Laserfiche WebLink
SHEET: <br />SHEET TITLE <br />RGA, OFFICE OF ARCHITECTURAL DESIGN <br />COPYRIGHT <br />RGA PROJECT NO: <br />CONSULTANT <br />PROFESSIONAL SEALS <br />00000.00 <br />MARK DATE DESCRIPTION <br />OWNER PROJECT NO: 00000.00 <br />CAD FILE NAME:- <br />DRAWN BY:DM <br />CHK'D BY:ML <br />17300 Red Hill Avenue, Suite 250 <br />Irvine, CA 92614 <br />T: (949) 579-1170 <br />miyamotointernational.com <br />MI Project #: MI2004255.00 <br />S 3525 <br />Exp. 03/31/21 <br />REGISTEREDPROFESSIONALENGINEER <br />STATE OF CALIFORNIASTRUCTURAL <br />J <br />EFFREY AL A N CROSIE <br />R <br />SHEA DYER <br />BUSINESS PARK <br />ANDURIL <br />BUILDING 4 <br />642 ALTON AVENUE <br />SANTA ANA, CA <br />PC <br />DD <br />01/22/2021 PC RESUBMITTAL1 <br />GENERAL NOTES <br />S1.1 <br />GENERAL NOTES <br />010000-0000 (07/07/14) <br />1. REFER TO THE TYPICAL DETAIL SHEETS FOR TYPICAL DETAILS OF CONSTRUCTION. TYPICAL <br />DETAILS APPLY TO ALL CONSTRUCTION UNLESS SPECIFICALLY NOTED OR SHOWN OTHERWISE. <br />WHERE CONDITIONS REQUIRE MODIFICATIONS OF A TYPICAL DETAIL, THE CONTRACTOR SHALL <br />SUBMIT MODIFIED DETAIL FOR APPROVAL BY THE ENGINEER OF RECORD PRIOR TO FABRICATION <br />AND INSTALLATION. DETAILS OF CONSTRUCTION NOT SHOWN SHALL BE OF SAME NATURE AS <br />THOSE SHOWN FOR SIMILAR CONSTRUCTION. <br />2. CONTRACTOR SHALL CONSIDER THE PROJECT SPECIFICATIONS A PART OF THE CONTRACT <br />DOCUMENTS. WHERE INFORMATION IS CONFLICTING, SPECIFIC DETAILS SHALL GOVERN OVER <br />TYPICAL DETAILS WHICH SHALL GOVERN OVER THESE NOTES WHICH SHALL GOVERN OVER <br />SPECIFICATIONS. <br />3. ALL DIMENSIONS ON STRUCTURAL DRAWINGS SHALL BE CHECKED AGAINST ARCHITECTURAL <br />DIMENSIONS. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE OMITTED OR NOT CLEAR, <br />CONTACT THE ARCHITECT (ARCH) OR ENGINEER OF RECORD (EOR). ALL DIMENSIONS RELATED <br />TO EXISTING CONDITIONS SHALL BE FIELD VERIFIED BY THE CONTRACTOR. DIMENSIONS ARE TO <br />THE FACE OF STUDS, AND TO CENTERLINE OF COLUMNS UNO. <br />4. IT IS THE CONTRACTOR'S RESPONSIBILITY TO IMMEDIATELY NOTIFY THE EOR OF ANY CONFLICTS <br />BETWEEN THE STRUCTURAL DRAWINGS AND OTHER DRAWINGS; OR EXISTING CONDITIONS NOT <br />SHOWN OR DIFFERENT FROM THOSE SHOWN ON DRAWINGS PRIOR TO COMMENCEMENT OF <br />WORK. THE CONTRACTOR IS NOT TO ORDER MATERIAL OR CONSTRUCT ANY PORTION OF THE <br />BUILDING THAT IS IN CONFLICT UNTIL THE CONFLICT IS RESOLVED WITH THE AFFECTED PARTIES. <br />5. THE STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE. <br />UNLESS OTHERWISE SHOWN THEY DO NOT INDICATE METHOD OF CONSTRUCTION. THE <br />CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE CONSTRUCTION <br />AND ALL ADJACENT PROPERTIES DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE <br />BUT ARE NOT LIMITED TO BRACING, SHORING OF LOADS DUE TO CONSTRUCTION EQUIPMENT, <br />ETC. OBSERVATION VISITS TO THE SITE BY THE ARCHITECT OR EOR SHALL NOT INCLUDE <br />OBSERVATION OF THE ABOVE ITEMS. <br />6. SUBSTITUTION REQUESTS FOR MATERIALS SPECIFIED ON THE