My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
801 E Borchard Ave - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Borchard Ave
>
801 E Borchard Ave
>
801 E Borchard Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2025 5:02:50 PM
Creation date
5/30/2025 8:01:05 AM
Metadata
Fields
Template:
Plan
Permit Number
20175177
101109184
Full Address
801 E Borchard Ave
Document Relationships
101109184 - Permit
(Permit - Plan)
Path:
\Building\Permits\B\Borchard Ave\801 E Borchard Ave
20175177 - Permit
(Permit - Plan)
Path:
\Building\Permits\B\Borchard Ave\801 E Borchard Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTE. <br />1 IN CASE OF EMERGENCY CALL AT WORK PHONE 4 OR HOME PHONE4 <br />2 SEDIMENT FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON SITE USING STRUCTURAL CONTROLS TO THE MAXIMUM EXTENT PRACTICABLE <br />3 STOCKPILES OF SOIL SHALL BE PROPERLY CONTAINED TO MINIMIZE SEDIMENT TRANSPORT FROM THE SITE TO STREETS DRAINAGE FACILITIES OR ADJACENT PROPERTIES VIA <br />RUNOFF, VEHICLE TACKING OR WIND <br />4 APPROPRIATE BMPS FOR CONSTRUCTION-RELATED MATERIALS. WASTES, SPILLS SHALL BE IMPLEMENTED TO MINIMIZE TRANSPORT FROM THE SITE TO STREETS DRAINAGE <br />FACILITIES OR ADJOINING PROPERTIES BY WIND OR RUNOFF <br />5 RUNOFF FROM EQUIPMENT AND VEHICLE WASHING SHALL BE CONTAINED AT CONSTRUCTION SITES UNLESS TREATED TO REDUCE OR REMOVE SEDIMENT AND OTHER <br />POLLUTANTS <br />6 ALL CONSTRUCTION CONTRACTOR AND SUBCONTRACTOR PERSONNEL ARE TO BE MADE AWARE OR THE REQUIRED BEST MANAGEMENT PRACTICES AND GOOD HOUSEKEEPING <br />MEASURES FOR THE PROJECT SITE AND ANY ASSOCIATED CONSTRUCTION STAGING AREAS <br />7 AT THE END OF EACH DAY OF CONSTRUCTION ACTIVITY ALL CONSTRUCTION DEBRIS AND WASTE MATERIALS SHALL BE COLLECTED AND PROPERLY DISPOSED IN TRASH OR <br />RECYCLE BINS <br />8 CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN ANTICIPATED STORM DOES NOT CARRY WASTES OR POLLUTANTS OFF THE SITE DISCHARGES OF <br />MATERIAL OTHER THAN STORMWATER ONLY WHEN NECESSARY FOR PERFORMANCE AND COMPLETION OF CONSTRUCTION PRACTICES AND WHERE THEY DO NOT CAUSE OR <br />CONTRIBUTE TO A VIOLATION OF ANY WATER QUALITY STANDARD CAUSE OR THREATEN TO CAUSE POLLUTION CONTAMINATION. OR NUISANCE OR CONTAIN A HAZARDOUS <br />SUBSTANCE IN A QUANTITY REPORTABLE UNDER FEDERAL REGULATIONS 40 CFR PARTS 117 AND 302 <br />9 POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO SOLID OR LIQUID CHEMICAL SPILLS WASTES FROM PAINTS, STAINS SEALANTS GLUES LIMES PESTICIDES <br />HERBICIDES WOOD PRESERVATIVES AND SOLVENTS ASBESTOS FIBERS PAINT FLAKES OR STUCCO FRAGMENTS FUELS OILS. LUBRICANTS.AND HYDRAULIC RADIATOR OR <br />BATTERY FLUIDS FERTILIZERS, VEHICLE/EQUIPMENT WASH WATER AND CONCRETE WASH WATER. CONCRETE, DETERGENT OR FLOATABLE WASTES. WASTES FROM ANY <br />ENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL DEGREASING AND SUPERCHLORINATED POTABLE WATER LINE FLUSHING. DURING CONSTRUCTION. PERMITTEE SHALL <br />DISPOSE OF SUCH MATERIALS IN A SPECIFIED AND CONTROLLED TEMPORARY AREA ON -SITE, PHYSICALLY SEPARATED FROM POTENTIAL STORMVVATER RUNOFF WITH ULTIMATE <br />DISPOSAL IN ACCORDANCE WIT' I LOCAL. STATE AND FEDERAL REQUIREMENTS <br />10 DEWATERING OF CONTAMINATED GROUNDWATER. OR DISCHARGING CONTAMINATED SOILS VIA SURFACE EROSION IS PROHIBITED DEWATERING OF NON-CONTAMINATED <br />GROUNDWATER REQUIRES A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT FROM THE RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL BOARD <br />Ti GRADED AREAS ON THE PERMITTED AREA PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPES AT THE CONCLUSION OF EACH WORKING DAY DRAINAGE IS TO BE <br />DIRECTED TOWARD DESILTING FACILITIES <br />12 IHE PERMITTEE AND CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUE,LIC TRESPASS ONTO AREAS WHERE IMPOUNDED <br />WATER CREATES A HAZARDOUS CONDITION <br />13 THE PERMITTEE AND CONTRACTOR SHALL INSPECT THE EROSION CONTROL WORK AND INSURE THAT THE WORK IS IN ACCORDANCE WITH THE APPROVED PLANS <br />14 THE PERMITTEE SHALL NOTIFY ALL GENERAL CONTRACTORS. SUBCONTRACTORS MATERIAL SUPPLIERS LESSEES AND PROPERTY OWNERS THAT DUMPING OF CHEMICALS <br />INTO THE STORM DRAIN SYSTEM OR THE WATERSHED IS PROHIBITED <br />15 EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON NECESSARY MATERIALS SHALL BE AVAILABLE ON <br />SITE AND STOCKPILED AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES 'NHEN RAIN IS IMMINENT <br />16 ALL REMOVABLE EROSION PROTECTIVE DEVICES SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE 6 -DAY RAIN PROBABILITY FORECAST EXCEEDS 40% <br />17 SEDIMENTS FROM AREAS DISTURBED BY CONSTRUCTION SHALL BE RETAINED ON SITE USING AN EFFECTIVE COMBINATION OF EROSION AND SEDIMENT CONTROLS TO THE <br />MAXIMUM EXTENT PRACTICABLE . AND STOCKPILES OF SOIL SHALL BE PROPERLY CONTAINED TO MINIMI7E SEDIMENT TRANSPORT FROM THE SITE TO STREETS DRAINAGE <br />FACILI TIES OR ADJACENT PROPERTIES VIA RUNOFF VEHICLE TRACKING, OR WIND <br />18 APPROPRIATE BMPS FOR CONSTRUCTION-RELATED MATERIALS, WASTES SPILLS OR RESIDUES SHALL BE IMPLEMENTED AND RETAINED ON SITE TO MINIMIZE TRANSPORT <br />FROM THE SITE TO STREETS DRAINAGE FACILITIES OR ADJOINING PROPERTY BY WIND OR RUNOFF <br />COUNTY B.ECIRONK STAMP <br />C <br />O <br />V <br />E <br />R <br /> <br />P <br />A <br />G <br />E <br />801 E Borchard <br />Ave04/13/22
The URL can be used to link to this page
Your browser does not support the video tag.