Laserfiche WebLink
(C) RAIL SPLICE GROUNDING <br />EITHER METHOD 1.3 PER MANUFACTURERS INSTALL INSTRUCTIONS <br />(1) BOND STRIP GROUNDS RAIL TO <br />RAIL SPLICES -STAR WASHERS USED <br />g liitOTO BOND RAIL TO BONDING STRIP <br />, <br />\ <br />-- _ <br />,I RAIL RAIL .. <br />2 ,.. <br />, ---- 2AC- <br />I- #6 BARE (3) <br />COPPER <br />(3) WHERE NEITHER BONDING STRIP, INTEGRATED <br />GROUNDING SPLICE BAR OR INTEGRATED <br />GROUNDING MIDCLAMP ARE USED, 01 2703 <br />APPROVED GROUND LUG WITH #6 BARE COPPER <br />SHALL BE USED TO GROUND SPLICED RAILS. <br />USE METHOD (2) <br />RAIL TO RAIL <br />BONDING #6 BARE <br />COPPER WIRE -, <br />JBOX <br />GROUND <br />BUSHINGS <br />REQ. <br />, <br />\— <br />CONDUIT- <br />COMPRESSION- -- <br />FITTING <br />(2) SPLICE BAR SELF-TAP SCREWS <br />JOIN RAILS BONDING STRIPS USED <br />ON RAILS WITH GROUND LUGS <br />IF SPLICE BAR HAS INTEGRATED <br />GROUND BONDING STRIP IS <br />NOT NECESSARY <br />T <br />ir c <br />no nuoo <br />LOCK <br />/- 1- - LI <br />GROUNDING <br />BUSHING <br />WITH LAY-IN LUG ),, <br />\ <br />/ -ENCLOSURE <br />CONTINUOUS <br />GROUND <br />STRIP <br />INSULATION <br />CONDUIT GROUNDING DETAIL <br />EQUIPMENT GROUND <br />BUSHINGS REQ. FOR <br />SYSTEMS OVER 250V <br />\ <br />(C)/ (A) <br />A CONTINUOUS <br />s\". GROUND PER SLD_--- _ _INV <br />(IF USED) <br />- <br />SOLAR <br />METER <br />(IF REQ) <br />MIDCLAMP TEETH <br />MODULE PENETRATION_ \ <br />MODULE <br />RAIL <br />SERRATED T-BOL I BONDS <br />CLAMP TO RAIL <br />GROUNDING MID CLAMP <br />EACH GROUNDING MID CLAMP PIERCES THROUGH THE <br />ANODIZED COATINGS OF BOTH THE MODULE FRAME AND THE <br />MOUNTING RAIL TO FORM SECURE ELECTRICAL BONDS WHICH <br />ARE REPEATED THROUGHOUT THE ARRAY <br />MSP <br />Ad\ IRONRIDGE <br />=111 <br />UFO Family of Components <br />—0121 -M -11111111CMOIMIt <br />ut. <br />-Se,- · <br />G <br />R <br />O <br />U <br />N <br />D <br />I <br />N <br />G <br /> <br />801 E Borchard <br />Ave04/13/22