STRUCTURAL DRAWINGS MAY BE <br />CONSIDERED WITH MATERIALS HAVING EQUIVALENT OR GREATER CAPACITY AND <br />PERFORMANCE. CURRENT EVALUATION REPORTS AND PRODUCT INFORMATION SHALL BE <br />PROVIDED TO THE STRUCTURAL ENGINEER DEMONSTRATING THE REQUIRED CAPACITY AND <br />PERFORMANCE OF THE MATERIAL TO BE SUBSTITUTED. WRITTEN APPROVAL FROM THE EOR <br />SHALL BE OBTAINED PRIOR TO THE SUBSTITUTION OF ANY MATERIAL SPECIFIED ON THE <br />STRUCTURAL DOCUMENTS. <br />7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COMPLY WITH THE PERTINENT SECTIONS OF THE <br />"CONSTRUCTION SAFETY ORDERS" ISSUED BY THE STATE OF CALIFORNIA, LATEST EDITION, AND <br />ALL OSHA REQUIREMENTS AS THEY APPLY TO THIS PROJECT. THE ARCHITECT, EOR, AND THE <br />OWNER DO NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTRACTOR'S FAILURE TO COMPLY <br />WITH THESE REQUIREMENTS. <br />8. ALL WORK IS NEW (N) UNLESS INDICATED AS EXISTING (E). <br />9. CONSTRUCTION MATERIALS SHALL BE DISTRIBUTED WHEN PLACED ON THE STRUCTURE SUCH <br />THAT LOADS DO NOT EXCEED DESIGN LIVE LOADS OR RESULT IN AN UNBALANCED CONDITION. <br />10. REFER TO THE PROJECT SPECIFICATIONS FOR SHOP DRAWING REQUIREMENTS AND <br />SUBMITTALS. SHOP DRAWINGS SHALL BE SUBMITTED TO THE EOR (ALLOW FOR A REVIEW <br />DURATION OF 10 BUSINESS DAYS), AND SHALL CONSIST OF EITHER ELECTRONIC FILES OR ONE <br />SET FOR OUR RECORDS AND ONE REPRODUCIBLE SET. REVIEW OF SHOP DRAWINGS AND <br />SUBMITTALS BY THE EOR IS FOR GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS. THE <br />CONTRACTOR WILL REMAIN RESPONSIBLE FOR ALL ERRORS OF DETAILING, FABRICATION, AND <br />FOR CORRECT FITTING OF ALL STRUCTURAL MEMBERS, INCLUDING COORDINATION WITH OTHER <br />TRADES. SHOP DRAWINGS AND SUBMITTALS DO NOT CONSTITUTE CHANGE ORDERS. ANY <br />PROPOSED CHANGES TO THE STRUCTURAL DOCUMENTS MUST BE SUBMITTED IN WRITING AS A <br />REQUEST FOR SUBSTITUTION TO THE ARCHITECT AND EOR FOR APPROVAL. SEE "STRUCTURAL <br />SUBMITTALS NOTES" FOR MORE INFORMATION. <br />11. CORE DRILLS REQUIRED SHALL NOT CUT ANY REINFORCING. THE CONTRACTOR IS TO <br />COORDINATE WORK OF ALL TRADES TO ENSURE COMPLIANCE. ALL CORE DRILLS ARE TO BE <br />PRESENTED TO THE INSPECTOR OF RECORD (IOR) FOR VERIFICATION. THE IOR IS TO DOCUMENT <br />CORES EXAMINED INDICATING AN ABSENCE OF REINFORCING. <br />12. STRUCTURAL JOINT DIMENSIONS SHOWN ON PLANS (EXPANSION, SEISMIC, SEPARATION, ETC) <br />(WHERE OCCURS) INDICATE THE MINIMUM CLEAR DISTANCE REQUIRED. SEE PLANS, DETAILS, <br />AND ARCHITECTURAL DRAWINGS FOR ADDITIONAL REQUIREMENTS. <br />STRUCTURAL STEEL NOTES <br />051200-0000 (07/07/14) <br />1. DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE <br />SPECIFICATIONS AND STANDARD OF THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), <br />AS CONTAINED IN THE LATEST EDITION OF "AISC MANUAL OF STEEL CONSTRUCTION". <br />2. ALL STRUCTURAL STEEL SHALL BE ERECTED PLUMB AND TRUE TO LINE. TEMPORARY BRACING <br />SHALL BE INSTALLED AND SHALL BE LEFT IN PLACE UNTIL OTHER MEANS IS PROVIDED TO <br />ADEQUATELY