AC DisconnectACD <br />SSP Service Sub Panel <br />COMPOSITION SHINGLE <br />4,044 SQFT <br />19832426 <br />CITY OF SANTA ANA <br />WIRE SIZE CALCULATIONS <br />INVERTER MAP <br />D2 <br />D3 <br />D4 <br />D5 <br />D6 <br />ROOF MOUNT INSTALLATION OF <br /> DC PHOTOVOLTAIC SYSTEM <br />19.78 KW DC <br />19.78 KW <br />18.02 KW AC <br />EXISTING <br />1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL BE TESTED, LISTED AND IDENTIFIED UL 1703. <br />2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL VENTS <br />3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED. <br />4. SOLAR INVERTER MUST HAVE A MANUFACTURE INSTALLED DISCONNECTING MEANS THAT PREVENTS PARALLEL FEEDING UTILITY LINES DURING POWER <br />OUTAGE. <br />5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING <br />ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS. <br />6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE. <br />7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT CIRCUITS OVER 150V TO GROUND SHALL NOT BE <br />ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE ENERGIZED. <br />8 .INVERTER IS EQUIPPED W/ INTEGRATED GFDI, THUS PROVIDING GROUND FAULT PROTECTION <br />9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG RATED <br />10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY OR APPROVED BY THE DEPARTMENT. <br />11. CONDUITS SHOULD BE PAINTED TO MATCH EXISTING ROOF AND WALL COLORS <br />12. THE OUTPUT OF A UTILITY INTERACTIVE-INVERTER SHALL BE PERMITTED TO BE CONNECTED TO THE SUPPLY SIDE OF THE SERVICE DISCONNECTING <br />MEANS AS PER 230.82(6) <br />13. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED TO PERFORM THE MULTIPLE FUNCTIONS OF DC GROUNDING, AC GROUNDING <br />AND BONDING BETWEEN AC AND DC SYSTEMS SIZED AS PER SEC 250.122 <br />14. EQUIPMENT GROUND CONDUCTOR REQUIRED IN RACEWAYS SIZED PER CEC 250-122. <br />15. PER ART 250.92. NON-CURRENT CARRYING METAL PARTS OF EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER. BOND BOTH ENDS OF RACEWAYS <br />ALL OTHER ORDINANCE ADOPTED BY THE <br />LOCAL GOVERNING AGENCIES <br />THE INSTALLATION OF SOLAR ARRAYS AND <br />PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY <br />WITH THE FOLLOWING CODES: <br />2019 CALIFORNIA ELECTRICAL CODE <br />2019 CALIFORNIA BUILDING CODE <br />2019 CALIFORNIA GREEN BUILDING STANDARDS <br />CODE <br />2019 CALIFORNIA ENERGY CODE <br />2019 CALIFORNIA MECHANICAL CODE <br />2019 CALIFORNIA PLUMBING CODE <br />2019 INTERNATIONAL RESIDENTIAL CODE <br />2019 INTERNATIONAL FIRE CODE <br />1 <br />2 0.64 ACRES <br />LG Chem Battery BackupLGB <br />Solar Edge Auto TransformerAT <br />Solar Edge Meter EnclosureSEM <br />Distribution PanelDP <br />Rapid Shutdown Controller RSC <br />Rapid Shutdown Box RSB <br />Itron MeterIM <br />UNIT INDEX <br />CODE REFERENCES <br />SOLAR WAREHOUSE RACKING <br />RAFTERS 2"X6" @ 16" O.C <br />OCCUPANCY: R <br />ONE STORY BUILDING <br />200A <br />225A <br />Coordinates: 33.752833, -117.928242 <br />IQ COMBINER BOX DATA SHEET <br />Bldg permit #101108385 <br />Elect permit #20174618 <br />Issued on 12/23/2021 <br />4410 W Celeste St <br />12/23/21