Laserfiche WebLink
McPherson Engineering By: A.L. <br />Date: 4/12/22 <br />Gravity Loads: <br />DEMAND DECREASED BY 9.27% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 4.22% < 10% = OK! <br />Anchorage: <br />DEMAND OF 632.4LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 5.33FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />4/12/2022 8:47 AM <br />7 of 7 <br />©McPherson Engineering <br />702 E. Buffalo Ave. <br />04/27/22