My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002 W Alton Ave - Soils Report
PBA
>
Building
>
Soils Reports
>
A
>
Alton Ave
>
2002 W Alton Ave
>
2002 W Alton Ave - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 1:12:52 PM
Creation date
6/28/2021 8:57:13 AM
Metadata
Fields
Template:
Soils Report
Full Address
2002 W Alton Ave
Street Number
2002
Street Direction
W
Street Name
Alton
Street Suffix
Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />Geotechnical Solutions, Inc.TTClilE'Iv <br />--- <br />Geotechnical, Structural & Environmental Engineering <br />July 30,2019 <br />Project: D-3885-02 <br />Diocese of Orange <br />13280 Chapman Avenue <br />Garden Grove, Calilornia 92840 <br />PPROVED <br />A \1IT ISSUANCE <br />SOCIATES INC <br />r .\TE ,-/2 -2c) <br />rce to the <br />zation is <br />pending <br />pe <br />rcel <br />f a permrt based onI not bc conslrued to <br />tron ol tne applicable <br />mit lrresunled to give <br />the provisions of suchAttention: Mr. Joe Novoa <br />Director, Construction Management Services <br />Project:Christ Our Savior Catholic Church <br />2000 West Alton Avenue <br />Santa Ana, California 92704 <br />As requested, we performed pile analyses (axial and lateral) for concrete, both l4"X14" <br />and l6"Xl6" in size and steel pipe pile 16" diameter. Analyses are attached. <br />We are not recommending steel pipe pile, since steel pipe piles are subject to corrosion. <br />As swamp, peats and other organic soils are corrosive. To offset the eflect of corrosion, <br />an additional thickness of steel over the actual design cross-sectional area is generally <br />recommended. In many cases, factory-applied epoxy coating on pile may work <br />satisfactorily against corrosion. Concrete encasement ofsteel piles in corrosive zones also. ' <br />protect against corrosion. In any case we are not practicing corrosion engineering, but we <br />noted that the soils and water underlying the project site are corrosive. If steel piles are <br />used, a corrosion engineer should be consulted. <br />Geotechnical Solutions, Inc. <br />Dharma Shakya, PhD, PE, GE <br />Principal Geotechnical Engineer <br />,) <br />A braham S. Baha, PE, <br />Sr. Principal <br />\ <br />ssEFoR?s <br />(, <br />d <br />IC <br />ib. c06306'' <br />s. <br />ra <br />a <br />t <br />sES <br />F0 c <br />? <br />G= 2773 <br />R <br />C <br />S, <br />Phone: (949) 453-0406 27 Mauchly, Suite 210, Irvine, CA 92618 Fax: (949) 453-0409 <br />'d
The URL can be used to link to this page
Your browser does not support the video tag.