Laserfiche WebLink
advance of the start of construction. A joint meeting between the client, the contractor, and <br />the geotechnical engineer is recommended prior to the start of construction to discuss <br />specifi c procedures and scheduling. <br />+ rhe materia,s "",",,,",j00;:il1::'l::,:.|o}j'#[]o':"f ,aboratory testins prosram <br />are believed to be representative of the area. However, soil may vary in characters between <br />the exploratory borings. Since our investigation is based on the site materials observed, <br />selected laboratory testing, and engineering analyses, the conclusions and <br />recommendations are professional opinion. These opinions have been derived in accordance <br />with current standard of practice. <br />+ Based on our site investigation and recommendation, we believed that the proposed <br />improvements will not adversely impact adjoining site. <br />Page 13