My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
615 W Park Ln - Plan
PBA
>
Building
>
ProjectDox
>
P
>
Park Ln
>
615 W Park Ln
>
615 W Park Ln - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 4:53:32 PM
Creation date
5/30/2025 8:01:04 AM
Metadata
Fields
Template:
Plan
Permit Number
20177786
101112554
101114458
Full Address
615 W Park Ln
Document Relationships
101112554 - Permit
(Permit - Plan)
Path:
\Building\Permits\P\Park Ln\615 W Park Ln
101114458 - Permit
(Permit - Plan)
Path:
\Building\Permits\P\Park Ln\615 W Park Ln
20177786 - Permit
(Permit - Plan)
Path:
\Building\Permits\P\Park Ln\615 W Park Ln
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV <br />SHEET NAME <br />SHEET SIZE <br />SHEET NUMBER <br />ANSI B <br />11" X 17" <br />DATE DESCRIPTION <br />REVISIONS <br />Signature with Seal <br />PROJECT NAME & ADDRESS <br />PV-5 <br />PROJECT ID <br />JO <br />S <br />H <br /> <br />M <br />C <br />H <br />A <br />L <br />F <br />F <br />E <br />Y <br />61 <br />5 <br /> <br />W <br /> <br />P <br />A <br />R <br />K <br /> <br />L <br />N <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />6 <br />, <br />U <br />S <br />A <br />FRESH08/31/2022 ORIGINAL PLAN <br />2065 W OBISPO AVE #102 <br />GILBERT, AZ 85233 USA <br />866-572-2637 <br />LIC # CA-1019100 <br />ABHISHEK MAHESH <br />ELECTRICAL LINE <br />DIAGRAM <br />MAIN SERVICE VOLTAGE: <br />MAIN PANEL BRAND: <br />MAIN SERVICE PANEL: <br />MAIN BREAKER RATING: <br />MAIN SERVICE LOCATION: <br />SERVICE FEED SOURCE: <br />240V <br />200 A (NEW) <br />NORTH <br />(20) SOLARIA POWERXT 400R-PM 400W MODULES <br />(01) SOLAREDGE TECHNOLOGY:SE6000H-US (240V) <br />(20) SOLAREDGE POWER OPTIMIZERS S-440 <br />(2) STRINGS OF 10 MODULES CONNECTED IN SERIES. <br />SCALE: NTSPV-5 <br />1 ELECTRICAL LINE DIAGRAM <br />Tag # <br />THWN-2 - Ground <br />Conduit Conductor Schedule (ALL CONDUCTORS MUST BE COPPER) <br />THWN-2 <br />1 <br />1 <br />2 <br />2 <br />3 <br />Bare Copper Ground (EGC/GEC) <br />THWN-2 <br />PV WIRE <br />10 AWG <br />8 AWG <br />THWN-2 - Ground <br />Description Wire Gauge # of Conductors/Color <br />10 AWG <br />6 AWG <br />8 AWG <br />8 AWG <br />4 (2V+, 2V-) <br />1 BARE <br />4 (2V+, 2V-) B/R <br />1 (GRN) <br />3 (1L1, 1L2, 1N) B/R/W <br />1 (GRN)3 <br />INTERCONNECTION <br />120% RULE - NEC 705.12(B)(2)(3)(a) <br />UTILITY FEED + SOLAR BACKFEED <br />200A + 35A = 235A <br />BUSS RATING x 120% <br />200A x 120% = 240A <br />200 A (NEW) <br />PAGE 5 OF 19 <br />Conduit Type Conduit Size <br />EMT 3/4" <br />3/4" <br />3/4" <br />3/4" <br />EMT <br />EMT <br />EMT <br />INSIDE EMT-ON ROOF <br />INSIDE EMT-ON ROOF 3/4" <br />3/4" <br />3 <br />L1 <br />L2 <br />N <br />G <br />= <br />ACDC <br />3 <br />L1 <br />L2 <br />L1 <br />L2 <br />N <br />G <br />N <br />G <br /> AC DISCONNECT <br />EATON#DG222URB 60A, <br />2P,240VAC NEMA 3R (N) MAIN BREAKER TO <br />HOUSE 240V, 200A/2P, <br />(TOP FED) <br />(N) 35A/2P PV BREAKER AS <br />FAR AS POSSIBLE FROM <br />THE MAIN BREAKER <br />BI-DIRECTIONAL UTILITY <br />METER 1-PHASE, 3-W, <br />120V/240V <br />UTILITY PROVIDER :- SCE <br />UTILITY METER # :- 222012-829412 <br />SERVICE INFO <br />UTILITY PROVIDER: SCE <br />OVERHEAD <br />SYSTEM SIZE: <br />TOTAL DC SYSTEM SIZE: 8.00 kW DC <br />TOTAL AC SYSTEM SIZE: 6.00 kW AC <br />(N) MAIN SERVICE PANEL, <br />200A RATED, 240V, <br />(SEMI-FLUSH MOUNT) <br />SIEMENS MC4040B1200SECW <br />SIEMENS MC4040B1200SECW <br />SOLAREDGE TECHNOLOGY: <br />SE6000H-US <br />OUTPUT: 240 VAC, 25.00A <br />99% CEC WEIGHTED EFFICIENCY <br />NEMA 3R, UL LISTED, INTERNAL GFDI <br />WITH INTEGRATED DC DISCONNECT & <br />INTEGRATED RAPID SHUTDOWN <br />G <br />N <br />NL2L1 <br />M <br />TO UTILITY GRID <br />200A <br />35A/2P <br />GROUNDING <br />ELECTRODE SYSTEM <br />· APPROVED MAIN SERVICE <br />PANEL TO BE INSTALLED AT SITE <br />JUNCTION BOX <br />600 V, NEMA 3 <br />UL LISTED <br />- + <br />- + + <br />- + <br />+ + + - - - <br />2 <br />- + <br />- <br />1 3 <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />2 1 <br />09 10 <br />SolarEdge Power Optimizer S-440 Rated <br />DC Input Power - S-440 watts <br />Maximum Input Voltage - 60 Vdc <br />MPPT Range - 8 to 60 Vdc <br />Maximum Input Current - 14.50 Adc <br />Maximum Output Current - 15 Adc String <br />Limitations - 8 to 25 Optimizers, <br />5700 watts STC per string maximum <br />SOLARIA POWERXT <br />400R-PM 400W MODULES <br />- + <br />- + + <br />- + <br />+ + +- - - <br />2 <br />- + <br />- <br />1 3 <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />= <br />09 10 <br />615 W Park Ln <br />11/01/22
The URL can be used to link to this page
Your browser does not support the video tag.