BRACE THE STRUCTURE. <br />3. PROVIDE THE FOLLOWING MATERIALS FOR STRUCTURAL STEEL UNO: <br />a. EXCEPT AS OTHERWISE NOTED, ALL BOLTS SHALL BE HIGH STRENGTH BOLTS. <br />4. ALL CONNECTIONS NOT SHOWN SHALL CONFORM TO THE "AISC MANUAL OF STEEL <br />CONSTRUCTION" AND SHALL BE SUBMITTED ON SHOP DRAWINGS FOR REVIEW BY EOR PRIOR TO <br />FABRICATION. <br />5. ALL WELDED HEADED STUDS, THREADED STUDS, AND DEFORMED BARS SHALL BE NELSON, OR <br />EQUIVALENT, AND WELDED (IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS BY <br />CERTIFIED WELDERS) SO AS TO FULLY DEVELOP THE TENSILE CAPACITY OF THE CONNECTOR. <br />6. BOLTS WITH UPSET THREADS ARE NOT ALLOWED. USE THE APPROPRIATE NUT AND WASHER <br />TYPE FOR THE SPECIFIED BOLT. <br />7. ALL STEEL FABRICATION SHALL BE PERFORMED BY A LICENSED FABRICATOR. <br />8. ALL STRUCTURAL STEEL AND MISCELLANEOUS STEEL PERMANENTLY EXPOSED TO THE <br />ELEMENTS SHALL BE HOT DIP GALVANIZED AFTER FABRICATION UNLESS A WEATHER PROOF <br />COATING IS SPECIFIED BY THE ARCHITECT, UNO. STAINLESS AND WEATHERING STEELS, WHERE <br />SPECIFIED, ARE EXEMPT FROM THIS REQUIREMENT. GALVANIZED SURFACES SHALL BE <br />PROTECTED DURING CONSTRUCTION AND SHALL BE REPAIRED AS NECESSARY. ALL <br />ARCHITECTURALLY EXPOSED STRUCTURAL STEEL (AESS) SHALL COMPLY WITH AISC CODE OF <br />STANDARD PRACTICE, SECTION 10. <br />9. SEE ARCHITECTURAL DRAWINGS FOR NAILER HOLES, WELDED STUDS OR OTHER ITEMS NOT <br />SHOWN IN THESE DRAWINGS. WHERE STEEL IS EMBEDDED IN CONCRETE OR MASONRY, PROVIDE <br />HOLES AS REQUIRED FOR PASSAGE OF CONTINUOUS REINFORCING BARS WHERE INDICATED ON <br />DRAWINGS. DO NOT CUT HOLES IN STRUCTURAL STEEL WITHOUT PRIOR APPROVAL OF EOR. <br />10. PLACE NON-SHRINK OR DRYPACK GROUT UNDER ALL BASE PLATES AND ALLOW TO CURE <br />BEFORE APPLYING LOADS. <br />11. ALL WORK SHALL BE IN CONFORMANCE WITH ANY AND ALL TESTING, INSPECTION, <br />QUALIFICATION, AND QUALITY ASSURANCE PROVISIONS AS REQUIRED BY THE BUILDING CODE <br />AND ANY APPLICABLE STANDARDS. THESE STANDARDS INCLUDE, BUT ARE NOT LIMITED TO THE <br />LATEST VERSION OF THE FOLLOWING: AISC 360 "SPECIFICATION FOR STRUCTURAL STEEL <br />BUILDINGS"; AISC 341 "SEISMIC PROVISIONS FOR STRUCTURAL STEEL BUILDINGS", AWS D1.1 <br />"STRUCTURAL WELDING CODE - STEEL"; AWS D1.8 "STRUCTURAL WELDING CODE - SEISMIC <br />SUPPLEMENT"; AND RCSC "SPECIFICATION FOR STRUCTURAL JOINTS USING HIGH-STRENGTH <br />BOLTS". CONFORMANCE TO SUPPLEMENTS TO THESE STANDARDS, IF PUBLISHED ON OR BEFORE <br />THE DATE OF PERMIT ISSUANCE, IS ALSO REQUIRED. ALTHOUGH THESE CONTRACT DOCUMENTS <br />INCLUDE GENERAL REFERENCES TO CODES AND STANDARDS, AND REFERENCES TO OR <br />INCLUSIONS OF SPECIFIED PROVISIONS, OMISSIONS OF ANY APPLICABLE CODE, STANDARD, OR <br />PROVISION DOES NOT RELIEVE THE GENERAL CONTRACTOR FROM COMPLIANCE TO THE <br />APPLICABLE REQUIREMENTS. COORDINATION OF QUALITY CONTROL AND QUALITY ASSURANCE <br />IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. <br />SHAPE MATERIAL/GRADE <br />WIDE FLANGE SECTIONS ASTM A992 <br />PLATES, ANGLES, CHANNELS & TEES ASTM A36 <br />SQUARE OR RECTANGULAR HOLLOW <br />STRUCTURAL SECTIONS (HSS) <br />ASTM A500, GRADE B (F y=46 <br />KSI) <br />ROUND HOLLOW STRUCTURAL SECTIONS (HSS)ASTM A500, GRADE B (F y=42 <br />KSI) <br />PIPES ASTM A53 TYPE E OR S, GRADE <br />B, (F y=35 KSI) <br />MACHINE BOLTS (MB)ASTM A307 <br />HIGH STRENGTH BOLTS (HSB)ASTM A325 TYPE N <br />WELDED HEADED STUDS ASTM A108 <br />THREADED RODS FOR ANCHOR BOLTS ASTM F1554, GRADE 36 <br />WELDING NOTES <br />051200-0000 (07/07/14) <br />1. WELDING PROCEDURES, ELECTRODES AND WELDER QUALIFICATIONS SHALL CONFORM TO THE <br />"CODE FOR WELDING IN BUILDING CONSTRUCTION", AMERICAN WELDING SOCIETY (AWS), D1.1 <br />AND THE AISC "SPECIFICATIONS FOR THE DESIGN, FABRICATION AND ERECTION OF STRUCTURAL <br />STEEL FOR BUILDINGS". <br />2. ALL WELDERS SHALL HAVE EVIDENCE OF PASSING THE AWS STANDARD QUALIFICATION TESTS, <br />AND SHALL BE CERTIFIED FOR THE WORK THEY ARE PERFORMING. <br />3. PROJECT WELDING SHALL BE PERFORMED ONLY IN ACCORDANCE WITH WELDING PROCEDURE <br />SPECIFICATIONS (WPS) SUBMITTED BY THE CONTRACTOR AND REVIEWED BY THE EOR AND <br />PROJECT WELDING INSPECTOR. THE WPS SHALL BE IN ACCORDANCE WITH AWS D1.1-D1.4 <br />CURRENT EDITION. <br />4. WELDING OF STRUCTURAL STEEL SHALL BE PERFORMED PER AWS D1.1 USING E70XX <br />ELECTRODES UNLESS OTHERWISE NOTED. <br />5. WELDING OF REINFORCING BARS SHALL BE PERFORMED PER AWS D1.4 USING E90XX <br />ELECTRODES. <br />6. WELDING OF METAL DECK AND LIGHT GAGE STEEL SHALL BE IN ACCORDANCE WITH AWS D1.3. <br />7. ALL FULL PENETRATION WELDS SHALL BE ULTRA-SONIC TESTED PER AWS D1.1. SEE AISC 341 <br />SECTION W4.1. <br />8. ALL GROOVE OR BUTT WELDS SHALL BE COMPLETE PENETRATION WELDS, UNO. ALL EXPOSED <br />BUTT WELDS SHALL BE GROUND SMOOTH. <br />9. ALL EXPOSED WELDS ON ARCHITECTURALLY EXPOSED STRUCTURAL STEEL (AESS) SHALL <br />COMPLY WITH AISC CODE OF STANDARD PRACTICE, SECTION 10. <br />10. FIELD WELDS HAVE BEEN INDICATED WHERE THEY ARE EXPECTED TO OCCUR. THE <br />CONTRACTOR SHALL DETERMINE THE ACTUAL FIELD WELDING NECESSARY TO COMPLETE THE <br />PROJECT AND INCLUDE ALL ASSOCIATED COSTS WITHIN THE BASE BID. <br />HIGH-STRENGTH BOLT NOTES <br />1. SEE STRUCTURAL STEEL NOTES THIS SHEET FOR ADDITIONAL INFORMATION. <br />2. JOINT ASSEMBLIES USING HIGH-STRENGTH BOLTS SHALL BE IN ACCORDANCE WITH THE <br />CURRENT EDITION OF THE "AISC (RCSC) SPECIFICATION FOR STRUCTURAL JOINTS USING <br />HIGH-STRENGTH BOLTS". <br />3. ALL HIGH-STRENGTH BOLTS SHALL CONFORM TO ASTM A-325 OR ASTM A-490, NUTS SHALL <br />CONFORM TO ASTM A-563 AND WASHERS SHALL CONFORM TO ASTM F-436. <br />4. PAINT SHALL NOT BE PERMITTED ON CONTACT SURFACES UNLESS NOTED OTHERWISE. <br />CONTACT SURFACES OF BOLTED PARTS SHALL BE DESCALED AND FREE OF DIRT, OIL, BURRS, <br />PITS, AND OTHER DEFECTS WHICH PREVENT SOLID SEATING OF PARTS. <br />5. ALL HIGH-STRENGTH BOLTS SHALL BE TIGHTENED TO THE AISC SNUG TIGHT CONDITION UNLESS <br />SPECIFIED AS SLIP-CRITICAL. <br />6. SLIP-CRITICAL BOLTS SHALL