Laserfiche WebLink
9/22/2021 <br />2. <br />8 <br />0 <br />0 <br />DE <br /> <br />L <br />A <br /> <br />C <br />R <br />U <br />Z <br />, <br /> <br />E <br />L <br />A <br />D <br />I <br />O <br />47 <br />0 <br />1 <br /> <br />W <br />E <br />S <br />T <br /> <br />L <br />U <br />C <br />K <br />Y <br /> <br />W <br />A <br />Y <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />-- <br />- <br />Paper Size <br />Scale <br />Drawn by <br />Title <br />Project Number <br />Sheet <br />Eq <br />u <br />i <br />s <br />o <br />l <br />a <br />r <br />16 <br />5 <br />3 <br />0 <br /> <br />V <br />e <br />n <br />t <br />u <br />r <br />a <br /> <br />B <br />l <br />v <br />d <br /> <br />S <br />u <br />i <br />t <br />e <br /> <br />1 <br />0 <br />4 <br />En <br />c <br />i <br />n <br />o <br />, <br /> <br />C <br />A <br /> <br />9 <br />1 <br />4 <br />3 <br />6 <br />81 <br />8 <br />. <br />7 <br />8 <br />4 <br />. <br />2 <br />3 <br />0 <br />0 <br />CS <br />L <br />B <br />: <br /> <br />G <br />e <br />n <br />- <br />B <br />; <br /> <br />1 <br />0 <br />0 <br />6 <br />5 <br />3 <br />5 <br />SI <br />G <br />N <br />A <br />T <br />U <br />R <br />E <br />: <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />PROJECT DESCRIPTION: <br />SCOPE OF WORK: <br />Roof-mounted , transformerless <br />photovoltaic system and new <br />electrical components, including <br />modules, mounting hardware, <br />inverter, load center, disconnects and <br />metering devices as required. <br />PROPERTY: <br />SINGLE FAMILY RESIDENTIAL <br />Zoning: UNKNOWN <br />Bldg Square Feet: 1434 <br />Year built: 1950 <br />APN: 10811414 <br />UTILITY PROVIDER: <br />SCE <br />PV SYSTEM: <br /> 2.800 kW DC <br />MODULE TYPE: <br />( 7 ) JINKO: JKM400M-72HL-V <br />PTC Rating: 362.9 W <br />PV INVERTER: <br />(7 ) Enphase: IQ7A-72-2-US <br />CEC Efficiency Rating: 97.0 % <br />ARRAY PLACEMENT: <br />FLUSH MOUNTED <br />ROOF TYPES: <br />COMP SHINGLE <br />FRAMING TYPE: <br />- 2x FRAMING , 24" on center. <br />SYSTEM WEIGHT: <br />389.90 LBS <br />PV ARRAY AREA: <br />151.31 ft². <br />PSF PRESSURE: <br />2.58 lbs/ft² <br />INTERCONNECTION METHOD: <br />Interconnect via LOAD SIDE . <br />WIND SPEED: <br />MPH <br />VICINITY MAP1 <br />T-01 NTS <br />SHEET INDEX <br />T-01 TITLE SHEET <br />PV.01 SITE PLAN <br />PV.02 ROOF PLAN <br />PV.03 SINGLE LINE DIAGRAM/ELECTRICAL <br />PV.04 WARNING LABELS & SIGNAGE <br />PV.05 RACKING AND ATTACHMENTS <br />PV.06 PV MODULE DATA SHEET <br />PV.07 INVERTER DATA SHEET <br />PV.08 UL <br />PV.09 GROUNDING <br />GENERAL NOTES: <br />· All electrical equipment shall be labeled, listed, or certified by a Nationally Recognized Testing Laboratory accredited by the United <br />States Occupational Safety Health Administration. <br />· Local Utility provider shall be notified prior to use and activation of any solar photovoltaic installation. <br />· The System will not be interconnected until approval from the local jurisdiction and utility is obtained. <br />· A ladder shall be in place for the inspection in compliance with OSHA Regulations. <br />· Proper access and working clearance shall be provided as per section 110.26 NEC. <br />· PV equipment, systems, and all associated wiring and interconnections shall only be installed by qualified persons. <br />· All outdoor equipment shall be minimum NEMA 3R rated, including all roof mounted transition boxes and switches. <br />· All exterior conduit, fittings, and boxes shall be rain tight and approved for use in wet locations. <br />· All conductors exposed to weather shall be listed and identified for use in direct sunlight. <br />· The module conductors must be type USE-2 or listed for Photovoltaic (PV) Wire (UL 4703 & 854 Listed). <br />· All conductors must be copper and 90° Rated. <br />· All equipment shall be properly grounded and bonded in accordance with NEC Article 250. <br />· All applicable PV equipment listed and compliant with UL2703 and UL1703. <br />· All NEC required warning signs, markings, and labels shall be posted on equipment and disconnects. <br />· All circuits connected to more than one source shall have over current devices located so as to provide over current protections from <br />all sources. <br />· The PV Power source circuit breaker shall be located at the opposite end of the main service disconnect. <br />· Flexible, fine-stranded cables shall be terminated only with terminals, lugs, devices, or connectors that are identified and listed for such <br />use. <br />· Connectors shall be of latching or locking type. Connectors that are readily accessible and operating over 300 volts shall require a tool <br />to open and shall me marked "Do Not Disconnect under load". <br />· The roof mounted photovoltaic modules, panels, or solar photovoltaic roll roofing material shall have the same or better listed <br />fire-resistance rating than the building roof-covering material. <br />·Smoke alarms and carbon monoxide alarms are required to be retrofitted onto the existing dwelling as per the 2012 IRC. These <br />smoke alarms are required to be in all bedrooms, outside each bedroom, and a least one on each floor of the house. <br />· Smoke alarms and carbon monoxide alarms are to be verified and inspected by the IHE inspector in the field. <br />AERIAL VIEW2 <br />T-01 NTS <br />CLIENT INFORMATION <br />HOMEOWNER DE LA CRUZ, ELADIO <br />ADDRESS <br />4701 WEST LUCKY WAY, <br />SANTA ANA, CA 92704 <br />PHONE --- <br />CONTRACTOR INFORMATION <br />CONTRACTOR Equisolar, Inc <br />ADDRESS <br />16530 Ventura Blvd Suite 104 <br />Encino, CA 91436 <br />PHONE 818.784.2300 <br />CSLB 1006535; Gen-B <br />CODE REFERENCE: <br />· 2019 CEC Adopts 2017 NEC <br />· 2019 CRC Adopts 2018 IRC <br />· 2019 CMC Adopts 2018 UMC <br />· 2019 CPC Adopts 2018 UPC <br />· 2019 CBC Adopts 2018 IBC <br />· 2019 CFC Adopts 2018 IFC <br />· 2019 Edition of the California <br /> Energy Efficiency Standards <br />· Underwriters Laboratories (UL) Standards <br />· OSHA Guidelines <br />· All AHJ Requirements <br />Vector Structural Engineering has reviewed the existing <br />structure with loading from the solar array and screw <br />connections to the existing framing. The design of the <br />racking system, racking connections, and all other <br />structural is by others. Mechanical, architectural, and all <br />other nonstructural aspects of the design are by others. <br />Electrical is by others, unless stamped by Dean Levorsen. <br />10/04/2021 <br />VSE Project Number: U2880-1439-211 <br />95 <br />Permit # 101108456 & 20174670 <br />issued 11/02/2021 <br />4701 W Lucky Way <br />11/02/21