My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
513 S Everglade Ave - Plan
PBA
>
Building
>
ProjectDox
>
E
>
Everglade St
>
513 S Everglade St
>
513 S Everglade Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 1:43:49 PM
Creation date
5/30/2025 8:01:00 AM
Metadata
Fields
Template:
Plan
Permit Number
20177987
101112797
Full Address
513 S Everglade St
Document Relationships
101112797 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Everglade St\513 S Everglade St
20177987 - Permit
(Permit - Plan)
Path:
\Building\Permits\E\Everglade St\513 S Everglade St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A <br />MS <br />P <br />AC <br />CB <br />A <br />A <br />A <br />A <br />A <br />A <br />A <br />VICINITY MAP <br />ADDRESS:513 S EVERGLADE ST, SANTA <br />ANA, CA 92704 <br />33.740912, -117.904046 <br />APN:109-78-142 <br />CUSTOMER INFORMATION <br />NAME:CECILIA TORRES <br />DATE:9/23/2022 <br />SCALE:AS NOTED REV:A <br />AHJ:CA - CITY OF SANTA ANA <br />UTILITY:SCE <br />PRN NUMBER:MAS-64170 <br />DRAFTED BY: <br />M.SAILESH <br />QC'ED BY:H.RAJ <br />PAPER SIZE:17"X11" <br />SOLARPLEX LLC <br />Dba MARAVILLA CONSTRUCTION <br /> License#:1056065 <br /> 5902 FIRESTONE BLVD <br /> SOUTH GATE, CA 90280 <br /> TEL:(562) 806-6000 <br /> FAX:(562) 806-4006 <br />APPLICABLE CODES <br />COVER PAGE <br />T-01 <br />SCALE:1"=20'-0" <br />1.MODULES ARE LISTED UNDER UL 61730 AND <br />CONFORM TO THE STANDARDS. <br />2.INVERTERS ARE LISTED UNDER UL 1741 AND <br />CONFORM TO THE STANDARDS. <br />3.DRAWINGS ARE DIAGRAMMATIC, INDICATING <br />GENERAL ARRANGEMENT OF THE PV SYSTEM AND <br />THE ACTUAL SITE CONDITION MIGHT VARY. <br />4.WORKING CLEARANCES AROUND THE NEW PV <br />ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN <br />ACCORDANCE WITH CEC 110.26. <br />5.ALL GROUND WIRING CONNECTED TO THE MAIN <br />SERVICE GROUNDING IN MAIN SERVICE PANEL/ <br />SERVICE EQUIPMENT. <br />6.ALL CONDUCTORS SHALL BE 600V, 75°C <br />STANDARD COPPER UNLESS OTHERWISE NOTED. <br />7.WHEN REQUIRED, A LADDER SHALL BE IN PLACE <br />FOR INSPECTION IN COMPLIANCE WITH OSHA <br />REGULATIONS. <br />8.THE SYSTEM WILL NOT BE INTERCONNECTED BY <br />THE CONTRACTOR UNTIL APPROVAL FROM THE <br />LOCAL JURISDICTION AND/OR THE UTILITY. <br />9.ROOF ACCESS POINT SHALL BE LOCATED IN <br />AREAS THAT DO NOT REQUIRE THE PLACEMENT <br />OF GROUND LADDERS OVER OPENINGS SUCH AS <br />WINDOWS OR DOORS, AND LOCATED AT STRONG <br />POINTS OF BUILDING CONSTRUCTION WHERE THE <br />ACCESS POINT DOES NOT CONFLICT WITH <br />OVERHEAD OBSTRUCTIONS SUCH AS TREES, <br />WIRES OR SIGNS. <br />10.PV ARRAY COMBINER/JUNCTION BOX <br />PROVIDES TRANSITION FROM ARRAY WIRING TO <br />CONDUIT WIRING <br />GENERAL NOTES <br />SHEET CATALOG <br />INDEX NO. DESCRIPTION <br />T-01 COVER PAGE <br />S-01 MOUNTING DETAIL <br />S-02 STRUCTURAL DETAIL <br />E-01 SINGLE LINE DIAGRAM <br />PL-01 WARNING PLACARDS <br />SS SPEC SHEET(S) <br />SITE PLAN LAYOUT <br />CECILIA TORRES - 3.200kW DC, 2.320kW AC, CEC AC RATING:2.883kW <br />ENGINEERING SCOPE OF WORK <br />1.ILLUMINE INDUSTRIES INC. HAS ONLY PROVIDED DRAFTING SERVICES FOR THE PERMIT DRAWINGS. NO ACTUAL ENGINEERING WORK, ENGINEERING REVIEW OR ENGINEERING <br />APPROVAL HAS BEEN CONDUCTED BY ILLUMINE INDUSTRIES INC UNLESS NOTED OTHERWISE. <br />2.WHEN A PROFESSIONAL ENGINEER APPROVES AND SEALS THE DESIGN FOR COMPONENTS OF THEIR RESPECTIVE DISCIPLINE (STRUCTURAL/ELECTRICAL) SHOWN ON THESE PERMIT <br />DRAWINGS, HE/SHE: <br />a. TAKES FULL DIRECT CONTROL OF THE ENGINEERED DESIGN <br />b.IS GIVEN ACCESS TO PERSONALLY SUPERVISE AND RECTIFY ANY ASPECT OF THE ENGINEERED DESIGN <br />c.HAS FULLY ACCEPTED RESPONSIBILITY FOR THE ENGINEERED DESIGN <br />GENERAL SYSTEM INFORMATION: <br />SYSTEM SIZE: <br />3200W DC, 2320W AC,CEC RATING: 2883W <br />MODULES: <br />(8)HANWHA Q CELL QPEAK DUO BLK ML-G10 <br />400W <br />INVERTER: <br />(8)ENPAHSE IQ8PLUS-72-2-US(240V)(SI-1) <br />BRANCH DETAILS: <br />1X8 ENPHASE BRANCH <br />SCOPE OF WORK <br />(E)UTILITY METER WITH <br />(N) MAIN SERVICE PANEL <br />CONDUIT RUN <br />PHOTOVOLTAIC ARRAY ON THE ROOF <br />STRING CONFIGURATION <br />BRANCH DETAILS <br />A 8 MODULES <br />(N) AC DISCONNECT <br />105' <br />65' <br />105' <br />5' <br />15' <br />7' <br />17' <br />(N) ENPHASE COMBINER 4 <br />DETACHED STRUCTURE <br />PROPERTY LINE <br />GATE <br />GATE <br />DRIVE WAY <br /> S <br /> <br />E <br />V <br />E <br />R <br />G <br />L <br />A <br />D <br />E <br /> <br />S <br />T <br />·ELECTRIC CODE:CEC 2019 <br />·FIRE CODE:CFC 2019 <br />·BUILDING CODE:CBC 2019 <br />·RESIDENTIAL CODE:CRC 2019 <br />3' FIRE SETBACK <br />1'-6" FIRE SETBACK <br />Structural <br />Only <br />BLDG# 101112797 ISS. 12/01/2022 <br />ELEC# 20177987 ISS. 12/01/2022 <br /> <br />The scope of the plans is for the installation of the solar photovoltaic system only and the <br />approval is subject to compliance with all applicable city and state codes and regulations <br />regarding construction. The approval of the plans does not constitute any certification of the <br />accuracy, completeness, or building permit status of the existing buildings and structures as <br />shown. <br />513 S Everglade Ave <br />12/20/22
The URL can be used to link to this page
Your browser does not support the video tag.