HAVE CLASS "A" FAYING SURFACES. SLIP-CRITICAL JOINT <br />ASSEMBLIES SHALL BE FULLY PRE-TENSIONED BY TURN-OF-NUT TIGHTENING, TENSION CONTROL <br />CALIBRATED WRENCH TIGHTENING, TWIST-OFF BOLTS CONFORMING TO ASTM F1852, OR BY <br />DIRECT TENSION INDICATOR TIGHTENING CONFORMING TO ASTM F959. <br />051200-0000 (07/07/14) <br />010000-0005 (07/07/14) <br />DEFERRED APPROVAL ITEMS <br />SUBMITTAL DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE REVIEWED BY THE ARCHITECT <br />OR ENGINEER OF RECORD AND THEN SUBSEQUENTLY REVIEWED AND APPROVED BY THE BUILDING <br />OFFICIAL PRIOR TO INSTALLATION. <br />MECHANICAL NOTES <br />1. MECHANICAL CONTRACTOR TO VERIFY ALL MECHANICAL UNIT LOCATIONS, SIZES AND OPENINGS. <br />2. STEEL FABRICATOR TO LOCATE ALL BEAMS BASED ON INFORMATION FROM MECHANICAL <br />CONTRACTOR AND SUBMIT STEEL BEAM LOCATION TO THE STRUCTURAL ENGINEER FOR REVIEW. <br />3. MECHANICAL CONTRACTOR SHALL SUBMIT HVAC ANCHORAGE DETAILS STAMPED AND SIGNED BY <br />A STATE LICENSED CIVIL ENGINEER. THIS INCLUDES ANCHORAGE FOR UNITS MORE THAN 400 LBS <br />MOUNTED ABOVE A FLOOR OR ROOF LEVEL AND UNITS MORE THAN 20 LBS OR 5 LBS/FT HANGING <br />BELOW A FLOOR OR ROOF. <br />STRUCTURAL DESIGN CRITERIA <br />010000-0001 (07/07/14) <br />1. CODES: <br />ALL NEW WORK SHALL BE IN CONFORMANCE WITH THE CALIFORNIA BUILDING CODE (CBC) 2019 <br />EDITION, INCLUDING ALL AMENDMENTS. ALL STANDARDS USED SHALL BE THE LATEST <br />VERSION APPROVED BY THE CODE ENFORCEMENT AGENCY ON THE DATE OF THE PERMIT <br />ISSUANCE UNLESS SPECIFICALLY NOTED OTHERWISE. <br />2. GRAVITY DESIGN LOADS: <br />3. WIND DESIGN INFORMATION: <br />4. SEISMIC DESIGN INFORMATION: <br />LIVE LOADS (REDUCIBLE, UNO): <br />a. ROOF, UNIFORM 20 PSF <br />RISK CATEGORY II EXPOSURE C <br />BASIC WIND SPEED (3 SEC GUST), Vult = 95 MPH <br />INTERNAL PRESSURE COEFFICIENT GCpi = ± 0.18 <br />Ie = 1.0 RISK CATEGORY II DESIGN CAT. D <br />SS = 1.271 S1 = 0.455 SDS = 1.017 <br />AB ANCHOR BOLT <br />ABV ABOVE <br />ADDL ADDITIONAL <br />ADJ ADJACENT <br />AFF ABOVE FINISH FLOOR <br />ALT ALTERNATE <br />ARCH ARCHITECT(URAL) <br />BLDG BUILDING <br />BLKG BLOCKING <br />BLW BELOW <br />BM BEAM <br />BN BOUNDARY NAILING <br />B.O. BOTTOM OF <br />B.O.S. BOTTOM OF SHEATHING <br />BOTT BOTTOM <br />BRG BEARING <br />BS BOTH SIDES <br />BTWN BETWEEN <br />C CAMBER <br />CIP CAST IN PLACE <br />CJ CONTROL/CONSTRUCTION <br />JOINT <br />CJP COMPLETE JOINT <br />PENETRATION <br />CL CENTERLINE <br />CLG CEILING <br />CLR CLEAR <br />CMU CONCRETE MASONRY UNIT <br />COL COLUMN <br />CONC CONCRETE <br />CONN CONNECTION <br />CONT CONTINUOUS <br />CP COMPLETE PENETRATION <br />CSK COUNTERSINK <br />CTR(D) CENTER(ED) <br />D <br />B BAR OR BOLT DIAMETER <br />DBL DOUBLE <br />DEMO DEMOLITION <br />DET DETAIL <br />DIA DIAMETER <br />DIAG DIAGONAL <br />DIM DIMENSION <br />DO DITTO <br />DWG DRAWING <br />(E) EXISTING <br />EA EACH <br />EF EACH FACE <br />EJ EXPANSION JOINT <br />EMBED EMBEDMENT <br />ELEC ELECTRICAL <br />ELEV ELEVATION <br />EN EDGE NAILING <br />E.O. EDGE OF <br />EOR ENGINEER OF RECORD <br />EQ EQUAL <br />EQUIP EQUIPMENT <br />ES EACH SIDE OR EDGE <br />SCREW <br />EW EACH WAY <br />EXP EXPANSION <br />EXT EXTERIOR <br />FIN FINISH <br />FLG FLANGE <br />FLR FLOOR <br />FN FIELD NAILING <br />FND FOUNDATION <br />F.O. FACE OF <br />FS FAR SIDE OR FIELD SCREW <br />FRMG FRAMING <br />FT FOOT OR FEET <br />FTG FOOTING <br />G GIRDER <br />GA GAGE <br />GALV GALVANIZED <br />GC GENERAL CONTRACTOR <br />GLB GLUED-LAMINATED BEAM <br />HAB HEADED ANCHOR BOLT <br />HD HOLDOWN <br />HDR HEADER <br />HGR HANGER <br />HK HOOK <br />HORIZ HORIZONTAL <br />HP HIGH POINT <br />HS HIGH STRENGTH <br />HSB HIGH STRENGTH BOLT <br />HSS HOLLOW STRUCTURAL <br />STEEL <br />HT HEIGHT <br />ID INSIDE DIAMETER <br />I.F. INSIDE FACE <br />IN INCH <br />INT INTERIOR <br />JST JOIST <br />JT JOINT <br />KLF KIPS PER LINEAR FOOT <br />KSF KIPS PER SQUARE FOOT <br />KSI KIPS PER SQUARE INCH <br />L ANGLE <br />LFRS LATERAL FORCE RESISTING <br />SYSTEM <br />LLH LONG LEG HORIZONTAL <br />LLV LONG LEG VERTICAL <br />LP LOW POINT <br />LWC LIGHT WEIGHT CONCRETE <br />MAX MAXIMUM <br />MB MACHINE BOLT <br />MECH MECHANICAL <br />MFR MANUFACTURER <br />MIN MINIMUM <br />MTL METAL <br />(N) NEW <br />NS NEAR SIDE OR NON-SHRINK <br />NTS NOT TO SCALE <br />NWC NORMAL WEIGHT <br />CONCRETE <br />OC ON CENTER <br />OD OUTSIDE DIAMETER <br />O.F. OUTSIDE FACE <br />OH OPPOSITE HAND <br />OPNG OPENING <br />PDF POWDER/POWER DRIVEN <br />FASTENER <br />PJ PANEL JOINT <br />PJP PARTIAL JOINT <br />PENETRATION <br />PL PLATE <br />PLC(S) PLACE(S) <br />PLF POUNDS PER LINEAR FOOT <br />PLYWD PLYWOOD <br />PREFAB PREFABRICATED <br />PSF POUNDS PER SQUARE FOOT <br />PSI POUNDS PER SQUARE INCH <br />PT PRESSURE TREATED OR <br />POST TENSION <br />QTY QUANTITY <br />RAD, R RADIUS <br />REF REFERENCE <br />REINF REINFORCING <br />REQD REQUIRED <br />(S) "SIMPSON" STRONG TIE CO. <br /> OR "USP" <br />W/ EQUIVALENT ICC VALUES <br />SB SILL BOLT <br />SC SAW CUT OR SLIP CRITICAL <br />SCHED SCHEDULE <br />SHTG SHEATHING <br />SIM SIMILAR <br />SMS SHEET METAL SCREW <br />SN SILL NAIL <br />SOG SLAB ON GRADE <br />SQ SQUARE <br />SS STAINLESS STEEL <br />STD STANDARD <br />STGRD STAGGERED <br />STIFF STIFFENER <br />STL STEEL <br />STRUCT STRUCTURAL <br />T&B TOP & BOTTOM <br />THK THICK <br />T.O. TOP OF <br />TYP TYPICAL <br />UNO UNLESS NOTED OTHERWISE <br />VERT VERTICAL <br />VIF VERIFY IN FIELD <br />W/ WITH <br />W/O WITHOUT <br />WF, W WIDE FLANGE <br />WLD WELDED <br />WO WHERE OCCURS <br />WP WORK POINT <br />WT WEIGHT <br />WWF WELDED WIRE FABRIC <br />010000-0002-ALT2 (01/05/15) <br />TYPICAL ABBREVIATIONS <br />STRUCTURAL STEEL <br />PERIODIC: HIGH-STRENGTH BOLTS, NUTS, AND WASHERS IDENTIFICATION MARKINGS TO CONFORM <br />TO ASTM STANDARDS SPECIFIED IN THE APPROVED CONSTRUCTION DOCUMENTS, <br />MANUFACTURER'S CERTIFICATE OF COMPLIANCE REQUIRED <br />PERIODIC: INSPECTION OF HIGH-STRENGTH BOLTING BEARING-TYPE CONNECTIONS <br />PERIODIC: INSPECTION OF SLIP-CRITICAL CONNECTIONS USING TURN-OF-NUT METHOD WITH <br />MATCHMARKING, DIRECT TENSION INDICATOR METHOD, OR TWIST OFF BOLTS <br />CONT: INSPECTION OF SLIP-CRITICAL CONNECTIONS USING CALIBRATED WRENCH METHOD OR <br />TURN-OF-NUT WITHOUT MATCHMARKING <br />PERIODIC: STRUCTURAL STEEL IDENTIFICATION MARKINGS TO CONFORM TO ASTM <br />STANDARDS SPECIFIED IN THE APPROVED CONSTRUCTION DOCUMENTS <br />PERIODIC: STRUCTURAL STEEL MANUFACTURER'S CERTIFIED MILL TEST REPORTS <br />REQUIRED <br />PERIODIC: INSPECTION OF STEEL FRAME BRACING & STIFFENER DETAILS FOR <br />COMPLIANCE WITH APPROVED CONSTRUCTION DOCUMENTS <br />PERIODIC: STEEL FRAME MEMBER LOCATIONS <br />PERIODIC: APPLICATIONS OF JOINT DETAILS AT EACH CONNECTION <br />WELDING <br />CONT: COMPLETE AND PARTIAL PENETRATION GROOVE WELDS <br />CONT: FILLET WELDS > 5/16" AND MULTIPASS FILLET WELDS <br />PERIODIC: FILLET WELDS < 5/16" <br />PERIODIC: METAL DECK WELDS <br />PERIODIC: LIGHT GAUGE METAL WELDS <br />PERIODIC: WELD FILLER MATERIAL IDENTIFICATION MARKINGS TO CONFORM TO AWS <br />STANDARDS SPECIFIED IN THE APPROVED CONSTRUCTION DOCUMENTS, <br />MANUFACTURER'S CERTIFICATION OF COMPLIANCE REQUIRED <br />CONT: WELDING OF REINFORCEMENT STEEL RESISTING SEISMIC FORCES, INDICATED ON PLANS <br />AND DETAILS AS LFRS ELEMENTS OR CONNECTIONS <br />PERIODIC: VERIFICATION OF WELDABILITY OF REINFORCING STEEL OTHER THAN ASTM A706 <br />CONT: WELDING OF STIRRUPS, HOOPS OR TIES <br />CONT: REINFORCING WELDS IN CMU <br />PERIODIC: ALL OTHER REINFORCEMENT WELDS, UNO <br />STATEMENT OF SPECIAL INSPECTIONS <br />010000-0003 (07/07/14) <br />1. THE OWNER SHALL EMPLOY ONE OR MORE SPECIAL INSPECTORS TO PROVIDE INSPECTIONS <br />DURING CONSTRUCTION. THE SPECIAL INSPECTOR SHALL BE A QUALIFIED PERSON WHO SHALL <br />DEMONSTRATE COMPETENCE, TO THE SATISFACTION OF THE BUILDING OFFICIAL, FOR <br />INSPECTION OF THE PARTICULAR TYPE OF CONSTRUCTION OR OPERATION REQUIRING SPECIAL <br />INSPECTION. <br />2. SPECIAL INSPECTIONS ARE NOT REQUIRED WHERE THE WORK IS DONE ON THE PREMISES OF A <br />FABRICATOR REGISTERED AND APPROVED TO PERFORM SUCH WORK WITHOUT SPECIAL <br />INSPECTION. APPROVED FABRICATORS MUST SUBMIT A CERTIFICATE OF COMPLIANCE FOR <br />OFFSITE FABRICATIONS SUCH AS STRUCTURAL STEEL, PRECAST CONCRETE, GLUED LAMINATED <br />TIMBER, ETC. <br />3. ALL INSPECTIONS SHALL BE PERFORMED BY INDEPENDENT SPECIAL INSPECTORS. JOB SITE <br />VISITS BY THE STRUCTURAL ENGINEER OR BUILDING OFFICIAL DO NOT CONSTITUTE AND ARE <br />NOT A SUBSTITUTE FOR INSPECTIONS BY A SPECIAL INSPECTOR. <br />4. ALL INSPECTION REPORTS SHALL BE SUBMITTED TO THE BUILDING OFFICIAL AND EOR. THE <br />FINAL REPORTS BY THE SPECIAL INSPECTOR(S) MUST CERTIFY THAT THE ENTIRE STRUCTURAL <br />SYSTEM COMPLIES WITH THE APPROVED PLANS AND SPECIFICATIONS. <br />5. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO SEE THAT THESE INSPECTIONS ARE <br />PERFORMED. <br />6. WORK REQUIRING SPECIAL INSPECTION SHALL BE INSPECTED BY THE SPECIAL INSPECTOR WHO <br />IS PRESENT IN THE AREA WHERE THE WORK IS PERFORMED AND AT THE COMPLETION OF WORK. <br />CONTINUOUS INSPECTION CONSISTS OF FULL-TIME INSPECTION; PERIODIC INSPECTION <br />CONSISTS OF PART-TIME OR INTERMITTENT INSPECTION. <br />7. THE FOLLOWING SPECIAL INSPECTIONS ARE IN ADDITION TO INSPECTIONS BY THE BUILDING <br />OFFICIAL. THIS LIST IS NOT INTENDED TO BE ALL INCLUSIVE. <br />010000-0008 (07/09/14) <br />STRUCTURAL SUBMITTALS <br />1. REVIEW OF SHOP DRAWINGS AND SUBMITTALS BY THE EOR IS FOR GENERAL COMPLIANCE <br />WITH THE CONTRACT DOCUMENTS. <br />2. SHOP DRAWINGS SHALL BE SUBMITTED TO THE EOR FOR REVIEW PRIOR TO FABRICATION. THE <br />CONTRACTOR WILL REMAIN RESPONSIBLE FOR ALL ERRORS OF DETAILING, FABRICATION, AND <br />FOR CORRECT FITTING OF ALL STRUCTURAL MEMBERS INCLUDING COORDINATION WITH <br />OTHER TRADES. <br />A. SHOP DRAWINGS SHALL BE SUBMITTED TO THE EOR (ALLOW FOR A REVIEW DURATION <br />OF 10 BUSINESS DAYS), AND SHALL CONSIST OF EITHER ELECTRONIC FILES OR ONLY <br />ONE SET FOR OUR RECORDS AND ONE REPRODUCIBLE SET. <br />B. EOR WILL RETURN THE REPRODUCIBLE SET CLEARLY MARKED WITH COMMENTS. ANY <br />REQUIRED RECORD SET COPIES SHALL BE MADE FROM THIS RETURNED SET. <br />C. REPRODUCTION OF STRUCTURAL PLANS & DETAILS FOR SHOP DRAWINGS IS <br />PROHIBITED. SUBCONTRACTOR/FABRICATOR IS TO PROVIDE INDEPENDENTLY CREATED <br />DRAWINGS BASED ON THE STRUCTURAL PLANS AND DETAILS. <br />3. SHOP DRAWINGS AND SUBMITTALS DO NOT CONSTITUTE CHANGE ORDERS. ANY PROPOSED <br />CHANGES TO THE STRUCTURAL DOCUMENTS MUST BE SUBMITTED IN WRITING AS A REQUEST <br />FOR SUBSTITUTION TO THE ARCHITECT AND EOR FOR APPROVAL. <br />4. EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF A MAIN WIND- OR <br />SEISMIC-FORCE-RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM OR A WIND- OR <br />SEISMIC-RESISTING COMPONENT LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS SHALL <br />SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE <br />OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. THE <br />CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL CONTAIN ACKNOWLEDGEMENT OF <br />AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL <br />INSPECTION. <br />5. THE FOLLOWING LIST SUMMARIZES IMPORTANT STRUCTURAL SUBMITTALS FOR THIS PROJECT. <br />REFER TO THE SPECIFICATIONS FOR A COMPLETE LIST AND ADDITIONAL REQUIREMENTS. <br />GENERAL <br />REQD: QUALIFICATION DATA FOR APPROVED INSTALLERS AND FABRICATORS <br />REQD: CERTIFICATES OF CONFORMANCE FOR PREFABRICATED MEMBERS <br />STRUCTURAL STEEL <br />REQD: MANUFACTURER'S MILL CERTIFICATES <br />REQD: MILL TEST REPORTS <br />REQD: SHOP DRAWINGS FOR FABRICATION AND ASSEMBLY OF MEMBERS <br />REQD: ERECTION PLAN SEQUENCE AND PROCEDURES <br />REQD: WELDING PROCEDURE SPECIFICATIONS (WPS) <br />REQD: CERTIFICATES FOR ALL WELDERS VERIFYING CURRENT AWS QUALIFICATIONS <br />REQD: TEST REPORTS FOR SHOP AND FIELD WELDED AND BOLTED CONNECTIONS <br />KEY MAP <br />1 <br />SCOPE OF WORK: <br />ADDITION OF 5 NEW <br />CEILING FANS <br />2020-162041 <br />02/23/21